General Construction Green Mountain National Forest IDIQ Contract 2016

SECTION C--DESCRIPTION/SPECIFICATIONS

C.1 Scope of Contract Green Mountain National Forest’s (GMNF) General Construction IDIQ Contract located within the GMNF. By design, an Indefinite Delivery, Indefinite Quantity (IDIQ) contract allows the Government to respond to various emergencies and light construction needs rapidly, without committing to a specific quantity or type of work. When a project is initiated, a Task Order will be offered to the awarded Contractor(s) that outlines the project needs, equipment needs, dates, and specific project location. The resulting Task Orders will be competed among the awardees and evaluated based on a best value to the Government determination. Section C.2 Description of Work below outlines, in a general sense, the various types of work that may be offered as a Task Order under this IDIQ Contract.

C.2 Description of Work The project includes, but is not limited to, the following work: road construction and re-construction, emergency road construction due to major emergencies such as landslides, flooding, fire, etc; road and/or parking area construction, reconstruction, reconditioning, maintenance, decommissioning; trail construction, reconstruction, reconditioning, maintenance, and decommissioning; culvert installation and repair; road/stream interaction projects; aquatic organism passage projects, erosion control, sign installation and repair;

gate fabrication, installation and repair including minor concrete forming and finishing;

recreational site construction, reconstruction, reconditioning, and maintenance; material haul; haul and placement of imported borrow or aggregate; extraction and processing of borrow or aggregate from Forest Service owned gravel pits; small building repairs (roofing, siding, rot repair, etc.) and demolition, and other related road work as described in the Statement of Work under each individual Task Order issued under this contract. Contractor shall provide all necessary heavy equipment, manpower, transportation and operating supplies and other incidentals to accomplish this work.

C.3 Location of Project The project area is described herein and shown on the attached maps (See Section J, List of Attachments). The work is located within the GMNF.

C.4 Performance of the Work All work shall be conducted in a safe and expedient manner and in conformance with the specifications referenced in Section J and the Task Order. When applicable, traffic control shall be in accordance with standards set forth in the most current edition of the Manual on Uniform Traffic Control Devices (MUTCD). See General Notes in Section B for discussion of compensation for traffic control work. All work shall be conducted by personnel fully qualified to perform such tasks assigned and shall be supervised by an onsite designated Contractor’s Representative.

C.5 Equipment All equipment shall be in good repair, and capable of accomplishing assigned tasks in a safe and environmentally acceptable manner. All repairs to equipment under this contract shall be made and paid for by the Contractor.

The equipment listed in the Schedule of Items constitutes the minimum mandatory equipment to be furnished and operated under this contract. Failure to furnish rates for this equipment will render the offer non-responsive. Larger equipment maybe used except in such cases that oversized equipment would result in unacceptable ground disturbance or be counterproductive.

Equipment substitutions must be requested in writing and must be approved by the Contracting Officer prior to use.

Equipment may be owned, rented, or subcontracted.

All equipment shall be cleaned of earthen and vegetative materials that may contain weed seed prior to delivery onto National Forest Lands. If using equipment on multiple Task Orders at one time or if there are long mobilization distances between sites on the same Task Order, the Contracting Officer may require cleaning of equipment between the project sites. See General Notes in Section B.

C.6 Equipment and Materials Storage & Staging Upon concurrence from the Contracting Officer, certain areas on the National Forests may be used on a case-by-case basis for storage of equipment and/or materials during active construction and/or maintenance periods. The Contractor shall be responsible for protection of items stored on Government property, and shall ensure adequate safety measures are maintained at such sites.

C.7 References in the Statement of Work/Specifications Any reference in this solicitation to Engineer, Forest Engineer, Project Engineer, Forest Service, COR, shall be replaced with Contracting Officer.

C.8 Standard Specifications The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S.

Customary Units and its revisions are included by reference only. Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Solicitation for Bid and any resulting contract.

A copy of the U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S.

Customary Units can be obtained at the following locations:

Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001

They can also be downloaded directly at the following website:

http://flh.fhwa.dot.gov/resources/pse/specs/

The following Forest Service Supplemental Specifications are revisions to the Standard Specifications that incorporate specification changes or additions that are specific requirements and unique to this particular project. The specifications are herein modified as follows.

C.9 Government Furnished Property The Government will provide Government furnished property required by each task order to the Contractor for use in the performance of the task order. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

Unless otherwise agreed upon, any Government-Furnished Property incorporated into the work shall be delivered to the project site by the Contractor and the cost will be included with the task order.

Government will provide official National Forest Maps and specific vicinity maps for each task order issued.

TASK ORDERS: The CO, or designated Contracting Officer Representative (COR) shall submit an executed task order to the Contractor. All work will be ordered by Firm-Fixed price TASK ORDERS (TO) at the prices listed on the Schedule of Items through the Base Period and each Option Year exercised. The price may change only by a written modification to the task order signed by the Contracting Officer and the Contractor. The Contractor shall schedule work to minimize impact on road use when possible. Task orders will not exceed $34,999.00 in value.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. This includes Standard Specifications and Supplemental specifications applicable to this project.

Supplemental Specification

Table of Contents

SECTION C--DESCRIPTION/SPECIFICATIONS

Supplemental Specification

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

155 Delete

203 - Removal of Structures and Obstructions

203.01 Description

203.04 Removing Material

208 - Structure Excavation and Backfill for Selected Major Structures

208.03 General

251 - Riprap

251.03 General

301 - Untreated Aggregate Courses

301 Title Change

301.01 Work

301.02 Material

301.03 General

301.04 Mixing and Spreading

301.05 Compacting

301.06 Surface Tolerance

301.08(b) Plasticity Index

301.09 Measurement

Table 301-1—Acceptance Sampling and Testing Requirements

Table 301-1 Field Density Requirements

552 - Structural Concrete

602 - Culverts and Drains

602.03 General

602.06 Laying Plastic Pipe

617 - Guardrail

625 - Turf Establishment

625.03 General

625.04 Preparing Seedbed

625.05 Watering

625.07 Seeding. (a) Dry method

625.07 Seeding. (b) Hydraulic method

627 – Sod

648 – Stream Simulation

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

704 - Soil

704.02 Bedding Material

705 - Rock

705.02 Riprap Rock

705.07 Streambed Simulation Rock

705.08 Channel Rock

713 - Roadside Improvement Material

718.05 Temporary Rolled Erosion Control Products

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

725 - Miscellaneous Material

725.04 Pozzolans

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

203 - Removal of Structures and Obstructions

203.01_nat_us_02_25_2005

203.01 Description.

Delete and replace with the following:

This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.

203.04_nat_us_02_18_2005

203.04 Removing Material.

Replace the fourth and fifth paragraphs with the following:

Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete.

Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation.

Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.

203.08_nat_us_02_24_2005

203.08 Payment

Add the following:

Disposal of construction slash will be compensated under the designated pay item in Section 201.

208 - Structure Excavation and Backfill for Selected Major Structures

208.04_nat_us_08_05_2009

Construction Requirements

208.03 General.

Add the following to the end of the second sentence of the third paragraph:

"... to the CO a minimum of 5 days prior to beginning excavation work."

Add the following to the end of the third sentence of the third paragraph:

"...to the CO a minimum of 15 days prior to installation."

208.08 Foundation Preparation.

Add the following after the first paragraph:

The foundation elevation is defined as the bottom of footings, for spread footing placement; the bottom of the pile cap, for construction of pile foundations; and the toe of the wall, for construction of retaining walls, except wingwalls at bridges.

Replace all material from any over-excavation below the designated footing elevation with concrete, compacted gravel, or foundation fill at the direction of the CO.

When boulders or irregular, fractured, or seamed bedrock precludes excavation to the designated footing elevation without further loosening of previously solid material, the CO may order removal of such loose material and allow payment for concrete, gravel, or structural backfill that is required to restore foundation material to the designated elevation

208.12 Measurement.

Add the following to the second paragraph:

(g) Material excavated to construct end walls or wing walls which lie outside the excavation limits specified above.

Add the following paragraph:

Foundation over-excavation and the resulting replacement material will not be measured for payment unless the CO determines the over-excavation was unavoidable because of the nature of the material.

251 - Riprap

251.03_nat_us_08_05_2009

Construction Requirements

251.03 General.

Add the following:

Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.

251.08 Measurement.

Add the following:

Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.

301 - Untreated Aggregate Courses

301.00_nat_us_03_03_2005

301 Title Change.

Change the title to: Section 301 Aggregate Courses

301.01_nat_us_03_03_2005

301.01 Work.

Work includes producing aggregate by pit-run, grid rolling, screening, or crushing methods, or placing Government-furnished aggregate. Work may include additive mineral filler, or binder.

301.02_nat_us_05_16_2005

301.02 Material.

Add the following:

Bentonite 725.30

Calcium Chloride Flake 725.02

Lignon Sulfonate 725.20

Magnesium Chloride Brine or Calcium Chloride Liquid 725.02

301.03_nat_us_09_14_2005

301.03 General.

Add the following:

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.

301.04_nat_us_03_03_2005

301.04 Mixing and Spreading.

Delete the first sentence of the first paragraph and add the following:

Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend following crushing. Control additive proportions to 0.5 percent dry weight.

(a) Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer. Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

(b) Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant. During mixing, add water to provide the necessary moisture content for compacting.

(c) Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.

Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

Route and distribute hauling and leveling equipment over the width and length of each layer.

301.05_nat_us_05_17_2005

301.05 Compacting

Delete and replace with the following:

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operate spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Removed.

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Removed.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06_nat_us_03_03_2005

301.06 Surface Tolerance.

Add the following:

Thickness and Width requirements:

The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.

The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.

301.08_nat_us_03_03_2005

301.08(b) Plasticity Index.

Add the following to the first sentence:

“and under 703.05(c)(1)”.

301.09_nat_us_07_07_2005

301.09 Measurement.

Replace the second paragraph with the following:

Measure aggregate by cubic yard compacted in place when payment is by contract quantities.

301.10_nat_us_03_03_2005

301.10 Payment

Delete the following:

adjusted according to Subsection 106.05

Table 301-1: Add the following:

Table 301-1—Acceptance Sampling and Testing Requirements.

Material or Product

Type of Acceptance (Subsection)

Characteristic Category Test Methods Specifications

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Subbase & Base Courses L, M, N, O, P, Q, R

Measured and tested conformance (Subsection

106.04)

Plastic Limit - AASHTO T 90 1 per each 1,000 T

From the windrow or roadbed after processing

Yes 4 Hours

Table 301-1—Acceptance Sampling and Testing Requirements.

Material or Product

Type of Acceptance (Subsection)

Characteristic Category Test Methods Specifications

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Aggregate Width

Measured and tested conformance (Subsection

106.04)

Width - - 4 per each

0.5 mi

Roadbed after processing

- 4 Hours

Aggregate Thickness

Measured and tested conformance (Subsection

106.04)

Thickness - - 4 per each

0.5 mi

Roadbed after processing

- 4 Hours

Additive Measured and tested conformance (Subsection

106.04)

Amount of Additive

- 1 per each 1,000 T

From the windrow or roadbed after processing

No 4 Hours

301.08_nat_us_10_14_2011

Table 301-1 Field Density Requirements.

Table 301-1: Delete laboratory and field density requirements for base, subbase, and surfacing and replace with the following:

Material or Product

Type of Acceptance (Subsection)

Characteristi c

Category Test Methods Specification s

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Base and Subbase

Measured and tested conformance (Subsection 106.04)

Moisture Density

Method C --- AASHTO T

1 per type and source of material

Source of material

Yes Before using in work

Method D --- AASHTO T

Compaction ---

Method C, D --- AASHTO T 310 or other approved procedures

1 per 500 t In-place --- Before placing the next layer

Surfacing Measured and tested conformance (Subsection 106.04)

Moisture Density

--- “ “ “ Before using in work

Material or Product

Type of Acceptance (Subsection)

Characteristi c

Category Test Methods Specification s

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Method D --- AASHTO T

Compaction

Method C, D --- AASHTO T 310 or other approved procedures

1 per 500 t In-place --- Before placing the next layer

552 - Structural Concrete

552.02_nat_us_06_20_2007

Material

552.02 Add the following:

Anchor bolts 717.01 Dowels 717.17 Epoxy resin adhesives 725.21 High strength non-shrink grout 701.02 Mortar 701.02 Portland cement 701.01 Sealants, fillers, seal, and sleeves 712.01

Construction Requirements

552.03 Composition (Concrete Mix Design).

Delete Tables 552-1, 2, and 3 and replace with the following:

Table 552-1 Composition of Concrete

Class of Concrete

Minimum Cement Content

(pound per cubic yard)

Maximum W/C Ratio

Slump (1) (inches)

Maximum Nominal Coarse

Aggregate Size (5)

(inches) A 611 0.49 2 to 4 1½

A(AE) 611 0.44 1 to 4 1½ B 517 0.58 2 to 4 2½

B(AE) 517 0.58 2 to 4 2½ C 658 0.49 2 to 4 ¾

C(AE) 658 0.44 1 to 3 ¾ D(AE)(2) 611 0.40 1 to 3 1½ E(AE)(3) 611 0.40 4 to 6 (4) ¾

P (Prestressed)

658 0.44 0 to 4 1

P(AE) 658 0.44 0 to 4 1 Seal 658 0.54 4 to 8 1½

(1) Maximum slump is 8 inches if approved mix design includes a high-range water reducer.

(2) Concrete with a water reducing and retarding admixture conforming to AASHTO M 194, type D.

(3) A latex modified concrete with 0.037 gallons of modifier per pound of cement.

(4) Measure the slump 4 to 5 minutes after the concrete is discharged from the mixer.

(5) Meeting the processing requirements of AASHTO M43, Table 1 – Standard Sizes of Processed Aggregate.

(6) Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders. In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and throughout the entire depth of prestressed slabs. In all cases, furnish concrete meeting the 28 day specified minimum concrete strength requirements for the prestressed members as shown on the plans, unless otherwise specified.

Table 552-2

Minimum Air Content for Air Entrained Concrete

Nominal Maximum Aggregate Size (1)

As Delivered Minimum Air

Content (2) (3) (%) 2½ inch 3.5 2 inch 3.5

1½ inch 4.0 1 inch 4.5 ¾ inch 4.5 ½ inch 5.5

(1) Meeting the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.

(2) These air contents apply to the total mix. When testing these concretes, aggregates larger than 1½ inches are removed by handpicking or sieving, and air content is determined on the minus 1½-inch fraction of the mix. Air content of the total mix is computed from the value determined on the minus 1½-inch fraction.

(3) For P(AE) concrete, the as delivered minimum air contents may be reduced 1.0 % and the maximum air content is 6.0 %

Table 552-3 Required Average Compressive Strength (1)

Specified Compressive Strength (f’c)

(psi)

Required Average Compressive Strength

(f’cr) (psi)

Less than 3000 f’c + 1000 3000 to 5000 f’c + 1200

Over 5000 1.10f’c + 700

(1) Use this table when there is not enough data available to establish a standard deviation

Delete the first paragraph after Table 552-2 and replace with the following:

Submit written concrete mix designs for approval at least 30 calendar days before production.

Add the following under the list of items to be included in the mix design submittal:

(y) Evaluation of potential aggregate reactivity

552.08 Delivery.

(a) Truck mixer/agitator.

Add the following:

Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing. Do not exceed 300 total revolutions, including both mixing and agitating speed.

552.09 Quality Control of Mix.

Add the following after the first paragraph:

At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors.

Be prepared to discuss and/or submit the following:

(1) Proposed concrete placement schedule.

(2) Review approved concrete mix design and determination of batch weights.

(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).

(4) Discuss batching, mixing, placing, and curing requirements.

(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.

552.11 Handling and Placing Concrete.

Add the following after the forth paragraph:

Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.

552.12 Construction Joints.

Add the following at the end of the first paragraph:

Provide form cleanout ports at construction joints.

552.18 Loads on New Concrete Structures.

Add the following paragraph:

Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.

602 - Culverts and Drains

602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

602.06_nat_us_08_05_2009

602.06 Laying Plastic Pipe.

Delete the second paragraph and substitute the following:

Provide soil-tight bell and spigot joints for plastic pipe culverts.

617 - Guardrail

617.02_nat_us_07_03_2007

Material 617.02

Galvanized coating repair 717.07

Construction Requirements

617.03 Posts.

Replace the first paragraph with the following:

Fabricate all timber components of guardrail as detailed in Subsection 557.04. Pressure treat all timber as detailed in Subsection 716.03, using creosote, pentachlorophenol (any solvent), ammoniacal copper zinc arsenate (ACZA), or chromated copper arsenate (CCA – Type A, B, or C) in conformance with AASHTO M 133. Provide grading certification and pressure treatment test results, and meet the Best Management Practices (BMP’s) requirements of Subsection

716.03. Field treat cuts or abrasions made in fabricated timber after treatment in accordance with Subsection 557.04.

617.04 Rail Elements.

(a) Steel rail.

Replace the third paragraph with the following:

Repair all scrapes, cuts and other damaged coating areas on galvanized surfaces that are through to the base metal with galvanized coating repair.

617.05 Terminal Sections.

Add the following to the end of the second sentence:

"... unless otherwise shown on the plans."

625 - Turf Establishment

625.03_nat_us_02_25_2005

625.03 General.

Delete the first subsection and add the following:

Apply turf establishment to finished slopes and ditches. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise untillable.

625.04_nat_us_02_25_2005

625.04 Preparing Seedbed.

Delete “2 inches in diameter and larger,” from the second sentence.

625.05_nat_us_03_30_2005

625.05 Watering.

Delete the entire subsection

625.07_nat_us_02_25_2005

625.07 Seeding. (a) Dry method.

Remove the last sentence “Lightly compact the seedbed within 24 hours after seeding.”

625.07 Seeding. (b) Hydraulic method.

Add the following:

Apply fertilizer conforming to Subsection 713.03 at the rates shown in Table 625-1. Fertilize areas inaccessible to hydro-type equipment by hand.

627 – Sod

Section 627 shall remain in its entierty except as modified below:

627.02 Conform to the following Subsections:

Agricultural limestone 713.02 Fertilizer 713.03 Grubbing Material 713.09 Pegs for sod 713.11 Sod 713.10 Water 725.01

627.06 – This section is modified as follows:

Add the following after section (c) Spot sod.

(d) Grubbing Material. Approved grubbing material shall be placed as shown on the Plans or as directed by the Engineer. Spreading shall not be done when grubbing material is frozen, excessively wet, or otherwise in a condition detrimental to the work. The grubbing material shall be spread evenly to a depth of approximately 300 mm (12 inches) or to the depth shown on the Plans or directed by the Engineer. All large stones and other unsuitable material shall be removed from the area, as directed by the Engineer. Grubbing material stockpile areas shall be graded, seeded, and left in a neat and presentable.

Stone and rock fill slopes to be covered with grubbing material shall be shaped in reasonably close conformity with the grades and typical cross-sections shown on the Plans or directed by the Engineer.

648 - Stream Simulation

648.00_nat_us_04_17_2008

648 – Streambed Simulation

Description

648.01 This work consists of placing rock and fill to simulate a natural streambed, profile and cross section though road stream crossings. The placement of Channel Rock for: fish rest stop, rock bands, rock weirs, stream bank rocks, and other in stream rock structures, is included within this specification.

Material

648.02 Conform to the following Subsections.

Foundation Fill 704.01

Stream Bed Simulation Material 705.08

Channel Rock 705.09

Construction Requirements

648.03 General. Place streambed simulation material on a prepared surface to form a well-graded, low permeability mass, similar in appearance and texture to the natural streambed. Do not drive metal track or rubber tired equipment directly on metal or concrete structure surfaces.

648.04 Placed Streambed Simulation Material and Channel Rock.

(a) Method A, Machine Placed. Place stream simulation rock in one or more layers with a layer depth less than 1 ½ times the maximum dimension of the stream simulation rock. Place stream simulation by methods that do not cause segregation or damage to the prepared surface.

Place or rearrange individual rocks by mechanical methods to obtain a compact low permeability mass matching streambed simulation details. Fill voids before placing the next lift. Place fish rest stop, rock bands, rock weirs, stream bank rocks, and other in stream rock structures as designated.

(b) Method B, End Dumped. Dump stream simulation rock in one or more layers with a layer depth less than 1 ½ times the maximum dimension of the stream simulation rock. Distribute larger rocks throughout the mass of stone. Obtain a uniformly dense, compact, low permeability bed with a surface matching stream simulation bed details. Fill voids before placing the next lift.

Place fish rest stop, rock bands, rock weirs, stream bank rocks, and other in stream rock structures as designated.

(c) Method C, Hand Placed. Place stream simulation rock using hand labor. Material may be hand carried, or carried in wheelbarrows and end dumped to obtain its full thickness. Compact each load using hand operated or hand operated mechanical equipment to obtain a uniformly dense, compact, low permeability bed with a surface matching stream simulation bed details.

Fill voids before placing the next lift. Place fish rest stop, rock bands, rock weirs, stream bank rocks, and other in stream rock structures as designated.

648.04 Foundation fill. Fill all voids left during placement of Channel Rocks and Streambed Simulation adjacent to footings, concrete structures or corrugated pipes with foundation fill. Use water pressure, metal tamping rods, and similar hand operated equipment to force material into all surface and subsurface voids between the structure and rocks and between individual rocks.

648.05 Acceptance. Placing streambed simulation material will be evaluated under Subsections

106.02 and 106.04.

Measurement

648.06 Measure the items listed in the bid schedule according to Subsection 109.02.

Payment

648.07 The accepted quantities, measured as provided in Subsection 109.02, will be paid at the contract unit price per unit of measurement for Section 648 pay items listed in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05

703 - Aggregate

703.05_nat_us_08_14_2009

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradation Table 703-16

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

T ab le

-2 ar ge t

V al u e

R an ge s fo r

S u b b as e an d

B as e G ra d at io n P er ce n t by M as s

P as si n g D es ig n at ed S ie ve

A

A S

H T

O T an d

T

1)

G ra d in g D es ig n at io n

E

B as e)

(6

(6

(4

4.

7.

(3

T he v al ue in th e pa re nt he se s is th e al lo w ab le d ev ia ti on f ro m th e ta rg et v al ue s.

D

B

6)

(6

(6

(4

4.

7.

(3

C

B

6)

(6

(6

4.

–7 .0

3)

B

S u b b

(8

.0

4)

A

S u b b

(7

(6

8.

(3

S ie ve S iz e

2½ in ch

1½

3/

1/

N o.

N o.

Delete Table 703-3 and replace with the following:

ab le

-3 ar ge t V al u e R an ge s fo r S u rf ac e

G ra d at io n

P er ce n t by

M as s P as si n g

D es ig n at ed

S ie ve

A A

S H

T O

T an d T

1) ra d in g

D es ig n at io n U

(6

(7

(5

8.

.0

T he v al ue in th e pa re nt he se s is th e al lo w ab le d ev ia ti on f ro m th e ta rg et v al ue s.

If th e pl as ti ci ty in de x

(P I) is gr ea te r th an th e

T V ra ng e fo r th e N o si ev e si ze is 8-

(4

)T

(7

(5

8.

.0

S

(6

(7

(5

8.

.0

H

(6

(6

(5

9.

.0

(6

(6

(5

.0

6.

(4

F

-1

-8

-6

(6

-5

-3

(6

-2

(5

.0

-1 6.

(4

S ie ve S iz e

1/

1/

N o.

N o.

Add Table 703-16:

Table 703-16

Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

705 - Soil

704.02 Bedding Material.

Delete Subsection 704.02 and substitute the following:

Furnish a well graded, free draining material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:

(a) Maximum particle size 1/2 inch or half the corrugation depth, whichever is smaller

(b) Material passing No. 200 sieve, 10% max.

AASHTO T 27 and T 11

705 - Rock

705.02_nat_us_08_05_2009

705.02 Riprap Rock.

Delete Table 705-1 and replace it with the following:

Gradation Requirements for Riprap Class Percent of

Rock by Mass Mass

(pounds) Approximate Cubic

Dimension b,c (inches)

20 22 to 33 6 to 8 30 11 to 22 5 to 6 40 1 to 11 2 to 5 10a 0 to 1 0 to 2

20 55 to 110 8 to 10 30 22 to 55 6 to 8 40 2 to 22 3 to 6 10a 0 to 2 0 to 3

20 220 to 330 14 to 16 30 110 to 220 10 to 14 40 11 to 110 5 to10 10a 0 to 11 0 to 5

20 550 to 770 18 to 20 30 220 to 570 14 to 18 40 22 to 220 6 to 14 10a 0 to 22 0 to 6

4a

20 770 to1353 20 to 24 30 330 to 770 16 to 20 40 33 to 330 7 to16 10a 0 to 33 0 to 7

20 1540 to 2200 26 to 28 30 1100 to 1540 20 to 26 40 55 to 1100 8 to 20 10a 0 to 55 0 to 8

20 1870 to 3520 28 to 34 30 1100 to 1870 22 to 28 40 110 to 1100 10 to 22 10a 0 to 110 0 to 10

20 4400 to 5940 35 to 39 30 2200 to 4400 28 to 35 40 220 to 2200 14 to 28 10a 0 to 220 0 to 14

20 7000 to 10000 42 to 47 30 4000 to 7000 35 to 42 40 400 to 4000 16 to 35 10a 0 to 400 0 to 16

(a) Furnish spall and rock fragments graded to provide a stable dense mass.

(b) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.

(c) Furnish rock with breadth and thickness at least one-third its length.

(d) 705.07_nat_us_04_17_2008

(e) Add the following:

(f) 705.08 Streambed Simulation Rock.

(g) (a) General. Furnish a mixture of soil, gravel, cobble, and boulders to simulate a natural streambed. The cobbles and boulders should be hard, durable rock that conforms to test values in 705.02.

(h) Table 705-5 – Gradation requirements for Streambed Simulation Material, inches or sieve size

Bed Class 100% passing 84% passing 50% passing 16% passing 10% passing

2 5 2 3/4 1/4 No. 10

4 10 4 1 3/4 1/2 No. 10

6 14 6 2 1/2 3/4 No. 10

8 22 8 3 1 No. 10

10 24 10 4 1 No. 10

12 30 12 5 1 1/2 No. 10

14 36 14 6 1 3/4 No. 10

16 42 16 7 2 No. 10

20 48 20 8 3 No. 10

24 60 24 10 3 No. 10

36 72 36 14 4 No. 10

48 96 48 18 6 No. 10

(i) 705.08_nat_us_04_17_2008

(j) 705.09 Channel Rock.

(k) (a) General. Furnish hard, durable rock that consists of intact blocks without open fractures, foliation, or other planes of weakness. Conform to test values in 705.02.

(l) (b) Sized and shapes. Furnish rocks that are generally cubical, tabular, or rectangular in shape, with dimensions as designated, or as specified in the following table:

(m) Table 705-6 gradation requirement for Channel Rock

Rock Size

(Man Rock)

Mass (Pounds) Approximate Cubic Dimension (inches)

1 50-200 12-18

2 200-700 18-28

3 700-2000 28-36

4 2000-4000 36-48

5 4000-6000 48-54

6 6000-8000 54-60

(n) Color. Furnish rocks with a color indigenous to the area. Rocks should be free of machine-made scratches, mars, or other damage to the visible surface. If requested, submit a 12 in sample of rock that is representative of the rock color for approval by the

CO.

713. — Roadside Improvement Material

713.17 Temporary Rolled Erosion Control Products.

Delete paragraph 713.17(h) and replace it with the following:

(h) Type 2.D, short-term double-net erosion control blankets. Furnish an erosion control blanket composed of processed natural fibers mechanically bound between two natural fiber nettings to form a continuous matrix.

718 - Traffic Signing and Marking Material

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

725 - Miscellaneous Material

725.04_nat_us_08_05_2009

725.04 Pozzolans.

Delete paragraph (a) and replace with the following:

(a) Fly ash AASHTO M295, class C or F, except the loss on ignition must not exceed 3.0%.

725.21 Epoxy Resin Adhesives

Delete the first paragraph and replace with the following:

Furnish epoxy resin adhesives conforming to AASHTO M 235, which are moisture resistant and are the appropriate M 235 type (intended use), grade (viscosity), class (temperature range) and color for the intended use.

725.22 Grout.

(c) Nonshrink grout.

Add the following:

Where grout placement is confined and the grout cannot flow sideways, a mortar meeting the requirements of subsection 701.02 (b) may be used in lieu of a high-strength non-shrink grout.

Use only at manufacturer’s suggested temperature ranges.

Keep grout in the original manufacturer's labeled containers until used. Provide protection requirements as specified for cement in 701.01. Do not use grout after the expiration date shown on the container or 1 year from date of purchase, whichever date occurs first.

Store, mix, place and cure grout in accordance with the manufacturer's instructions; submit a copy to the CO in advance of use. Do not place grout when the air temperature is below 41° F or above 86° F.

General Notes:

1. The base of operations location shall be used for mobilization distance determination purposes. Base of Operations should be the location where the equipment is staged but may be any business office location. Some task orders may be based on shorter distances, if the affected equipment is closer to the project site than the base of operations (e.g., mobilization from one project site to another).

2. Mobilization shall be for one time per task order. Mobilization will not be paid for the return trip to the base of operations, or for re-mobilization to the same project (e.g., equipment taken back to the base of operations for the weekend, poor project planning), unless agreed to in advance by the Contracting Officer.

3. Mobilization covers movement of personnel, equipment, supplies, and incidentals to or from the project area. Requirements and provisions shall follow Section 151 in the FP-14 specifications. Payment will be made at the accepted rate shown on the bid schedule.

4…