InvitationForBidsANFRoadConst.doc
DOC document 328 KB Posted
- Solicitation number
- AG-24H8-S-14-0020
About this file
IFB solicitation document - includes instructions for submitting a bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings.pdf | ||
| Specifications.doc | DOC document | |
| WageDetermination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-24H8-S-14-0020
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
04/23/2014
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY
CODE
| 8. ADDRESS OFFER TO |
North East Acquisition Team 4 Farm Colony Drive
Warren, PA 16365 Same as 7, Attn: Melissa Conn (deliver by hardcopy mail or hand deliver to the reception room)
9. FOR INFORMATION
CALL:
A. NAME
Melissa Conn B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 814-728-6241 mconn@fs.fed.us
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Forest Wide Road Reconstruction and Maintenance IDIQ on the Allegheny National Forest Base Year, plus 2 option years
The Government's estimate is less than $1,000,000 over 3 years.
Interested contractors shall submit this Standard Form 1442 (with blocks 14-20c completed ), Section B-Schedule of Items (prices inserted for all items and all years), and Section K-Reps and Certs (all information completed), to be received hardcopy at the address in block 7 by the due date & time in block 13A. Bids will be publicly opened at that time and any bidder may attend the opening. The outer envelope for all bids shall contain the solicitation number as shown in block 1. Late submissions shall not be considered. Fax or electronic submissions shall not be considered.
11. The Contractor shall begin performance within 10 calendar days and complete it within TBD calendar days after receiving
FORMCHECKBOX
award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
10 days of Task Order Issuance
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 8 by 2:00 PM ET (hour) local time 5/23/2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( 5 )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print) Melissa Conn
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BASE YEAR ( CY2014)
ITEM
NO.
| DESCRIPTION |
| PAY |
UNIT
| ESTIMATED QUANTITY |
| UNIT |
PRICE
EXTENDED
TOTAL
30326
Road Reconditioning
Mile
| 20 |
| $ |
| $ |
| 30109 |
| Aggregate Surface Course, grading DSA (limestone), (furnish & deliver only) in Hauling Vehicle-Actual Quantity |
| Ton |
| 1000 |
| $ |
| $ |
| 30109 |
| Aggregate Surface Course, grading PA-2A, (furnish & deliver only) in Hauling Vehicle-Actual Quantity |
| Ton |
| 1000 |
| $ |
| $ |
| 30109A |
| Aggregate Surface Course, Compaction Method B (placement only) |
| Ton |
| 2000 |
| $ |
| $ |
| 60201 |
| 16-Inch Steel Pipe casing |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60263 |
| 18-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60264 |
| 24-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 300 |
| $ |
| $ |
| 60265 |
| 36-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 120 |
| $ |
| $ |
| 60201A |
| 16-Inch Steel Pipe Casing - Installation |
| Linear Foot |
| 600 |
| $ |
| 60263A |
| 18-Inch Culvert Pipe - Installation |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60264A |
| 24-Inch Culvert Pipe - Installation |
| Linear Foot |
| 300 |
| $ |
| $ |
| 60265A |
| 36-Inch Culvert Pipe - Installation |
| Linear Foot |
| 120 |
| 25101 |
| Placed riprap, Class R-3, furnish and install |
| Ton |
| 60 |
| $ |
| $ |
| 25102 |
| Placed riprap, Class R-4, furnish and install |
| Ton |
| 40 |
| $ |
| $ |
| 25103 |
| Placed riprap, Class R-5, furnish and install |
| Ton |
| 40 |
| $ |
| $ |
| 20464 |
| Turnout Construction to typical detail |
| Each |
| 10 |
| $ |
| $ |
| 20465 |
| Turnout Reconstruction to typical detail |
| Each |
| 20 |
| $ |
| $ |
| 15101A |
| Mobilization for aggregate and riprap placement |
| Each |
| 3 |
| $ |
| $ |
| 15101B |
| Mobilization for culvert replacements |
| Each |
| 3 |
| $ |
| $ |
| 15101C |
| Mobilization for turnout construction and/or reconstruction |
| Each |
| 3 |
| $ |
| $ |
| 001 |
| Performance and Payment Bond Costs |
| Per $1,000 |
| 300 |
| $ |
| $ |
| TOTAL |
| $ |
Forest-wide Road Maintenance
Allegheny National Forest Warren, Forest, Elk & McKean Counties
OPTION YEAR #1 (CY2015)
ITEM
NO.
| DESCRIPTION |
| PAY |
UNIT
| ESTIMATED QUANTITY |
| UNIT |
PRICE
EXTENDED TOTAL
Mile
| 20 |
| $ |
| $ |
| 30109 |
| Aggregate Surface Course, grading DSA (limestone), (furnish & deliver only) in Hauling Vehicle-Actual Quantity |
| Ton |
| 1000 |
| N/A |
| N/A |
| 30109 |
| Aggregate Surface Course, grading PA-2A, (furnish & deliver only) in Hauling Vehicle-Actual Quantity |
| Ton |
| 1000 |
| N/A |
| N/A |
| 30109A |
| Aggregate Surface Course, Compaction Method B (placement only) |
| Ton |
| 2000 |
| $ |
| $ |
| 60201 |
| 16-Inch Steel Pipe casing |
| Linear Foot |
| 600 |
| N/A |
| N/A |
| 60263 |
| 18-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 600 |
| N/A |
| N/A |
| 60264 |
| 24-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 300 |
| N/A |
| N/A |
| 60265 |
| 36-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 120 |
| N/A |
| N/A |
| 60201A |
| 16-Inch Steel Pipe Casing - Installation |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60263A |
| 18-Inch Culvert Pipe - Installation |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60264A |
| 24-Inch Culvert Pipe - Installation |
| Linear Foot |
| 300 |
| $ |
| $ |
| 60265A |
| 36-Inch Culvert Pipe - Installation |
| Linear Foot |
| 120 |
| $ |
| $ |
| 25101 |
| Placed riprap, Class R-3, furnish and install |
| Ton |
| 60 |
| $ |
| $ |
| 25102 |
| Placed riprap, Class R-4, furnish and install |
| Ton |
| 40 |
| $ |
| $ |
| 25103 |
| Placed riprap, Class R-5, furnish and install |
| Ton |
| 40 |
| $ |
| $ |
| 20464 |
| Turnout Construction to typical detail |
| Each |
| 10 |
| $ |
| $ |
| 20465 |
| Turnout Reconstruction to typical detail |
| Each |
| 20 |
| $ |
| $ |
| 15101A |
| Mobilization for aggregate and riprap placement |
| Each |
| 3 |
| $ |
| $ |
| 15101B |
| Mobilization for culvert replacements |
| Each |
| 3 |
| $ |
| $ |
| 15101C |
| Mobilization for turnout construction and/or reconstruction |
| Each |
| 3 |
| $ |
| $ |
| 001 |
| Performance and Payment Bond Costs |
| Per $1,000 |
| 300 |
| $ |
| $ |
TOTAL
Forest-wide Road Maintenance
Allegheny National Forest Warren, Forest, Elk & McKean Counties
OPTION YEAR #2 (CY2016)
ITEM
NO.
| DESCRIPTION |
| PAY |
UNIT
| ESTIMATED QUANTITY |
| UNIT |
PRICE
EXTENDED TOTAL
Mile
| 20 |
| $ |
| $ |
| 30109 |
| Aggregate Surface Course, grading DSA (limestone), (furnish & deliver only) in Hauling Vehicle-Actual Quantity |
| Ton |
| 1000 |
| N/A |
| N/A |
| 30109 |
| Aggregate Surface Course, grading PA-2A, (furnish & deliver only) in Hauling Vehicle-Actual Quantity |
| Ton |
| 1000 |
| N/A |
| N/A |
| 30109A |
| Aggregate Surface Course, Compaction Method B (placement only) |
| Ton |
| 2000 |
| $ |
| $ |
| 60201 |
| 16-Inch Steel Pipe casing |
| Linear Foot |
| 600 |
| N/A |
| N/A |
| 60263 |
| 18-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 600 |
| N/A |
| N/A |
| 60264 |
| 24-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 300 |
| N/A |
| N/A |
| 60265 |
| 36-Inch Aluminized, Type 2 Coated, Corrugated Steel pipe, 0.064 inch thickness |
| Linear Foot |
| 120 |
| N/A |
| N/A |
| 60201A |
| 16-Inch Steel Pipe Casing - Installation |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60263A |
| 18-Inch Culvert Pipe - Installation |
| Linear Foot |
| 600 |
| $ |
| $ |
| 60264A |
| 24-Inch Culvert Pipe - Installation |
| Linear Foot |
| 300 |
| $ |
| $ |
| 60265A |
| 36-Inch Culvert Pipe - Installation |
| Linear Foot |
| 120 |
| $ |
| $ |
| 25101 |
| Placed riprap, Class R-3, furnish and install |
| Ton |
| 60 |
| $ |
| $ |
| 25102 |
| Placed riprap, Class R-4, furnish and install |
| Ton |
| 40 |
| $ |
| $ |
| 25103 |
| Placed riprap, Class R-5, furnish and install |
| Ton |
| 40 |
| $ |
| $ |
| 20464 |
| Turnout Construction to typical detail |
| Each |
| 10 |
| $ |
| $ |
| 20465 |
| Turnout Reconstruction to typical detail |
| Each |
| 20 |
| $ |
| $ |
| 15101A |
| Mobilization for aggregate and riprap placement |
| Each |
| 3 |
| $ |
| $ |
| 15101B |
| Mobilization for culvert replacements |
| Each |
| 3 |
| $ |
| $ |
| 15101C |
| Mobilization for turnout construction and/or reconstruction |
| Each |
| 3 |
| $ |
| $ |
| 001 |
| Performance and Payment Bond Costs |
| Per $1,000 |
| 300 |
| $ |
| $ |
TOTAL
Total Base Year Price Total Option Year 1 Price
Total Option Year 2 Price
Total Price - All years
Notes:
1. Any contract awarded will be an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract. All work identified throughout the life of the contract will be issued on individual task orders.
2. AGAR 452.216-73 Minimum and Maximum Contract Amounts (FEB 1988) During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of $25,000, but not in excess of $999,999.00.
3. Item 30326, Road Reconditioning will be for shaping the roadbed to remove rutting and/or potholes and to adequately receive any Aggregate Surface Course that may be applied, and shall be paid for per mile. The average roadway width for roads under this contract is 12 feet.
4. Item 30109, Aggregate Surface Course (furnish and deliver only), shall be bid for the first year only (through 12/31/2014). Aggregate prices for subsequent years will be based on contractor’s actual cost for materials plus reasonable overhead. Contractor will be required to submit documentation of the firm fixed price request for the 30109 items upon exercise of each option year. The agreed upon prices will become the firm fixed prices for that year.
5. Item 30109A, Aggregate Surface Course, Compaction Method B (placement only), shall pay for the cost of placement of the material provided under item 30109 and shall be paid for by the ton.
6. Items 60201, 60263, 60264 & 60265 (Culverts) shall be bid for the first year only (through 12/31/14). The culvert prices for subsequent years will be based on contractor’s actual cost for materials plus reasonable overhead. Contractor will be required to submit documentation of the firm fixed price request for the culvert items upon exercise of each option year. The agreed upon prices will become the firm fixed prices for that year.
7. Items 60201A, 60263A, 60264A & 60265A shall pay for the cost of removing an existing culvert and installing a new culvert provided under corresponding Items 60201, 60263, 60264 & 60265.
8. Items 25101, 25102 & 25103 will be for furnishing and placing a specified amount of riprap at the inlet and/or outlet end(s) of a culvert pipe. Riprap prices tend to vary less than aggregate and culvert prices, so these line items shall be priced for all years.
9. Items 20464 & 20465 will be for construction or reconstruction of turnouts along Forest Service system roads to the specified Typical Turnout Detail. Construction typically includes clearing of trees, grubbing of stumps and placement of aggregate base and surfacing. Reconstruction will include reshaping of existing turnout and placement of additional aggregate surfacing to bring it back to the Typical Turnout Detail. Necessary aggregate for turnouts will be priced separately under items 30109, so do not include the cost of aggregate in these turnout prices.
10. Item 15101 will be for the Mobilization of equipment necessary to perform the specified work requested in the corresponding Item for each task order issued. Each task order can have more than one mobilization charge depending on what type of work is included on the task order. For example if a task order involves aggregate surfacing and culvert installation, you would be paid for both items 15101A and 15101B for that task order.
11. Item 001 is for performance and payment bond costs and shall be paid at the rate offered in the schedule by the contractor on all task orders that require bonding. If an individual task order exceeds $30,000, bonding will be required and must remain in effect for one year following acceptance of the work. There is no bid guarantee required for this IDIQ contract or any of the task orders. Apparent low bidder must be able to prove bonding capacity of $1,000,000. Failure to provide bonds within ten days of a task order issuance is grounds for termination for default.
12. There is no pre-bid meeting scheduled. Any questions regarding this solicitation shall be submitted by email to mconn@fs.fed.us no later than May 12, 2014. All questions and cooresponding answers will be posted to www.fbo.gov on May 13, 2014.
13. The government plans to make one award from this solicitation. You must bid all items and all option years to be considered. Option year pricing shall include all anticipated increases in cost including increases in the cost of labor.
14. In order to be considered for award, all offerors must be registered in www.sam.gov. This is a free registration.
15. Awardee will be required to register in the Contractor Performance Assessment Reporting System upon contract award. http://www.cpars.gov/
16. This solicitation is set-aside for Hubzone Small Businesses only. Your firm must be registered as a Hubzone Small business with the Small Business Administration at the time an offer is submitted.
17. The first task order which is expected to be issued in 2014 will include road reconstruction on Forest Road 131 in Forest and Elk Counties, PA. The estimated cost of that task order is between $100,000 and $250,000. This task order will require a performance and payment bond.
18. Quantities in the schedule are estimates only and will vary from the quantities shown. Actual orders will be made through the issuance of task orders on this IDIQ contract during the life of the contract.
19. Price will be evaluated based on the total price-all years.
Blank page
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
Road Maintenance/Reconstruction Work Items will be performed under this contract. They will be issued as separate Task Orders throughout each Performance Period. The Work Items include: Road Reconditioning, Aggregate Surface Course placement, Culvert pipe replacement, Riprap placement, Turnout construction and Turnout reconstruction.
Project Location
Work will be performed on various Forest Service roads within the Allegheny National Forest. This includes Warren, Forest, Elk & McKean Counties.
AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Biobased & Recycled Content Products All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for biopreferred products that are required for performance of this construction project.
Lubricants, Industrial cleaners, hydraulic fluids, diesel fuel additives, hand cleaners, etc.
For more information regarding the Department of Agriculture Biobased Affirmative Procurement Program go to http://www.biopreferred.gov/bioPreferredCatalog/faces/jsp/catalogLanding.jsp The following is a list of categories for EPA designated products (recycled content) that are required for performance of this construction project.
Traffic cones, traffic signs, office products, engine coolants, lubricating oil, etc.
For more information regarding Environmental Protection Agency list of designate products to http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm
SAFETY AND HEALTH
1.1 SUMMARY
A. References: In addition to publications referenced in the Contract and FAR 52.236-13, the following Code of Federal Regulations (CFR) publications designate and define hazardous materials and conditions, and establish procedures for handling these materials and conditions.
1. 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards.
2. 29 CFR, Part 1926: OSHA Construction Industry Standards.
3. 40 CFR, Part 61: National Emission Standards for Hazardous Air Pollutants.
4. 40 CFR, Part 261: Environmental Protection Agency (EPA) Characteristics of Hazardous Waste.
5. 40 CFR, Part 761, EPA Polychlorinated Biphenyls (PCBs), Manufacturing, Processing, Distribution in Commerce and Use Prohibitions.
B. Acquisition of Publications: Referenced CFR publications may be purchased from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402.
1.2 SAFETY MEETING
A. Prior to commencing construction, representatives of the Contractor, including the Superintendent, shall meet with the Government to review the Contract's safety and health requirements.
B. The Contractor's safety and health program shall be reviewed, and implementation of safety and health provisions pertinent to the Work shall be discussed.
1.3 COMPLIANCE WITH REGULATIONS
A. Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable codes, standards and regulations pertaining to the health and safety of personnel during execution of the Work. The Contractor shall have written safety and health programs in compliance with 29 CFR Parts 1910 and 1926.
1.4 SUBMITTALS
A. Safety and Health Programs: The Contractor shall submit, for approval, copies of the project safety and health programs, as applicable to the work scope, or required as a result of the safety meeting, including but not necessarily limited to the following:
1. Occupational Noise Exposure.
2. Fall Protection.
3. Personnel Protective Equipment.
4. Heavy Equipment Operation
PART 2 - PRODUCTS
2.1 PERSONNEL PROTECTIVE EQUIPMENT
A. Special facilities, devices, equipment and similar items used by the Contractor in execution of the Work shall comply with 29 CFR Part 1910, Subpart I and other applicable regulations.
PART 3 - EXECUTION
3.1 EMERGENCY SUSPENSION OF WORK
A. In accordance with FAR 52.236-13, when the Contractor is notified by the Government, of noncompliance with safety or health provisions of the Contract, the Contractor shall immediately, correct the unsafe or unhealthy condition. In accordance with FAR 52.236-13 if the Contractor fails to comply promptly, all or part of the Work will be stopped by Government notice. The Contractor shall not be allowed any extension of time or compensation for damages in connection with a work stoppage for unsafe or unhealthy conditions.
3.2 PROTECTION OF PERSONNEL
A. The Contractor shall take all necessary precautions to prevent injury to the public, occupants, or damage to property of others.
3.3 ENVIRONMENTAL PROTECTION
A. Dispose of solid, liquid and gaseous contaminants in accordance with local codes, laws, ordinances and regulations.
B. Comply with applicable federal, state and local noise control laws, ordinances and regulations, including but not limited to 29 CFR 1910.95 and 29 CFR 1926.52.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
452.211-74 Period of Performance (FEB 1988) The Period of performance of this contract is from June 1, 2014 through December 31, 2016.
Each task order will have a negotiated completion date.
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within ___10___ days after the date of contract award. The conference will be held at __TBD_________.
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The contracting Officer will designate a Contracting Officer's Representative(COR) at the time of award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the contracting officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal for a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
EQUIPMENT CLEANING
All soil moving equipment shall be thoroughly cleaned to make it free of soil, noxious weed seeds, vegetative matter or other debris that could contain or hold seeds prior to being delivered to the project site. Equipment shall be considered free of soil, noxious weed seeds and other such debris when a visual inspection by the C.O.R., prior to the equipment being delivered to the site, does not disclose such material present. Disassembly of equipment components is not required. The Contractor shall notify the Forest Service at least five (5) working days prior to moving each piece of soil moving equipment onto the project site, unless otherwise agreed.
The Contractor shall thoroughly clean all soil moving equipment prior to moving them off a project site or between work areas on a project site that are known to be infested with noxious weed species of concern and other work areas, if any, that are free of noxious weed species of concern. Areas known to be infested with specific noxious weed species of concern to the Forest Service shall be noted in the Schedule of Work. The Contractor and the Forest Service shall agree on the methods of cleaning, location for the cleaning and control of off-site impacts, if any.
When new areas of infestation of noxious weeds of concern to the Forest Service are identified on the project site by either the Forest Service or Contractor they shall be promptly reported to the other party.
INVOICING
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted online via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Your company must register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account in order to submit an invoice on this project.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (OCT 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (SEP 2013)
52.204-7 System for Award Management (JUL 2013)
52.204-13 System for Award Management Maintenance (JUL 2013) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.214-26 Audit and Records – Sealed Bidding (OCT 2010) 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data – Modifications – Sealed Bidding (AUG 2011) 52.214-28 Subcontractor Certified Cost or Pricing Data – Modifications – Sealed Bidding (OCT 2010) 52.219-3 Notice of Total HUBZone Set-Aside or Sole Source Award (NOV 2011) 52.219-8 Utilization of Small Business Concerns (JUL 2013) 52.219-14 Limitations on Subcontracting (NOV 2011)
52.219-28 Post Award Small Business Program Rerepresentation (JUL 2013)
52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)
52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUN 2010)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-20 Walsh-Healy Public Contracts Act (OCT 2010)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-30 Davis-Bacon Act – Price Adjustment (None or Separately Specified Method) (DEC 2001)
52.222-35 Equal Opportunity for Veterans (SEP 2010) 52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) 52.222-40 Notification of Employee Rights Under Labor Relations Act (DEC 2010)
52.222-50 Combating Trafficking in Persons (FEB 2009)
52.222-54 Employment Eligibility Verification (AUG 2013)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001)
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (MAY 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2011)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4 Patent Indemnity -- Construction Contracts (APR 1984)
52.228-2 Additional Bond Security (OCT 1997)
52.228-5 Insurance – Work on a Government Installation (JAN 1997)
52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)
52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.229-3 Federal, State, and Local Taxes (FEB 2013)
52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)
52.232-17 Interest (OCT 2010)
52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (JUL 2013)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
52.233-1 Disputes (JULY 2002) Alt 1 (DEC 1991) 52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-16 Quantity Surveys (APR 1984) Alt 1 (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JUL 1995)
52.243-4 Changes (AUG 1987)
52.244-2 Subcontracts (OCT 2010)
52.244-6 Subcontracts for Commercial Items (DEC 2013)
52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2010)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $30,000) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database via https://www.acquisition.gov .
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consist of two segments—
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by—
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor’s record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
52.216-18 Ordering (Oct 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from June 1, 2014 through December 31, 2016.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
52.216-19 Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500 the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of $500,000;
(2) Any order for a combination of items in excess of $600,000 or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 Indefinite Quantity (Oct 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after December 31, 2016.
52.217-9 Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 day prior to expiration provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 3 years.
52.222-37 Employment Reports Veterans (SEP 2010)
(a) Definitions. As used in this clause, “Armed Forces service medal veteran,” “disabled veteran,” “other protected veteran,” and “recently separated veteran,” have the meanings given in the Equal Opportunity for Veterans clause 52.222-35.
(b) Unless the Contractor is a State or local government agency, the Contractor shall report at least annually, as required by the Secretary of Labor, on--
(1) The total number of employees in the contractor's workforce, by job category and hiring location, who are disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans.
(2) The total number of new employees hired during the period covered by the report, and of the total, the number of disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans; and
(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report.
(c) The Contractor shall report the above items by completing the Form VETS-100A, entitled “Federal Contractor Veterans’ Employment Report (VETS-100A Report).”
(d) The Contractor shall submit VETS-100A Reports no later than September 30 of each year.
(e) The employment activity report required by paragraphs (b)(2) and (b)(3) of this clause shall reflect total new hires, and maximum and minimum number of employees, during the most recent 12-month period preceding the ending date selected for the report. Contractors may select an ending date--
(1) As of the end of any pay period between July 1 and August 31 of the year the report is due; or
(2) As of December 31, if the Contractor has prior written approval from the Equal Employment Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).
(f) The number of veterans reported must be based on data known to the contractor when completing the VETS-100A. The contractor's knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve an employer of liability for discrimination under 38 U.S.C. 4212.
(g) The Contractor shall insert the terms of this clause in subcontracts of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)
(a) Definitions. As used in this clause—
“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to _mconn@fs.fed.us
FAR 52.225-9
Buy American Act-Construction Materials (SEP 2010)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
____NONE____________________________________________
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this…
This is the start of the file's text. The full file is on GovTribe.