Forest_Service_note_082316.docx
DOCX document 19 KB Posted
- Attached to
- Tunnel Stream Specified Road Construction Federal contract opportunity
- Solicitation number
- AG-1484-S-16-0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 80FT_ADM_B_323_ShopDrawings.pdf | ||
| 80_FT_ADM_Bridge_Assembly_Directions.pdf | ||
| 40FTBridgePlans.pdf | ||
| AG-1484-S-16-0014-000001.pdf | ||
| Public_Works_Site_Showing_QandA.docx | DOCX document | |
| Attch_3_DBWD_NH160029_010816_NH29_Highway_Grafton_Co.docx | DOCX document | |
| Attch_4_GovtProvidedTechnicalProposalForms.docx | DOCX document | |
| Attch_2_TunnelStreamTS_DesignPlans.pdf | ||
| AG-1484-S-16-0014.pdf | ||
| Attch_1_TunnelStreamTS_SuplementalSpecs.docx | DOCX document | |
| Attch_2_TunnelStreamTS_DesignPlans.pdf | ||
| Attch_1_TunnelStreamTS_SuplementalSpecs.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08/23/2016 Q&A Tunnel Stream Road Forest Service note, below is the response to a question on compaction for the fill on NFSR New Forest Road extension of NFSR 170 between stations 63+00 to 66+00.
Compaction shall conform to Compaction Method A of the Forest Service Supplemental Specification “204.11(a) Compaction A” This is under Embankment Construction:
(a) Compaction A. Use AASHTO T 27 to determine the amount of material retained on a Number 4 sieve. If there is more than 80 percent retained on the No. 4 sieve use procedure (1). If there is 50 to 80 percent retained on the No. 4 sieve use procedure (2). If there is less than 50 percent retained on the No. 4 sieve use procedure (3).
(1) Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
(b) Eight roller passes of a 20-ton compression-type roller.
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches as follows:
For each additional 6 inches or fraction thereof, increase the number of roller passes in (a) above by four passes.
For each additional 6 inches or fraction thereof, increase the number of roller passes in (b) and (c) above, by eight passes.
(2) Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 sieve. Multiply this number by the percentage of material passing a No. 4 sieve, and add 2 percent to determine the optimum moisture content of the material. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width according to (1) above.
(3) Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 180, method D. For other material classifications, determine the optimum moisture content and maximum density according to AASHTO T 99, method C.
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.
Also note that CLD recommends that fill shall be free of debris, frost, organic matter, loam, muck, peat, clay lumps, rock or pieces of pavement over 6 inches in largest dimension, or any other material which will not provide sufficient support or maintain the completed construction in a stable or satisfactory condition. The plasticity index of the material shall not exceed 10%.
Fill that is too wet for proper compaction shall be disked, harrowed or otherwise dried to a proper moisture content for compacting to the required density. If the fill material cannot be dried within 48 hours of placement, it shall be removed and replaced with drier fill.
Fill that is too dry for proper compaction shall be watered uniformly over the surface of the loose layer. Sufficient water shall be added to allow compaction to the required density.