AG-2B46-S-16-0035.pdf
PDF 6 MB Posted
- Attached to
- Property Restoration in Boston Virginia
- Solicitation number
- AG-2B46-S-16-0035
About this file
Solicitation AG-2B46-S-16-0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2__SF25A-16Payment_bond.pdf | ||
| Coversheet-_Table_contents.pdf | ||
| Attachment_1__SF25-16Per.bond.pdf | ||
| Attachment_3__wh347.pdf | ||
| PresolicitationAG-2B46-S-16-0035.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
803160
NRCS-HQ-122B46
USDA-NRCS CONTRACTING TEAM 2
1400 INDEPENDENCE AVENUE, SW
ROOM 6801-S
NRCS-HQ-122B46
WASHINGTON DC 20250
Jane LaBorde
Electronic Proposals accepted at:
Jane.LaBorde@wdc.usda.gov OR USDA-NRCS, 451 West Street, Amherst, MA 01002
Jane LaBorde 413-253-4357 x
09/20/2016
AG-2B46-S-16-0035
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Contractor to provide all materials, equipment and labor to complete the Elmwood
Farm restoration project in compliance with this solicitation. All work must be in compliance with all Federal and State laws as well as OSHA. The property is located in Culpeper County, Virginia.
Incorporated:
1. Bid Schedule
2. Statement of work (specifications)
3. Drawings/Maps
4. Clauses
5. Davis Bacon Wage Determination
Per FAR 36.204 The Construction Magnitude is: $100,000 to $250,000.00
NAICS: 238910 Site Preparation Contractors is: $15.0 mil
Contractor must have an active registration in SAM (www.sam.gov)
Contractor must meet SDVOSB active verified CVE in VIP database (www.vip.gov)
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
7 0 calendar days and complete it within ________________ ________________ calendar days after receiving
11/28/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-NRCS, MASSACHUSETTS STATE OFC
451 WEST ST.
AMHERST MA 01002
NRCS-MA-121320
Jane LaBorde
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-2B46-S-16-0035
Delivery: 46 Days After Notice to Proceed
Delivery Location Code: NRCS-VA-1233A7
USDA-NRCS-VIRGINIA STATE OFFICE
1606 SANTA ROSA RD
SUITE 209
RICHMOND VA 23229 US
FOB: Destination
001 Line item 1. Elmwood/Vogel WRP Easement, Culpeper
Co., 20 approx. acres NEST#6633A713-01DCM
*Federal Restoration Contract*
Product/Service Code: Y1KZ
Product/Service Description: CONSTRUCTION OF
OTHER CONSERVATION AND DEVELOPMENT FACILITIES
BID/QUOTE SCHEDULE
1.Clearing & Grubbing 1 LS $____________
Spec.# 2
2.Structure Removal 1 LS $____________
Spec.# 3
3.Seeding & Mulching 1 LS $____________
Spec.# 6
4.Mobil & Demob. 1 LS $____________
Spec.# 8
5.Ditch Block 1 LS $____________
Spec.# 407
6.Rock Structures 110 TN $____________
Spec.# 407
(Subject to Variation Qty Clause)
7.Hatitat Enhancement 1 LS $____________
Spec.# 407
8.Acces Road & Stream Crossing 1 LS
Spec.# 426
9.Construction Access 1 LS $____________
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-2B46-S-16-0035
Spec.# 426
Property Location:
Elmwood Farm
6276 Sperryville Pike
Boston, VA 22713
Subject to the availability of funding.
NO WORK ON FEDERAL HOLIDAYS:
January New Year's Day
January Birthday of Martin Luther King, Jr.
February Washington's Birthday
May Memorial Day
July Independence Day
September Labor Day October Columbus Day
November Veterans Day
November Thanksgiving Day
December Christmas Day
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Statement of work summary
The work consists, not all inclusive, of the following:
Site preparation, fence removal, forest thinning, access road improvement and the installation of rock structures, ditch blocks and brush piles on 25.8 acres of WRP in Culpeper County no later than February 1, 2017. The expected completion is within 45 days of notice to proceed.
o clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from the designated areas.
o The removal, salvage, and disposal of structures (including fences) from the designated areas.
Disposal of refuse materials, no disposal will be allowed on site.
o Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
o Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
o Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It shall include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.
o Furnishing all material, equipment, and labor necessary for the installation of geotextiles.
o Installing various structural and vegetative measures for wetland restoration.
o Constructing and/or maintaining the Access Roads as shown on the drawings.
o Mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work.
See statement of work for exact details.
Statement of work takes precedence of this summary.
AG-2B46-S-16-0035
NRCS- 4/2016
VA- Elmwood Farm Wetland Restoration
Index of Construction and Material Specifications
No. Construction Specification
2 Clearing and Grubbing
3 Structure Removal
5 Pollution Control
6 Seeding, Sprigging and Mulching
8 Mobilization and Demobilization
11 Removal of Water
95 Geotextile
407 Wetland Restoration
426 Access Roads
No. Material Specification
592 Geotextile
Blank page
(210-VI-NEH, May 2001) 2-1
Construction Specification 2—Clearing and Grubbing
1. Scope The work consists of clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from the designated areas.
2. Protection of existing vegetation Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or neglect shall be repaired by the contractor.
Earthfill, stockpiling of materials, vehicular parking, and excessive foot or vehicular traffic shall not be allowed within the drip line of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer.
Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.
Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk. All roots 1-inch or larger in diameter that are cut, broken, or otherwise severed during construction operations shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations shall be covered with moist earth or backfilled as soon as possible to prevent the roots from drying out.
3. Marking The limits of the area(s) to be cleared and grubbed will be marked by stakes, flags, tree markings, or other suitable methods. Trees to be left standing and uninjured will be designated by special markings placed on the trunk about 6 feet above the ground surface.
4. Clearing and grubbing All trees not marked for preservation and all snags, logs, brush, stumps, shrubs, rubbish, and similar materials shall be cleared from within the limits of the designated areas. Unless otherwise specified, all stumps, roots, and root clusters that have a diameter of 1 inch or larger shall be grubbed out to a depth of at least 2 feet below subgrade for concrete structures and 1 foot below the ground surface at embankment sites and other designated areas.
5. Disposal All materials cleared and grubbed from the designated areas shall be disposed of at locations shown on the drawings or in a manner specified in section 7. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from disposal at locations away from the project site.
6. Measurement and payment Method 1—For items of work for which specific units prices are established in the contract, the cleared and grubbed area is measured to the nearest 0.1 acre. Payment for clearing and grubbing is made for the total area within the designated limits at the contract unit price. Such payment will
(210-VI-NEH, May 2001) 2-2 constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific unit prices are established in the contract, the length of the cleared and grubbed area is measured to the nearest full station (100 feet) along the line designated on the drawing or identified in the specifications. Payment for clearing and grubbing is made for the total length within the designated limits at the contract unit price. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 3—For items of work for which specific unit prices are established in the contract, each tree, stump, and snag having a diameter of 4 inches or larger and each log having a diameter of 4 inches or larger and a length of 10 feet are measured before removal. The size of each tree and snag is determined by measuring its trunk at breast height above the natural ground surface. The size of each log is determined by measuring the butt and by measuring its length from butt to tip.
The size of each stump is measured at the top. Diameter is determined by dividing the measured circumference by 3.14.
Payment for clearing and grubbing of each tree, stump, and snag having a diameter of 4 inches or larger and each log having a diameter of 4 inches or larger and a length of 10 feet or larger is made at the contract unit price for its size designation as determined by the following schedule:
Measured diameter Size designation
(in) (in)
4 to 8 6 8 to 12 10 12 to 24 18 24 to 36 30 36 to 60 48 Over 60 60
The sum of such payments shall constitute full compensation for clearing and grubbing (including the clearing and grubbing of smaller trees, stumps, snags, logs, brush, shrubs, and roots), applicable permits and associated fees, and rubbish removal. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 4—For items of work for which specific lump sum prices are established in the contract, payment for clearing and grubbing is made at the contract lump sum price. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7.
VA- Elmwood Farm Wetland Restoration 2-3
7. Items of work and construction details Items of work to be performed in conformance with this specification and construction details are:
A. Bid Item 1, Clearing and Grubbing
1) This item shall consist of all clearing and grubbing required for the installation of the works of improvement as shown on the drawings. This item also includes clearing and grubbing all areas necessary for implementation of the erosion and sediment control plan as approved by Culpeper County.
2) Actual clearing and grubbing limits will be the minimum necessary to accomplish the work. Clear and grub all work areas to at least 5 feet beyond the limits of the constructed works.
3) The Contractor shall submit a clearing and grubbing plan illustrating the proposed schedule and methods of disposal to the COR for approval 10 days prior to commencing work. Clearing and grubbing operations shall not begin until the plan has been approved.
4) In Section 5, Disposal, all materials resulting from Clearing and Grubbing shall remain onsite and shall be used to construct the Brush Piles.
5) Measurement and payment shall be made by Method 4 of Section 6.
6) Items of work subsidiary to this Bid Item are:
a. Pollution Control, Construction Specification 5
b. Removal of Water, Construction Specification 11
(210-VI-NEH, May 2001) 3-1
Construction Specification 3—Structure Removal
The work shall consist of the removal, salvage, and disposal of structures (including fences) from the designated areas.
2. Marking Method 1—Each structure or structure part to be removed will be marked with stakes, flags, paint, or other suitable method.
Method 2—The area boundaries from which structures must be removed will be marked using stakes, flags, paint, or other suitable method. Structures to remain undisturbed or to be salvaged will be designated by special markings.
3. Removal Method 1—All structures designated for removal in the contract shall be removed to the specified extent and depth.
Method 2—Within the areas so marked, all visible and buried structures identified shall be removed to the specified extent and depth.
4. Salvage Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections. Such structures shall be neatly and systematically match marked with paint before disassembly. All connectors and other parts shall be marked to indicate their proper location within the structure and shall be fastened to the appropriate structural member or packed in suitable containers.
Material from fences designated to be salvaged shall be placed outside the work area on the property on which the fence was originally located. Fence wire shall be rolled into uniform rolls of suitable size and neatly piled with other salvaged materials. Posts and rails shall be neatly stacked.
5. Disposal of refuse materials Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer. Disposal by burning shall be in accordance with local rules and regulations.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established by the contract, payment for the removal of each structure unit, except fences, is made at the contract unit price.
Fences removed or removed and salvaged are measured to the nearest linear foot. Payment for fence removal or removal and salvage is made at the contract unit prices for each type and size of fence.
(210-VI-NEH, May 2001) 3-2
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific lump sum prices are established by the contract, payment for structure removal is made at the contract lump sum price.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed as a contract line item number in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
NRCS – 4/2016 3-3
VA – Elmwood Farm Wetland Restoration
7. Items of work and construction details Items of work to be performed in conformance with this specification and construction details
A. Bid Item 2, Structure Removal
1) This item shall consist of all work required for removal and disposal or salvage of all structures interfering with the installation of the work. This item also includes backfilling or reshaping as necessary after removal. Structures include:
a. Existing fence, gates, and appurtenances.
b. Existing culverts within the WRP easement.
c. Removal of all related items interfering with the installation of the Access Road and Stream Crossings within the WRP easement.
2) In Section 2, Marking, there will be no marking of structures to be removed. The structures to be removed are located on the drawings. All structure removal shall be subject to the approval of the COR.
3) In Section 3, Removal, Method 1 shall apply.
4) In Section 5, Disposal of refuse materials, no disposal will be allowed on site. All materials resulting from Structure Removal shall become the property of the Contractor and removed from the site and disposed of in accordance with all applicable federal, state, and local regulations, unless otherwise designated as salvage.
5) Measurement and Payment shall be made by Method 2 of Section 6.
6) Items of work subsidiary to this Bid Item are:
(210-VI-NEH, January 2009) 5-1
Construction Specification 5—Pollution Control
1. Scope The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2. Material All material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or
(210-VI-NEH, January 2009) 5-2 transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate State and Federal regulations. At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will
(210-VI-NEH, January 2009) 5-3 be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
NRCS - 4/2016
VA – Elmwood Farm Wetland Restoration 5-5
8. Items of work and construction details Items of work to be performed in conformance with this specification and construction details are:
A. Subsidiary Item, Pollution Control
1) This item shall consist of scheduling operations, obtaining the required permits and plans, performing work and installing, maintaining and removing erosion and sediment control measures required to control erosion and minimize the production of sediment and other pollutants to the water and air during construction operations.
2) Unless otherwise noted, all vegetative and structural erosion and sediment control measures shall be constructed and maintained in accordance with the 1992 edition of the Virginia Erosion and Sediment Control Handbook or other documents required by the erosion and sediment control permitting agency.
3) The Contractor shall be responsible for installation of any additional erosion and sediment control measures necessary to prevent erosion and sedimentation as determined by the COR or the erosion and sediment control permitting agency.
4) The Contractor shall inspect all erosion and sediment control measures weekly and after each runoff producing rainfall event. Any necessary repairs to restore the measures to meet the standards of the Virginia Erosion and Sediment Control Handbook or cleanup from the failure of such measures shall be made immediately.
5) Temporary soil stockpiles shall be stabilized with temporary seeding or protected with sediment trapping measures.
6) The Contractor shall schedule excavation and moving of soil materials so that the smallest possible areas will be unprotected from erosion for the shortest time feasible.
7) Disturbed areas not scheduled to have work done in them for seven (7) days shall have mulch applied at a rate of 2 tons per acre. Mulch materials shall conform to the requirements of Construction Specification 6, Seeding, Sprigging, and Mulching. Disturbed areas not scheduled to have work done in them for 14 days shall have temporary seeding applied as outlined in Construction Specification 6, Seeding, Sprigging, and Mulching.
8) All temporary erosion and sediment control measures shall be removed as directed by the erosion and sediment control permitting agency.
9) During dewatering operations, the effluent shall be filtered through a device approved by the erosion control permitting agency or pumped into a temporary sediment basin or sediment trap that has been constructed in accordance with the Virginia Erosion and Sediment Control Handbook. All facilities installed by the Contractor to contain chemical pollution, as described in Section 4, shall be removed in their entirety from the site following completion of the work.
10) Haul roads, access roads, and other areas capable of producing dust shall be kept as moist as necessary to prevent fugitive dust emission.
11) The Contractor shall provide sanitary facilities (chemical toilets) at the site. Toilets shall be located within the work limits. The Contractor shall be responsible for maintaining the toilets in a clean, healthy manner and removing them from the site at the completion of work.
NRCS - 4/2016
VA – Elmwood Farm Wetland Restoration 5-5
12) No separate payment will be made for Pollution Control. Compensation for this item will be included in the payment for :
a) Bid Item 1, Clearing and Grubbing, Construction Specification 2
b) Bid Item 2, Structure Removal, Construction Specification 3
c) Bid Item 5, Ditch Block, Construction Specification 407
d) Bid Item 6, Rock Structures, Construction Specification 407
e) Bid Item 7, Habitat Enhancement, Construction Specification 407
f) Bid Item 8, Access Road and Stream Crossings, Construction Specification 426
(210-VI-NEH, May 2001) 6-1
Construction Specification 6—Seeding, Sprigging, and Mulching
The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
2. Material Seed—All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in section 7.
Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted.
The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the contracting officer.
Fertilizer—Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight.
When required by the contract, a representative sample of the fertilizer shall be furnished to the contracting officer for chemical analysis.
Inoculants—The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treatment and shall not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments—Lime shall consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State Department of Agriculture. Other soil amendments shall meet quality criteria and application requirements specified in section 7.
Mulch tackifiers—Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations shall be as specified in section 7.
Straw mulch material—Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material shall be air-
(210-VI-NEH, May 2001) 6-2 dry, reasonably light in color, and shall not be musty, moldy, caked, or otherwise of low quality.
The use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the contracting officer for determining weight of mulch furnished.
Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in section 7.
4. Seedbed preparation and treatment Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations shall be removed or disposed of as specified in section 7.
Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the contracting officer's technical representative (COTR).
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in section 7. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments shall be applied as specified in section 7. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh shall be as specified in section 7. Mulches shall be applied uniformly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour. Hand methods shall be used where equipment cannot safely operate to perform the work required.
(210-VI-NEH, May 2001) 6-3
The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be buried or securely anchored using spikes or staples as specified in section 7.
The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted. Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in section 7 and the area calculated to the nearest 0.1 acre.
Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.
When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted. Payment is made at the contract unit price and will constitute full compensation for completion of the work.
Method 2—For items of work for which specific lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump sum price for the item and will constitute full compensation for the completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds. Progress payments will be determined as specified in section 7.
Payment of the lump sum contract price will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the item(s) to which they are made subsidiary are identified in section 7.
NRCS – 4/2016
VA – Elmwood Farm Wetland Restoration 6-4
7. Items of work and construction details Items of work to be performed in conformance with this specification and construction details are:
A. Bid Item 3, Seeding and Mulching
1) This item shall consist of final seeding and mulching all disturbed areas within the work limits.
2) Seeding, and mulching shall be performed within 5 days from disturbance unless the seedbed cannot be properly prepared due to wetness, snow, or frozen soil or as otherwise directed by the
COR.
3) In Section 3, Seeding mixtures, dates of planting, application rate and planting times shall be as follows:
Species Seeding Rate Winter Wheat 2 bu./acre
Virginia Wild Rye 15 lbs./acre
Seasonal Nurse Crop*
20 pounds per acre
* Varies March through May 15; August 16 through October use Annual Rye (Lolium multiflorum)
May 16 through August 15 use Foxtail Millet (Setaria italica)
November through February use Winter Rye (Secale cereale)
All seed shall be certified in conformance with current rules and regulations of the Virginia Crop Improvement Association and shall be the latest crop available. Seed shall bear an official “Certified Seed” label. Seed shall be pure live seed (PLS).
4) Mulch materials shall be wheat, barley, oat, or rye straw. Application rates shall be 2.0 tons per acre. Straw mulch shall be anchored by making one pass with mulch crimper or tracked equipment. If tracked equipment is used the cleat tracts shall be perpendicular to the flow of water.
5) Roots, limbs, rocks greater than six inches, and other deleterious materials shall be removed from the seedbed and disposed offsite in accordance with all local, state and federal regulations.
6) Measurement and Payment shall be made by Method 2 of Section 6.
(210-VI-NEH, May 2001) 8-1
Construction Specification 8—Mobilization and Demobilization
The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable;
and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award.
If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
VA – Elmwood Farm Wetland Restoration 8-2
4. Items of work and construction details Items of work to be performed in conformance with this specification and construction details
A. Bid Item 4, Mobilization and Demobilization
1) This item shall consist of mobilizing and demobilizing the contractor’s personnel, equipment, and materials needed to perform the items of work under this contract as required by sections 1 and 2 of this specification.
2) The demobilization shall include but not be limited to, removal and disposal of all trash, debris, equipment, parts, supplies, and all other such items. This item shall also include the necessary labor and equipment to restore any area used by the contractor for staging, storage or any other reason, to its original preconstruction condition.
3) Payment will be made for only initial mobilization and demobilization of the equipment necessary to perform the work. No additional payment will be made for equipment moved from or back to the site.
4) Twenty-five percent (25%) of the lump sum payment will be held until the completion of the project to assure proper clean-up and removal of equipment, parts, supplies, and all other such items.
(210-VI-NEH, May 2001) 11-1
Construction Specification 11—Removal of Water
The work consists of the removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It shall include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.
2. Diverting surface water The contractor shall install, maintain, and operate all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow and other surface water through or around the construction site. Control of surface water shall be continuous during the period that damage to construction work could occur. Unless otherwise specified and/or approved, the diversion outlet shall be into the same drainageway that the water would have reached before being diverted.
The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities related to this activity during the process of completing the work as specified.
3. Dewatering the construction site Foundations, cutoff trenches, and all other parts of the construction site shall be dewatered and kept free of standing water and muddy conditions as necessary for the proper execution of the work. The contractor shall furnish, install, operate, and maintain all drains, sumps, pumps, casings, well points, and all other equipment required to properly dewater the site as specified.
Dewatering systems that cause a loss of soil fines from the foundation areas will not be permitted.
The contractor shall furnish the contracting officer, in writing, a proposed plan for dewatering before commencing with any construction activity for which dewatering may be required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities for completing the specified work.
4. Dewatering borrow areas The contractor shall maintain all borrow areas free of surface water or otherwise provide for timely and effective removal of surface and subsurface water that accumulates within the borrow area, unless waived in section 8 of this specification. Borrow material shall be processed as necessary to achieve proper and uniform moisture content at the time of placement.
If pumping to dewater borrow areas is included as a bid item of work in the bid schedule, each pump discharge pipe shall be equipped with a water meter. The meter shall be such that the measured quantity of water is accurate within 3 percent of the true quantity.