Amendment_1_Cultural_Survey.pdf
PDF 2 MB Posted
- Solicitation number
- AG-05M6-S-14-0031
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 6
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment 1 07/03/2014
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
MT. BAKER-SNOQUALMIE NATIONAL FOREST
2930 Wetmore Avenue, Suite 3A Everett, WA 98201
Same as box 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
AG-05M6-S-14-0031
9B. DATED (SEE ITEM 11)
07/02/2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, X is not ex-tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Hanson Creek Vegetation Management Cultural Resource Field Inventory
Drawings 6-9 were left out of the Solicitation. This Amendment includes those drawings and are part of the Solicitation and any possible contract after that. This amendment also replaces page 20 (Part III—List of Documents, Exhibits, and Other Attachments.
Section J—List of Attachments) of the Solicitation with the Amended page 20. ALL ELSE REMAINS THE SAME.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JORGE A SOMOZA CONTRACTING OFFICER
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
07/03/2014
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Ý
Ý
Ý Ý
Ý
Ý Ý
¼
2322 24
Ta l apus C reek
34003200
38004000
42003800
5500-441
5510-110
18.1
15.6
10.4
18.2
10.2
10.1
10.3
R. 10 E. R. 11 E.
T.
N
R. 10 E. R. 11 E.
T.
N
This product is reproduced from information prepared by the USDA, Forest Service or from other suppliers. The Forest
Service cannot assure the reliability or suitability of this information for a particular purpose. The data and product accuracy may vary due to compilation from various sources, including modeling and interpretation, and may not meet National Map Accuracy Standards.
This information may be updated, corrected or otherwise modified without notification. For more information contact:
Mt. Baker - Snoqualmie National Forest Supervisors Office at 425-783-6000.
The USDA is an equal opportunity provider and employer.
Hans e n C reek
§̈¦90
S. Fork Snoqualmie River §̈¦90
Hu m pb a c k C r ee k
§̈¦90
D. Keenum 15 June 2014
0 1,000 2,000 3,000 4,000
Feet
Proposed Helicoptor LandingÝ
Mt. Baker-Snoqualmie National Forest Interstate 90
HANSEN CREEK VEGETATION PROJECT
Non-Forest Service Land
Unit Number18.1
Project Unit
Open Road Closed Road
High Heritage Probability (0-20% Slope) Medium Heritage Probability (20-35% Slope) Low Heritage Probability (>35% Slope)
Trail
Rock Source
¼
H e r i ta g e S u rv e y M a p 3
!Ý
!Ý
!Ý !Ý
!Ý
!Ý !Ý
¼
2322 24
Ta l apus C reek
34003200
38004000
42003800
18.1
15.6
10.4
18.2
10.2
10.1
10.3
5500-451
5500-4615500-431
5500-441
5510-110 ßÀ9035 ßÀ9070 ßÀ9034 ßÀ5590 ßÀ5500 ßÀ9030 ßÀ5510
R. 10 E. R. 11 E.
T.
N
R. 10 E. R. 11 E.
T.
N
This product is reproduced from information prepared by the USDA, Forest Service or from other suppliers. The Forest
Service cannot assure the reliability or suitability of this information for a particular purpose. The data and product accuracy may vary due to compilation from various sources, including modeling and interpretation, and may not meet National Map Accuracy Standards.
This information may be updated, corrected or otherwise modified without notification. For more information contact:
Mt. Baker - Snoqualmie National Forest Supervisors Office at 425-783-6000.
The USDA is an equal opportunity provider and employer.
Hans e n C reek
§̈¦90 §̈¦90
Hu m pb a c k C r ee k
S. Fork Snoqualmie River
§̈¦90
D. Keenum 15 June 2014
0 1,000 2,000 3,000 4,000
Feet
Proposed Helicoptor Landing!Ý
Mt. Baker-Snoqualmie National Forest Interstate 90
HANSEN CREEK VEGETATION PROJECT
Non-Forest Service Land
Unit Number18.1
Project Unit
Other Road
Trail
Rock Source
¼
H e r i ta g e S u rv e y R o a d M a p 3 Road Operational Maintenance Level
3 - Suitable for Passenger Cars 5 - High Degree of User Comfort 4 - Moderate Degree of User Comfort 2 - High Clearance Vehicles 1 - Basic Custodial Care (CLOSED)
Ý
Ý
ÝÝ Ý
Ý
Ý Ý
Ý Ý
Ý
¼
9 10
14 13
44004200400038003600340032003000
0 32
00 30
00360
58009035
5500-4415500-410
5510-110
15.6
10.4
18.2
10.2
10.1
10.3
R. 10 E.
T.
N
R. 10 E.
T.
N
This product is reproduced from information prepared by the USDA, Forest Service or from other suppliers. The Forest
Service cannot assure the reliability or suitability of this information for a particular purpose. The data and product accuracy may vary due to compilation from various sources, including modeling and interpretation, and may not meet National Map Accuracy Standards.
This information may be updated, corrected or otherwise modified without notification. For more information contact:
Mt. Baker - Snoqualmie National Forest Supervisors Office at 425-783-6000.
The USDA is an equal opportunity provider and employer.
Hanse n Creek
§̈¦90
S. Fork Snoqualmie River
Ta la pu sC re ek
§̈¦90
Hu m p b a c k C r ee k
§̈¦90
18.1
D. Keenum 15 June 2014
0 1,000 2,000 3,000 4,000
Feet
Proposed Helicoptor LandingÝ
Mt. Baker-Snoqualmie National Forest Interstate 90
HANSEN CREEK VEGETATION PROJECT
Non-Forest Service Land
Unit Number10.3
Project Unit
Open Road Closed Road
High Heritage Probability (0-20% Slope) Medium Heritage Probability (20-35% Slope) Low Heritage Probability (>35% Slope)
Trail
Rock Source
¼
H e r i ta g e S u rv e y M a p 4
!Ý
!Ý
!Ý!Ý !Ý
!Ý
!Ý !Ý
!Ý !Ý
!Ý
¼
9 10
14 13
44004200400038003600340032003000
0 32
00 30
00360
15.6
10.4
18.2
10.2
10.1
10.3
-41
5500-451
5500-4615500-431
5500-4415500-410
5510-110 ßÀ9035 ßÀ9034 ßÀ9032 ßÀ5510 ßÀ9030 ßÀ5590 ßÀ5500 ßÀ9030 ßÀ5510
R. 10 E.
T.
N
R. 10 E.
T.
N
This product is reproduced from information prepared by the USDA, Forest Service or from other suppliers. The Forest
Service cannot assure the reliability or suitability of this information for a particular purpose. The data and product accuracy may vary due to compilation from various sources, including modeling and interpretation, and may not meet National Map Accuracy Standards.
This information may be updated, corrected or otherwise modified without notification. For more information contact:
Mt. Baker - Snoqualmie National Forest Supervisors Office at 425-783-6000.
The USDA is an equal opportunity provider and employer.
Hanse n Creek
§̈¦90
S. Fork Snoqualmie River
Ta la pu sC re ek
§̈¦90
Hu m p b a c k C r ee k
§̈¦90
18.1
D. Keenum 15 June 2014
0 1,000 2,000 3,000 4,000
Feet
Proposed Helicoptor Landing!Ý
Mt. Baker-Snoqualmie National Forest Interstate 90
HANSEN CREEK VEGETATION PROJECT
Non-Forest Service Land
Unit Number10.3
Project Unit
Other Road
Trail
Rock Source
¼
H e r i ta g e S u rv e y R o a d M a p 4 Road Operational Maintenance Level
3 - Suitable for Passenger Cars 5 - High Degree of User Comfort 4 - Moderate Degree of User Comfort 2 - High Clearance Vehicles 1 - Basic Custodial Care (CLOSED)
Amendment 1
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
1. Project Drawings 9
Page No Description 1 Heritage Probability Survey Map 1 2 Heritage Survey Map 1 1 3 Heritage Survey Road Map 1 1 4 Heritage Survey Map 2 1 5 Heritage Survey Road Map 2 1 6 Heritage Survey Map 3 1 7 Heritage Survey Road Map 3 1 8 Heritage Survey Map 4 1 9 Heritage Survey Road Map 4 1
2. DOL Wage Decision No. WA 2005-2564 10
3. Fire Protection and Suppression (R6-FS-6300-52) 5
4. Past and Current Contract Information 1
| Amended Maps.pdf |
| Map3HeritageSurvey061514 |
| Map3HeritageSurveyRoads061514 |
| Map4HeritageSurvey061514 |
| Map4HeritageSurveyRoads061514 |
File details come from the government source that posted it. Updated .