Site Showing Notes 07292010.docx
DOCX document 14 KB Posted
- Attached to
- EWP-Streambank Stabilization - Fowlerville Road Bridge Site, Town of Concord, Erie County, NY
- Solicitation number
- AG-2C31-S-10-0005
About this file
Notes from Site Showing held 7/29/2010
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Emergency Watershed Protection (EWP) Site Showing Notes – July 29, 2010 Town of Concord / Fowlerville Road Site
AG-2C31-S-10-0005
NRCS Representatives in attendance: Lauri Eipp, Contracting Officer; Mike Shinnick, Engineer; and Dan Bennett, Engineer; John Whitney, District Conservationist; Jim Bielli, Student Intern.
Lauri review contract requirements:
· Federal Contract (different than state and local) – but sponsored by Erie County
· OSHA + additionally NRCS Safety requirements apply
· Must submit safety plan and someone certified in first aid on site at all times.
· Davis Bacon wage rates – must submit certified payrolls
· Encouraged all interested to download entire contract package including Plans and specs on Federal Business Opportunities website
· Cost estimated at less than $100K - No bid bond required
· Payment bond required after award by successful low bidder (50% of bid price)
· August 5 bid opening at 11 a.m.
· Successful contractor must register in the Central Contractor Registration (CCR) database
· 10 day performance time from point notice to proceed issued
· Have 3 days to mobilize
· No Sunday work
· Taxable job – contractor is not exempt from paying local/state sales tax on materials
· Only bid on those projects you want and are capable to perform - if you bid on them all you will be expected to perform on them all within the stated performance time.
· Be sure to sign Bid Form – SF 1442
Mike covered technical requirements:
· Erosion and Sediment Control plan must be submitted
· Pay attention to rock gradation – heavy side of medium rock stone fill. May be necessary to hand pick from quarry
· Pay items are by LF
· Gravel bedding from on-site – do not expect to have to bring any in
· Hard hats required
· No access on south side unless needed
· Plant materials are included in this solicitation and must be provided and installed
· NRCS does layout
· Continuous inspection
· Call before you dig – gas line location shown on drawings – Call 811
· Sponsor Erie County DPW
· May have to remove guard rail – your call
Questions:
Q - Control?
A - PK nails on road
Q – Can access from south side?
A – At this time there is no access on south side – Sponsor is working on this and expect to have before construction begins. So yes, if access is acquired. However, it is wet and much less desirable.
Q – Staging Area – can more area be in the landowners yard?
A – Yes, so long as you remain within the construction limits and shown on the drawings.
Q – Must pay taxes?
A – Yes – not tax exempt
Q – Can we get CAD drawings?
A – Yes – if necessary upon contract award.