Amendment 000002 Revised Plans and Bid Schedule
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-1681-S-15-0003
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
24H8
WARREN PA 16365
4 FARM COLONY DRIVE
ALLEGHENY NATIONAL FOREST
USDA FOREST SERVICE
03/20/2015000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/20/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IGF::OT::IGF
GMNF-FY2015 - AOP Culvert Replacement over Mad Tom Brook on FR58.01.10, to include (without being limited to) Layout and Construction of a Box Culvert, Construction of Stream Channel and Structures, Rebuilding Roadway, Approach Work.
LIST OF CHANGES:
Replace bid schedule with attached new bid schedule.
Replace Plans listed in Section J Attachment 3 with supplied new plans.
No further additions and or changes on this amendment.
PROPOSALS ARE DUE 2:00PM 04/30/2015
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ALAN J. ZERO
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CONSTRUCTION RFP SOL NO AG-1681-S-15-0003-000002
Green Mountain NF
FR58.01.10 AOP Culvert Replacement Over Mad Tom Brook
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
FR58.01.10 AOP Culvert Replacement
Green Mountain National Forest Manchester Ranger District
Bennington County
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
PRICE
TOTAL
15101
Mobilization
Lump Sum
15201
Construction survey and staking, method I, tolerance A
15702
Silt fence
Foot
15713
Soil erosion & pollution control
20102
Clearing and grubbing
20304
Removal of structures and obstructions
20401
Roadway excavation
Cubic Yard
20415
Rock excavation
20801
Structure excavation
20805
Cofferdams
20855
Select granular backfill
25101
Placed riprap, class 3
25116
Geotextile, type IV, class C
Square Yard
30111
Aggregate surface course, grading G, compaction method D
60304
11’-4” span, 7’-2” rise, aluminum box culvert with full invert headwalls, corner panels, and wing walls.
61701
Guardrail system G4, type IV, class A (weathering steel)
Foot
61702
Terminal section, type flared (G-1d)
Each
62503
Seeding, dry method (including fertilizer)
62703
Grubbing Material, 12” thick
62901
Erosion control mat type 1.D
63301
Sign system (Government furnish, installation only)
Each
ITEM
NO.
DESCRIPTION
PAY
EST.
QTY.
TOTAL
64804 Placed streambed simulation rock, bed class 6, placement method A Cubic Yard 67 $________ $________
64856
Rock weir, man rock 2, placement method A
Per Unit
64869
Placed streambed channel rock, rock size 2, placement method A (includes bank rocks and boulder clusters)
Total: $___________
Contractor Notes:
1. Contractor must be registered in www.sam.gov in order to submit an offer on this project. THIS IS A FREE
REGISTRATION.
2. There will not be pre-bid meeting for this project.
3. This is a construction project which has the following bonding requirements:
A. Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 Mobilization.
B. Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
4. Construction Contracts over $650,000 and IDIQ contracts over $150,000 will require registration in CPARS, a performance rating system.
5. Award will be made to one contractor. You must submit pricing for all items, including any option items and/or option years to be considered
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows:
http://www.sam.gov/
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
1. Attch 1 Over Mad Tom BrookSupplemental Specs 44pages
2. Attch 2 Over Mad Tom Brook_Plans Udated 04/17/2015 13pages
3. Attch 3 DBWD VT150035 010215 VT35 Highway Bennington Co 3pages
4. Attch 4 GovtProvidedTechnicalProposalForms 7pages
5. Attch 5 Past Performance Questionnaire 2pages azero Typewritten Text Amendment 000002 dated 04/17/2015
| AG-1681-S-15-0003-000002 IAS |
| AG-1681-S-15-0003-000002 Change Pages |
| SCHEDULE OF ITEMS |
| FR58.01.10 AOP Culvert Replacement |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
SECTION J--LIST OF ATTACHMENTS
| GMNF 2015 FR58.01.10 Over Mad Tom Brook_PLANSET |
| Mad_Tom_Base_Final_V2 1_X_COVER_24_36 (1) |
| Mad_Tom_Base_Final_V2 2_X_NOTES (1) |
| Mad_Tom_Base_Final_V2 3_X_SESC (1) |
| Mad_Tom_Base_Final_V2 4_X_LAYOUT (1) |
| Mad_Tom_Base_Final_V2 5_X_SITE_PLAN (1) |
| Mad_Tom_Base_Final_V2 6_X_PROFILE (1) |
| Mad_Tom_Base_Final_V2 7_X_CULVERT_LAYOUT (1) |
| Mad_Tom_Base_Final_V2 8_X_STREAM_PLAN_PROFILE (1) |
| Mad_Tom_Base_Final_V2 9_X_TYPICAL_DETAILS (1) |
| Mad_Tom_Base_Final_V2 10_CULVERT_ELEVATIONS_SECS (1) |
| Mad_Tom_Base_Final_V2 11_X_CHANNEL_XSEC (1) |