Attach_3_BartlettAOP_XB442_PlanClarification.docx
DOCX document 53 KB Posted
- Attached to
- Bartlett AOP XB442 Federal contract opportunity
- Solicitation number
- AG-1484-S-17-0004
About this file
Attach 3 BartlettAOP_XB442_PlanClarification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach_5_GovtProvidedTechnicalProposalForms.docx | DOCX document | |
| Attach_1_BartlettAOP_XB442_SectJ_FSSupSpecs.docx | DOCX document | |
| Attach_4_DBWD_NH170026_010617_NH26_Highway_Carroll_Co.docx | DOCX document | |
| AG-1484-S-17-0004_Complete.pdf | ||
| Attach_2_BartlettAOP-Site2_FinalPlans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AOP Culvert Replacement Bartlett Experimental Forest/ Saco Ranger District White Mountain National Forest Bartlett, New Hampshire
Plan Clarifications A. Design Set:
Sheet 2, Notes Sheet (1 of 2): General Notes:
· Delete Note 4 and replace with: “The contractor shall be responsible for obtaining all environmental permits. An erosion control plan shall be included in the permit submittal. The Forest Service shall review and sign the permit application(s) prior to submittal. The contractor shall ensure that all permit conditions are met during construction.”
· Delete the first sentence of Note 5.
Sheet 6, Profile and Typical Sections: OM-3L Typical and OM-3R Typical:
· Add installation detail below.
image1.png
File details come from the government source that posted it. Updated .