Attch_1_GMNF_2016_FR35.04.9_Over_Unnamed_Trib_Schedule_of_Items.docx
DOCX document 22 KB Posted
- Attached to
- gmnf fr35. 04. 9 AOP Culvert Replacement
- Solicitation number
- AG-1681-S-16-0011
About this file
Attch 1 GMNF 2016 FR35.04.9 Over Unnamed Trib_Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch_3_GMNF_2016_FR35.04.9_Over_Unnamed_Trib_Contract_Plans.pdf | ||
| Attch_4_DBWD_VT160041_010816_VT41_Highway_Rutland_Co.docx | DOCX document | |
| Attch_2_GMNF_2016_FR35.04.9_Over_Unnamed_Trib_Supplemental_Specs.docx | DOCX document | |
| Attch_5_GovtProvidedTechnicalProposalForms.docx | DOCX document | |
| AG-1681-S-16-0011_Complete.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
FR35.04.9 AOP Culvert Replacement
Green Mountain National Forest Rochester Ranger District Rutland County
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 15101 |
| Mobilization |
| Lump Sum |
| 1 |
| 15201 |
| Construction survey and staking, method I, tolerance A |
| Lump Sum |
| 1 |
| 15702 |
| Soil Erosion Control, Silt fence |
| Linear Foot |
| 300 |
| 15713 |
| Soil erosion & pollution control |
| Lump Sum |
| 1 |
| 20102 |
| Clearing and grubbing |
| Lump Sum |
| 1 |
| 20305 |
| Removal of structures and obstructions |
| Each |
| 1 |
| 20401 |
| Roadway excavation |
| Cubic Yard |
| 310 |
| 20801 |
| Structure excavation |
| Cubic Yard |
| 800 |
| 20809 |
| Cofferdams |
| Each |
| 2 |
| 25101 |
| Placed riprap, class 1 |
| Cubic Yard |
| 50 |
| 25101 |
| Placed riprap, class 6 |
| Cubic Yard |
| 235 |
| 25116 |
| Geotextile, type IV, class C |
| Square Yard |
| 650 |
| 25503 |
| Select granular backfill |
| Cubic Yard |
| 525 |
| 30111 |
| Aggregate surface course, grading C, compaction method D |
| Cubic Yard |
| 75 |
| 55201 |
| Structural Concrete, Class A |
| Cubic Yard |
| 45 |
| 55401 |
| Reinforcing Steel |
| LB |
| 3100 |
| 60305 |
| 24’-0” Span, 5’-9”, Structural Plate Box |
| Lump Sum |
| 1 |
| 62503 |
| Seeding, dry method (including fertilizer) |
| Lump Sum |
| 1 |
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 62703 |
| Grubbing Material, 12” thick |
| Square Yard |
| 140 |
| 62901 |
| Erosion control mat type 2.D |
| Square Yard |
| 350 |
| 63301 |
| Sign system (Including Posts) |
| Each |
| 4 |
| 64804 |
| Placed streambed simulation rock, bed class 36, placement method A |
| Cubic Yard |
| 110 |
| 64856 |
| Rock weir, man rock 4, placement method A |
| Lump Sum |
| 2 |
| 64869 |
| Placed streambed channel rock, man rock 3, placement method A |
| Cubic Yard |
| 35 |
Total:
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
File details come from the government source that posted it. Updated .