UNITED STATES DEPARTMENT OF AGRICULTURE

UNITED STATES NATIONAL ARBORETUM

3501 NEW YORK, AVE. N.E.

WASHINGTON, D.C. 20002

STATEMENT OF WORK AND SPECIFICATION

For

REMOVAL AND INSTALLATION OF ROOF PANELS ON THE

CHINESE PAVILION

U.S. NATIONAL ARBOREUM

WASHINGTON, DC

July, 2014

STATEMENT OF WORK

PROJECT NUMBER:

PROJECT LOCATION: US National Arboretum, Washington, D.C.

DESCRIPTION OF WORK: One Base Year and Four, One Year Option Periods To Install and Remove Roof Panels on the Chinese Pavilion In accordance with this contract, the contractor shall provide all labor, material, equipment, and transportation to include all accessories and incidentals necessary to complete this job abiding by applicable Federal, State and local regulatory guidelines.

NOTE: THE CONTRACTOR SHALL NOTIFY THE CO or COR 24 HOURS BEFORE ANY WORK IS SCHEDULED TO START. The contractor shall be required to notify the CO and/or COR in the event of any change in a scheduled work day. All contractor's work shall be monitored and inspected by USNA personnel and shall be performed in accordance with this statement of work.

The Contractor shall perform the work as follows:

Scope of Work

The Chinese Pavilion is part of the National Bonsai and Penjing Museum at the U.S. National Arboretum. The steel and concrete block structure has a lightweight removable roof system made of aluminum and polycarbonate panels that are stored in the basement of the pavilion during the growing season. Access to the basement is from the garage door located on the east side of the building. The interchangeable roof panels are removed and stored and stacked on end in the southern part of the basement each spring and re-installed each fall. In the fall, the roof panels are set in place to maintain a protective structure for the winter. There are four (4) ridges that run east to west. There are 16 interchangeable panels and 8 end panels for each ridge.

NOTE: Due to light nature of the panels, it is important that they are secured at the end of each work day. Also care should be exercised when carrying the panels so that they are not lifted due to wind.

The roof panels are light and can be carried by one person normally; however, some may require two people. Panels are to be hand carried from the basement in the fall and set in place.

Matching aluminum strips are used to anchor the roof panels so they stay in place. In the spring the reverse procedures are used to remove the roof panels.

The Arboretum requires a qualified contractor to remove the roof panels in mid-April and to re-install the roof panels in early-November time frames.

Statement of Work

Tasks:

Special Instructions:

Note: The contractor must work with the Bonsai Staff at the USNA to ensure that the bonsai plants housed in the Chinese Pavilion are protected during the installation and removal of the panels. Only authorized USNA staff members will move the trees as needed to ensure that they are not damaged. The bonsai trees are priceless and cannot be replaced.

1. The contractor shall coordinate the work for the roof panel removal and installation schedule with the designated COR and Carole Bordelon, Supervisory Horticulturist. Work to remove the panels is to be performed during the second week of April, depending on the weather, and the roof panels will be reinstalled during the second week of November, depending on the weather.

2. The contractor shall access the roof by using a contractor supplied ladder or scaffolding from the floor of the Chinese Pavilion below and from the floor of the “Grow Out Area” to the east of the Chinese Pavilion. A crane or “cherry picker” is not required.

3. During the second week of April, depending on the weather, the contractor shall remove the anchor screws and aluminum hold down strips and store in the southern end of the basement.

Care must be used when handling panels to ensure that they are not dropped or dragged to avoid damage to aluminum edges. Damaged panels shall be clearly marked “Damaged” and segregated from the other panels in a designated area in the southern end of the basement.

4. In early November, the contractor shall clean the roof support with water and a broom to remove any foreign materials from roof supports and the gutter channel. Material shall not be dropped on the interior of the Chinese Pavilion below, but shall be placed in appropriate trash bags and removed from the Arboretum grounds and disposed in an appropriate manner.

Following cleaning, the contractor shall install roof panels and anchor them with the provided aluminum hold down strips and anchor screws. The contractor shall provide proper additional anchor screws required due to loss or damage, to include removing and replacing any screws that are broken off in the support frame.

5. The contractor shall provide a report via email to the Contracting Officer on any damaged roof panels or aluminum hold down strips that require repair or replacing or any other damage to the benches, fixtures and fencing that may occur during installation. (Report must be provided within 5 business days of finding the damage.)

6. General:

A. Field Verification: It is the responsibility of the contractor to field verify all measurements, quantities and field conditions prior to bidding and commencing work.

The scope of work is provided based on the Government’s best available information but must be verified to ensure accuracy.

B. Staging: All equipment, supplies and materials for this contract shall be stored in the work area at the contractors own risk. The buildings and grounds at USNA will be secured at the end of each day by USNA Security. USNA is not responsible for any of the contractor's stored material and equipment, either inside or outside the building, at any time.

C. Working Hours: Unless otherwise noted, all work shall be performed between the hours of 8:00 am to 4:00 pm, Monday through Friday, exclusive of Federal Holidays.

D. Coordination: The contractor shall coordinate by phone or email with the designated COR with adequate advance notice, all work which will require an inconvenience or work stoppage to Government personnel due to noise, dust, extreme temperatures, and exposure to chemical fumes or interruption in utilities.

7. Period of Performance:

The base period of performance will be November 1, 2014 through October 31, 2015.

Option 1 – November 1, 2015 through October 31, 2016 Option 2 – November 1, 2016 through October 31, 2017 Option 3 – November 1, 2017 through October 31, 2018 Option 4 – November 1, 2018 through October 31, 2019