Greenhouse Upgrades for USDA-ARS Lincoln, NE Research Location
Solicitation number
AG-32SD-S-16-SR04
Issued by

About this file

Updated / Revised Q As - Amendment 002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Extending solicitation close-date / time and clarifying Q&As

Shannon N. Robbie Contracting Officer / Contract Specialist

The purpose of this amendment is to clarify the answers to the Q&As previously posted, post additional Q&As, as well as to extend the solicitation's deadline to Thursday, May 12 at 4:00PM (MST).

Shannon N. Robbie Contracting Officer / Contract Specialist USDA-ARS-WBSC Acquisition Branch 2150 Centre Ave, Bldg D Fort Collins, CO 80526

Same as block 6

AG-32SD-S-16-SR04

05/06/2016

04/08/2016

SHANNON ROBBIE Digitally signed by SHANNON ROBBIE DN: c=US, o=U.S. Government, ou=Department of Agriculture, cn=SHANNON ROBBIE, 0.9.2342.19200300.100.1.1=12001000649842 Date: 2016.05.06 09:33:55 -06'00'

05/06/2016

Revised & Additional Questions and Answers

USDA-ARS Lincoln, NE Greenhouse Upgrades Project

Solicitation # AG-32SD-S-16-SR04

Amendment 002

1. Specification sect . 13 34 13 p.7 2.15: Calls out the Environmental Control System in much detail and specifies MicroGrow Procom, this is in conflict with dwg sheet ME100 keynote #1.

a. Is it correct the Environmental Control System is to be MicroGrow Procoms, one for each zone, six in total?

Correction: System shall be Link4 IGROW 1200 as indicated on drawings, or an equal or better product such as possibly the MicroGrow Procoms. Six zones total.

2. Is it correct the Environmental Control System is to be MicroGrow Procoms, one for Environmental Control Systems, a new contactor box w/ appropriate relays for both new and equipment that remains is to be supplied for each zone (six total)?

Provide contactor box with appropriate relates for new and existing equipment to remain.

3. Is it correct that in addition to bid bond being required, that payment and performance bond is required (this bid will be in excess of $75,000) for not only the general contractor, but also for each subcontractor?

Yes

4. The specifications and dwgs make reference to 8mm polycarbonate (PC) panels, after yesterday’s site visit the glazing is actually 16mm thick. Is it correct that all reference to 8mm should be changed to 16mm?

Yes- 16mil

5. Specification sect. 13 34 13 p.5 2.8 Side Vents states sidewall vents are to be 27” with continuous socket hinge. The side vent when assembled and installed shall be made up of a top rail, bottom rail and mullions of extruded aluminum and bolted together. Is this correct?

Yes- or manufacturer’s standard

6. Specification sect. 13 34 13 p. 6 2.12 Glazing refers to 8mm polycarbonate, is it correct that this was in error and it should be 16mm Impact Modified Acrylic?

Correction: Yes- 16mil, but it must be polycarbonate (not impact modified acrylic)

(Project requires “Clear 16mm Triple Wall Polycarbonate Panels”, equal or better)

7. General Note A of the Drawings states that the structures have not/will not receive a “lead free certification” despite undergoing lead abatement for “all wood framing”. Note A also states the Contractor shall follow local, State & Federal regulations regarding suspected lead.

Some of the proposed work proposes reusing and repainting existing portions of structures.

Therefore, should one assume no lead paint is present on the existing wood surfaces this project will disturb? Or should one assume for bidding purposes, that if post-hazard assessment confirmed lead paint is found, it is to be contained/encapsulated if refinishing/disturbing existing structure, rather than abated before repainting?

Yes, if lead paint is encountered it shall be encapsulated. All wood surfaces have been abated, scraped, down to “mostly” bare wood, however, there are some areas where very thin paint or discolored wood remains. Bottom line is caution needs to be used.

8. Is a hazardous materials survey (ACM &/Or Lead) of the greenhouses available for bidder use?

No

9. Will a Plumbing/Mech. Specification be issued to address means & methods for CV replacement on existing steam heat system?

Steam control valve to be replaced by isolating steam valve by shut off valves to the system. Strainers immediately upsteam of the control valves (if present) shall be cleaned prior to installing control valve. Control Valve to be installed in accordance with manufacturer’s installation instructions.

10. Alternate #2 - There is no room for outside lifting equipment on the west wall of the East house or the east wall of the West house due to a metal building. Should the vents on these two walls remain as inside lifting vents?

YES, all the vent units operate from the interior.

11. Vent Drive Units - The written specification refers to “Lock 12 units”. The drawing refers to “Wadsworth VC100 units”. I believe the correct unit for this project is the “Lock EWA 10 unit” which is appropriate for these size vents and is set up for line voltage limits. The Lock 12 is oversized for these vents. Please approve usage of the Lock 10 unit.

Lock 10 or Wadsworth units are acceptable if rated for minimum 500in/lb

12. Racks & Pinions - The written specification refers to an aluminum rack. Ridder racks and pinions use steel in their products and do not have the wear down issues of the softer aluminum racks. May I substitute the steel Ridder products?

We have no issue with this, however, would prefer a warranty against rust.

13. Clarification:

In some of the add/alternates, there is work on the end walls. Drawing A100 shows work on the end walls, note # 4 – both demo and construction.

In regards to past performance:

Page 3 of the solicitation mentions to submit past performance for five customers for which you have completed jobs within the past year, however if you don’t have that many just submit what you can, and if you don’t have any at all then your company would just receive a “neutral” score for past performance if none are submitted.

This is a list of the companies that attended the Lincoln, NE Greenhouse Project site visit.

The following companies were in attendance:

United Greenhouse Systems, Edgerton, WI Rough Brothers, Inc., Cincinnati, OH Mark VII Enterprises, Omaha, NE American Construction Services, Fort Collins, CO Shekar Engineering, Des Moines, IA RGC Constructors, Inc., Omaha, NE Gregg Electric, Lincoln, NE Cerebral Group LLC, Des Moines, IA