AmendmentNo3.pdf
PDF 39 KB Posted
- Solicitation number
- AG-05M6-S-15-0040
About this file
Amendment No. 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AmendmentNo2.pdf | ||
| AmendmentNo1.pdf | ||
| SolicitationAG05M6S150040.pdf | ||
| CopyToSubmitAG05M6S150040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT NO. 3 – Issued 7/17/2015
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) Amendment No. 3 7/17/2015
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
MT. BAKER-SNOQUALMIE NATIONAL FOREST
2930 WETMORE AVENUE, STE 3A
EVERETT, WA 98201
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
AG-05M6-S-15-0040
9B. DATED (SEE ITEM 11)
6/12/2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not ex-tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
HUCKLEBERRY HILL THINNING AND PILING, SNOQUALMIE RANGER DISTRICT
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JANET E. HADA, CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
/s/ Janet E. Hada
07/17/2015
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. 3 –
Provides a revised Schedule of Items, Contractor must use the revised Schedule of Items to submit a quote
Pay Item 1 has been removed from this project in its entirety
Quantities listed on the Schedule of Items are estimates only and used for price evaluation purposes
Thinning for Item 2, 3 and 4 are all part of this project
Piling for Pay Items 2, 3 and 4 within 100 feet of the open road system is a Pay Item
Piling beyond 100 feet of the open road system is an Option item
Contractor to leave a 100 ft. no-cut buffer around the Government Meadows Horse Camp (Government will flag this area)
The start work date for this project will be 45 days from the Issuance of the Notice to Proceed, the language estimating August 2, 2015 is deleted
Due date for receipt of quotes is July 27, 2015
Interested contractor must submit pricing on the revised Schedule of Items and applicable documents in the Copy to Submit packet, by July 27, 2015 by emailing to jhada@fs.fed.us, faxing to (425) 783-0129 or by regular mail to:
Mt. Baker-Snoqualmie National Forest Supervisor’s Office Attn: Janet Hada 2930 Wetmore Avenue, Ste 3A Everett, WA 98201
RFQ NO. AG-05M6-S-15-0040
HUCKLEBERRY HILL THINNING AND PILING
SNOQUALMIE RANGER DISTRICT
PIERCE COUNTY, WA
REVISED SCHEDULE OF ITEMS
Note: Before preparing your quote proposal, read instructions carefully. Insert a Unit Price and Total for all items.
PAY ITEM 01 THINNING
Unit No. Description Method of Measure
Unit Estimated Quantity
Unit Price Total
Huckleberry Hill:
Thin each acre
4*
003 Huckleberry Hill:
19*
004 Huckleberry Hill:
23*
TOTAL PAY ITEM 01 $___________________________
PAY ITEM 02 - PILING – WITHIN 100 FT OF OPEN ROAD SYSTEM
Unit No. Description Method of Measure
Unit Estimated Quantity
Unit Price Total
Huckleberry Hill:
Piling within 100Ft of Open Road System, Estimated acreages Unit 2 =
0.25 acres, Unit 3 – 4 acres, Unit 4 –
0.5 acres
5*
TOTAL-PAY ITEM 02 $__________________________
OPTION ITEM - PILING OUTSIDE OF 100 FT OF OPEN ROAD SYSTEM
Unit No. Description Method of Measure
Unit Estimated Quantity
Unit Price Total
Huckleberry Hill:
Piling outside of Open Road System
40*
TOTAL-OPTION ITEM $__________________________
PAY ITEM 01 $__________________________
PAY ITEM 02 $__________________________
OPTION ITEM $__________________________
GRAND TOTAL ALL ITEMS $___________________________
*Quantities are estimated and are used for price evaluation purposes only.
Payment will be made upon the actual quantities, completed, inspected and accepted.
File details come from the government source that posted it. Updated .