Questions and Answers 2

View the file

Other files

File Type Posted
Prince_Creek_Amend_002.pdf PDF
prince_creek_amendment.pdf PDF
Prince_Creek_Float_Replacement_Package.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prince Creek Float Replacement Clarification Questions #2:

Question #1

Period of Performance Section C.1 states that due to wildlife restrictions, pile driving cannot be done until May 15,2016 and C.2 states that the estimated start work date is October 5 th

2015 and completed no later than June 30 th

2016. However, addendum #1 states that the period of performance is between 10/05/15 to 03/31/16. Please provide the correct period of performance and the allowable time for the pile driving.

Answer#1: Contract end date is 6/30/2016.

Please bid pile driving as it shows in the contract with: due to wildlife restrictions, pile driving cannot be done until May 15, 2016.

Question#2

The specs tells us to drive the pile to very tight tolerance including drilling them if rock is encounter. However, no soils reports information are provided. We’ve installed piles at 25 Mile

Creek and encountered rock so therefore we believe rock may be present at the site and a downhole hammer pile drilling method might be required to install the piles. A downhole hammer is a very expensive method so are we to include a downhole hammer drilling installation in our bid? Or can we obtain a copy of the soils report to review the soils condition in the area?

Answer #2: There are no soil reports completed, so we will be unable to provide that for you.

Question #3 Availability of Port Orford Cedar

Answer #3: Yes, in general the Alaska Yellow Cedar (AYC) glulams are an acceptable substitution for the Port Orford Cedar (POC) glulams specified. Here are the requirements if

AYC is used in lieu of POC:

WALERS, LEDGERS AND SILL GLULAMS MAY BE 2000f, COMBINATION EWS 20F-

V13/AYC (BALANCED) ALASKA YELLOW CEDAR,

MANUFACTURED IN ACCORDANCE WITH AITC 117 SPECIFICATIONS. THE

GLULAMS SHALL HAVE AN INDUSTRIAL FINISH, BE FOR

EXTERIOR USE AND HAVE THE FOLLOWING MINIMUM DESIGN VALUES FOR

LOADING PARALLEWL TO THE WIDE FACES OF THE

LAMINATIONS: BENDING STRENGTH (Fb) = 2,000 PSI HORIZONTAL SHEAR (Fv) =

265 PSI and MODULUS OF ELASTICITY (E) = 1,500,000 psi.

*Due to tight timelines for award, no extension will be provided for offers received. Offers are still due at 9/25/15 at 0800

*If substitute products are to be bid, contractors shall specific in their technical proposal