Text version

Wage Determinations – Road Resurfacing IDIQ on Green Mountain NF

General Decision Number: VT080002 02/08/2008 VT2

Superseded General Decision Number: VT20070002

State: Vermont

Construction Type: Highway

County: Addison County in Vermont.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest areas; railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction;

other major bridges)

Modification Number Publication Date

0 02/08/2008

SUVT2005-012 09/01/2005

Rates Fringes

Carpenter (includes form work)......................$ 12.84 .80

Ironworker, reinforcing......$ 13.53 .41

Ironworker, structural.......$ 21.15 15.54

Laborers:

Blaster, demolition.........$ 20.38 2.60

Concrete worker.............$ 12.46

Driller.....................$ 14.50 2.60

Flagger.....................$ 9.86 2.77

Guard rail installer........$ 10.36

Highway line striping.......$ 14.62 3.65

Landscape laborer...........$ 10.19 1.03

Sign installer..............$ 11.70 4.26

Unskilled...................$ 11.50

Power equipment operators:

Auger.......................$ 14.90

Backhoe.....................$ 15.03 1.33

Broom.......................$ 14.50 3.72

Bulldozer...................$ 18.76 2.29

Cold planer.................$ 15.56

Crane.......................$ 17.58 2.63

Excavator...................$ 15.97 1.36

Grader......................$ 16.44 3.50

Loader......................$ 14.62 1.87

Mechanic....................$ 14.00

Paver.......................$ 17.27 4.32

Pounder.....................$ 15.26

Roller......................$ 16.62 4.71

Screed......................$ 14.85 4.09

Traffic signal installer.....$ 10.94 3.20

Truck drivers:

2-axle......................$ 13.00 4.45

3-axle......................$ 13.27 4.61

4-axle......................$ 13.62 4.74

Dump........................$ 12.53 1.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: VT080037 02/08/2008 VT37

Superseded General Decision Number: VT20070038

State: Vermont

Construction Type: Highway

County: Windsor County in Vermont.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels; building structures in rest areas; railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction;

and other major bridges)

Modification Number Publication Date

0 02/08/2008

* SUVT2005-021 09/01/2005

Rates Fringes

Carpenter (includes form work)........................$ 13.21

Ironworker, reinforcing......$ 13.29 .52

Ironworker, structural.......$ 21.15 15.54

Laborers:

Blaster, demolition.........$ 20.38 2.60

Concrete worker.............$ 12.46

Driller.....................$ 14.50 2.60

Flagger.....................$ 11.15 4.40

Guardrail installer.........$ 9.88

Highway line striping.......$ 14.38

Landscape laborer...........$ 10.19 1.03

Sign installer..............$ 11.70 4.26

Unskilled...................$ 12.01

Power equipment operators:

Auger.......................$ 15.16

Backhoe.....................$ 15.54

Broom.......................$ 14.50 3.72

Bulldozer...................$ 16.22 3.35

Cold planer.................$ 16.20

Crane.......................$ 17.58 2.63

Excavator...................$ 15.97 1.36

Grader......................$ 16.44 3.50

Loader......................$ 15.13

Mechanic....................$ 14.00 6.05

Paver.......................$ 15.16

Pounder.....................$ 15.16

Roller......................$ 15.92 6.05

Screed......................$ 14.85 4.09

Traffic signal installer.....$ 10.94 3.20

Truck drivers:

2-axle......................$ 13.00 4.47

3-axle......................$ 13.27 4.61

4-axle......................$ 13.62 4.74

Dump........................$ 12.53 1.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal interested party (those affected by the action) can request interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

END OF GENERAL DECISION

General Decision Number: VT080032 02/08/2008 VT32

Superseded General Decision Number: VT20070032

State: Vermont

Construction Type: Highway

Counties: Lamoille and Windham Counties in Vermont.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels; building structures in rest areas; railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction;

and other major bridges)

Modification Number Publication Date

0 02/08/2008

* SUVT2005-016 09/01/2005

Rates Fringes

Carpenter (includes form work)........................$ 14.36 1.47

Ironworker, reinforcing......$ 14.93 4.92

Ironworker, structural.......$ 21.15 15.54

Laborers:

Blaster, demolition.........$ 20.38 2.60

Concrete worker.............$ 12.46

Driller.....................$ 14.50 2.60

Flagger.....................$ 9.86 2.77

Guardrail installer.........$ 10.36

Highway line striping.......$ 14.62 3.65

Landscape laborer...........$ 10.19 1.03

Sign installer..............$ 11.70 4.26

Unskilled...................$ 12.10

Power equipment operators:

Auger.......................$ 14.90

Backhoe.....................$ 15.03 1.33

Broom.......................$ 14.50 3.72

Bulldozer...................$ 18.76 2.29

Cold planer.................$ 15.56

Crane.......................$ 17.58 2.63

Excavator...................$ 15.97 1.36

Grader......................$ 16.44 3.50

Loader......................$ 14.62 1.87

Mechanic....................$ 14.00

Paver.......................$ 17.27 4.32

Pounder.....................$ 15.26

Roller......................$ 16.62 4.71

Screed......................$ 14.85 4.09

Traffic signal installer.....$ 10.94 3.20

Truck drivers:

2-axle......................$ 13.00 4.45

3-axle......................$ 13.27 4.61

4-axle......................$ 13.62 4.74

Dump........................$ 12.53 1.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal interested party (those affected by the action) can request interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

END OF GENERAL DECISION

General Decision Number: VT080035 02/08/2008 VT35

Superseded General Decision Number: VT20070035

State: Vermont

Construction Type: Highway

County: Rutland County in Vermont.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels; building structures in rest areas; railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction;

and other major bridges)

Modification Number Publication Date

0 02/08/2008

* SUVT2005-019 09/01/2005

Rates Fringes

Carpenter (includes form work)........................$ 14.36 1.47

Ironworker, reinforcing......$ 14.93 4.92

Ironworker, structural.......$ 21.15 15.54

Laborers:

Blaster, demolition.........$ 20.38 2.60

Concrete worker.............$ 12.46

Driller.....................$ 14.50 2.60

Flagger.....................$ 9.57 2.99

Guardrail installer.........$ 10.36

Highway line striping.......$ 14.62 3.65

Landscape laborer...........$ 10.19 1.03

Sign installer..............$ 11.70 4.26

Unskilled...................$ 11.17 2.70

Power equipment operators:

Auger.......................$ 14.90

Backhoe.....................$ 15.03 1.33

Broom.......................$ 14.50 3.72

Bulldozer...................$ 18.76 2.29

Cold planer.................$ 15.56

Crane.......................$ 17.58 2.63

Excavator...................$ 15.97 1.36

Grader......................$ 16.44 3.50

Loader......................$ 14.62 1.87

Mechanic....................$ 14.00

Paver.......................$ 14.00 3.94

Pounder.....................$ 15.26

Roller......................$ 14.34 4.08

Screed......................$ 15.97 4.44

Traffic signal installer.....$ 10.94 3.20

Truck drivers:

2-axle......................$ 13.00 4.47

3-axle......................$ 13.27 4.61

4-axle......................$ 13.62 4.74

Dump........................$ 12.53 1.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal interested party (those affected by the action) can request interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

END OF GENERAL DECISION