AmendmentNo3.pdf

PDF 39 KB Posted

Attached to
HUCKLEBERRY HILL THINNING AND PILING 2015, SNOQUALMIE RANGER DISTRICT
Solicitation number
AG-05M6-S-15-0040
Issued by

About this file

Amendment No. 3

View the file

Other files

File Type Posted
AmendmentNo2.pdf PDF
AmendmentNo1.pdf PDF
SolicitationAG05M6S150040.pdf PDF
CopyToSubmitAG05M6S150040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 3 – Issued 7/17/2015

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) Amendment No. 3 7/17/2015

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

MT. BAKER-SNOQUALMIE NATIONAL FOREST

2930 WETMORE AVENUE, STE 3A

EVERETT, WA 98201

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

AG-05M6-S-15-0040

9B. DATED (SEE ITEM 11)

6/12/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

HUCKLEBERRY HILL THINNING AND PILING, SNOQUALMIE RANGER DISTRICT

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JANET E. HADA, CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

/s/ Janet E. Hada

07/17/2015

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. 3 –

Provides a revised Schedule of Items, Contractor must use the revised Schedule of Items to submit a quote

Pay Item 1 has been removed from this project in its entirety

Quantities listed on the Schedule of Items are estimates only and used for price evaluation purposes

Thinning for Item 2, 3 and 4 are all part of this project

Piling for Pay Items 2, 3 and 4 within 100 feet of the open road system is a Pay Item

Piling beyond 100 feet of the open road system is an Option item

Contractor to leave a 100 ft. no-cut buffer around the Government Meadows Horse Camp (Government will flag this area)

The start work date for this project will be 45 days from the Issuance of the Notice to Proceed, the language estimating August 2, 2015 is deleted

Due date for receipt of quotes is July 27, 2015

Interested contractor must submit pricing on the revised Schedule of Items and applicable documents in the Copy to Submit packet, by July 27, 2015 by emailing to jhada@fs.fed.us, faxing to (425) 783-0129 or by regular mail to:

Mt. Baker-Snoqualmie National Forest Supervisor’s Office Attn: Janet Hada 2930 Wetmore Avenue, Ste 3A Everett, WA 98201

RFQ NO. AG-05M6-S-15-0040

HUCKLEBERRY HILL THINNING AND PILING

SNOQUALMIE RANGER DISTRICT

PIERCE COUNTY, WA

REVISED SCHEDULE OF ITEMS

Note: Before preparing your quote proposal, read instructions carefully. Insert a Unit Price and Total for all items.

PAY ITEM 01 THINNING

Unit No. Description Method of Measure

Unit Estimated Quantity

Unit Price Total

Huckleberry Hill:

Thin each acre

4*

003 Huckleberry Hill:

19*

004 Huckleberry Hill:

23*

TOTAL PAY ITEM 01 $___________________________

PAY ITEM 02 - PILING – WITHIN 100 FT OF OPEN ROAD SYSTEM

Unit No. Description Method of Measure

Unit Estimated Quantity

Unit Price Total

Huckleberry Hill:

Piling within 100Ft of Open Road System, Estimated acreages Unit 2 =

0.25 acres, Unit 3 – 4 acres, Unit 4 –

0.5 acres

5*

TOTAL-PAY ITEM 02 $__________________________

OPTION ITEM - PILING OUTSIDE OF 100 FT OF OPEN ROAD SYSTEM

Unit No. Description Method of Measure

Unit Estimated Quantity

Unit Price Total

Huckleberry Hill:

Piling outside of Open Road System

40*

TOTAL-OPTION ITEM $__________________________

PAY ITEM 01 $__________________________

PAY ITEM 02 $__________________________

OPTION ITEM $__________________________

GRAND TOTAL ALL ITEMS $___________________________

*Quantities are estimated and are used for price evaluation purposes only.

Payment will be made upon the actual quantities, completed, inspected and accepted.