Attach_3_BartlettAOP_XB442_PlanClarification.docx

DOCX document 53 KB Posted

Attached to
Bartlett AOP XB442 Federal contract opportunity
Solicitation number
AG-1484-S-17-0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attach 3 BartlettAOP_XB442_PlanClarification

View the file

Other files for this federal contract opportunity

Other files attached to Bartlett AOP XB442, newest first.
File Type Posted
Attach_5_GovtProvidedTechnicalProposalForms.docx DOCX document
Attach_1_BartlettAOP_XB442_SectJ_FSSupSpecs.docx DOCX document
Attach_4_DBWD_NH170026_010617_NH26_Highway_Carroll_Co.docx DOCX document
AG-1484-S-17-0004_Complete.pdf PDF
Attach_2_BartlettAOP-Site2_FinalPlans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AOP Culvert Replacement Bartlett Experimental Forest/ Saco Ranger District White Mountain National Forest Bartlett, New Hampshire

Plan Clarifications A. Design Set:

Sheet 2, Notes Sheet (1 of 2): General Notes:

· Delete Note 4 and replace with: “The contractor shall be responsible for obtaining all environmental permits. An erosion control plan shall be included in the permit submittal. The Forest Service shall review and sign the permit application(s) prior to submittal. The contractor shall ensure that all permit conditions are met during construction.”

· Delete the first sentence of Note 5.

Sheet 6, Profile and Typical Sections: OM-3L Typical and OM-3R Typical:

· Add installation detail below.

image1.png

File details come from the government source that posted it. Updated .