QuestionsAndAnswers.docx

DOCX document 15 KB Posted

Attached to
Common Stand Exam and Stocking Survey IDIQ on the Allegheny NF
Solicitation number
AG-24H8-S-13-0029
Issued by

About this file

Responses to Questions. This is not an amendment to the solicitation and does not have to be acknowledged. Due date for offers remains unchanged.

View the file

Other files

File Type Posted
Exhibit_01_MarienvilleVicinityMaps.pdf PDF
OfferSubmissionPackage.doc DOC document
Exhibit_03_Inventory_Stands.pdf PDF
SolicitationPackage.doc DOC document
Exhibit_06_FieldGuideStockingCSE.doc DOC document
Exhibit_05_CSE_Field_Guide22.doc DOC document
Exhibit_04_WageDetermination.pdf PDF
Exhibit_02_BradfordVicinityMaps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Common Stand Exams and Stocking Surveys under Solicitation AG-24H-S-13-0029

Will the Government provide shape files for stands to be inventoried for both common stand exams and stocking surveys?

Yes, the government will provide shape files for stands to be inventoried.

Should plot coordinates, other than those moved on the fly by the forester due to open or property boundaries, be recorded as the intended predetermined location used for navigating to plot center OR should the cruiser record the actual coordinates upon reaching plot center?

The actual plot coordinates should be used in every case. Pre-determined plot coordinates are acceptable to use as long as the plot location is the actual location of where the plot falls. Plot locations should be spaced evenly throughout the stands.

Is compliance with the accuracy standard of 12m/39ft (pg 14 of the ANF Field Procedure Handbook)for plot location determined by distance from cruiser’s actual plot location to the intended pre-determined plot location OR from cruiser’s actual plot location to auditor’s actual plot location?

Compliance would be from the pre-determined plot location coordinates, where the plot centers were originally supposed to land, unless a plot was moved for good reasons. In other words, whatever coordinates are used as the plot location, the inspector expects the plot to be at that location and the difference between the two is the accuracy standard.

For daily production estimates needed to provide a per plot quote, can you please provide a typical cruise intensity (acres per plot or grid spacing) for the common stand exams?

CSE - 1-14 acres = 1plot/2 acres 14-20 acres = 10 plots 20+ acres = 1 additional plot/10 acres over 20 Stocking - 1-9 acres = 2plots/acre 10-19 acres = 20 plots 20+ acres = 1 additional plot/4 acres over 20