Amendment 0001.pdf

PDF 65 KB Posted

Attached to
EWP Streambank project - Flagler Run
Solicitation number
AG2D37S080156
Issued by

About this file

Amendment to incorporate mobilization specification

View the file

Other files

File Type Posted
S 08 0156 abstract.xls XLS spreadsheet
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Contractor tidbits.doc DOC document
DBA _Monroe.txt TXT text file
SF_1442 - HBG template.pdf PDF
Drawing pakage.pdf PDF
30K plus terms and clauses.rtf RTF text file
PA DEP conditions.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODlFlCAlTON NO.

6. ISSUED BY

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

CODE 7. ADMINISTERED BY (If other than Item 6) CODE I

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

12. ACCOUNTING AND APPROPRIATION DATA (If required)

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

1 OA. MODIFICATION OF CONTRACT/ORDER NO.

1 OB. DATED (SEE ITEM 11)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR- 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D.

A.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1OA, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

(X)

Construction Specification —Mobilization and Demobilization

1. Scope The work consists of the mobilization and demobilization of the contractor's forces, equipment, and operating supplies necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.

2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable;

and other items specified in section 4 of this specification.

Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.

This work includes mobilization and demobilization required by the contract at the time of award.

If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.

3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.

Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.

VECP.pdf
52.248-3 -- Value Engineering – Construction (Sep 2006)
contract id:
pg: 1
pg2: 2
amendment: 0001
effect date: 6/3/2008
pur no:
project no:
issued by': Contracting Officer

USDA-NRCS

One Credit Union Place, Suite 340 Harrisburg, PA 17110-2993

code: 122D37
code2:
issued by'2:
contractor:
code3:
facility code:
blank: Yes
blank2: Off
amend no: AG 2D37 S 08 0156
9b: 5/14/2008
10a:
10b:
11: Off
11a: Yes
copies:
above: Yes
acct data:
13: Off
13b: Off
13d: Off
authority:
authority2:
authority3:
contr: Yes
contr2: Off
num copies:
descrip: This amendment hereby incorporates the attached mobilization specification into the solicitation and ensuing contract.
15a:
16a: Tim Sittig
15b:
15c:
16c: 6/3/2008
16b: /s/ Tim Sittig