PreBidNotes.pdf
PDF 925 KB Posted
- Solicitation number
- AG-24H8-S-12-0003
About this file
Pre-bid attendees and work clarification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ContractPackage.pdf | ||
| SubmissionPackage.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Camp Dodge Road Bridge Repair
10 November 2011 pre-bid meeting
CLARIFICATION:
Bridge abutment wing-walls: Use or placement of concrete wing walls is required at the upstream wing-walls only, both sides. The downstream wing-walls only require Class 6 riprap placement.
| CampDodgePreBidAttendees |
| PreBidClarification |
File details come from the government source that posted it. Updated .