Attachment_4_FINAL_12_28_2016.pdf

PDF 2 MB Posted

Attached to
Sheffield Brook EWP-FPE Stream Restoration on Old Lyme, Connecticut
Solicitation number
AG-1A23-S-17-0003
Issued by

About this file

Attachment 4 Construction Plan/Drawings (Pages A4-1 to A4-17)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-1A23-S-17-0003 SHEFFIELD BROOK FLOODPLAIN RESTORATION County of New London, Connecticut, DATE: December 28, 2016

Attachment 4 (Construction Plan/Drawings) Page A4-1

Attachment 4 (Construction Plan/Drawings) Page A4-2

Attachment 4 (Construction Plan/Drawings) Page A4-3

Attachment 4 (Construction Plan/Drawings) Page A4-4

Attachment 4 (Construction Plan/Drawings) Page A4-5

Attachment 4 (Construction Plan/Drawings) Page A4-6

Attachment 4 (Construction Plan/Drawings) Page A4-7

Attachment 4 (Construction Plan/Drawings) Page A4-8

Attachment 4 (Construction Plan/Drawings) Page A4-9

Attachment 4 (Construction Plan/Drawings) Page A4-10

Attachment 4 (Construction Plan/Drawings) Page A4-11

Attachment 4 (Construction Plan/Drawings) Page A4-12

Attachment 4 (Construction Plan/Drawings) Page A4-13

Attachment 4 (Construction Plan/Drawings) Page A4-14

Attachment 4 (Construction Plan/Drawings) Page A4-15

Attachment 4 (Construction Plan/Drawings) Page A4-16

Attachment 4 (Construction Plan/Drawings) Page A4-17

File details come from the government source that posted it. Updated .