Questions_and_Answers.docx

DOCX document 12 KB Posted

Attached to
Construction 60' x 168' pre-engineering metal building Federal contract opportunity
Solicitation number
AG-32SD-S-16-0020
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Construction 60' x 168' pre-engineering metal building, newest first.
File Type Posted
SF1442 _corrections_Aug_3.pdf PDF
PS73SPECS_rev_7-25-16 _rev_8-3-16.doc DOC document
PS73SPECIFICATIONS_7-25-16.doc DOC document
AG-32SD-S-16-0020 _prov-clauses rev1.doc DOC document
SF1442 _converted_to_RFP.pdf PDF
2016PS73_ drawings.pdf PDF
AG-32SD-S-16-0020 _prov-clauses.doc DOC document
1442.pdf PDF
PS73SPECIFICATIONS.pdf PDF
GenDec S-16-0020.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers, 7-25-2016

Specification Section 1360 2 a. calls for a gable roof type, 1/12 pitch, the plans call for a single slope roof. Please clarify The building is to be a single slope roof.

Specification Section 1360 9 a. Refers to inside panels, please verify that liner panels are not required for the interior walls and ceiling.

There are no liner panels required.

Specification Section 1360 13 a. Call for insulation that contradicts the plans. Please Clarify 4” Insulation is to be submitted for option #2 for the roof and walls. Note: 6” was desired for the roof, but some manufacturers apparently cannot make this work.

Specification Section 1360 13 c 2. Please verify there are no skylights required for this project.

There are no skylights for this project.

Will design calculations be required for this project? Will the foundation design need to be prepared by a structural engineer?

Design calculations are not required for this project for the concrete. Plans show concrete design. Metal building loadings are to be submitted as part of the submittal process.