J_3-Specifications.pdf
PDF 78 KB Posted
- Attached to
- Quinault Ranger House Roof Replacement, Pacific Ranger District, Grays Harbor County, Washington
- Solicitation number
- AG-05G2-S-17-0013
About this file
J-3 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_No_001.pdf | ||
| Amendment_No_001.pdf | ||
| J_6-Fire_Plan.pdf | ||
| Sol_No_AG-05G2-S-17-0013.pdf | ||
| J_7-Experience_and_Past_Performance_Questionnaire.pdf | ||
| J_5-Wage_Determination.pdf | ||
| J_4-Pictures_Quinault_Reroof.pdf | ||
| J-7_Experience_and_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY-17 Quinault Ranger House Reroof 00100-1
SECTION 00100
MEASUREMENT AND PAYMENT
33. PART I - GENERAL
1.1 MEASUREMENT AND PAYMENT - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental in the payment for items shown.
When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be bid.
1.2 DETERMINATION OF QUANTITIES - The following methods of measurement are used to determine contract quantities for payment.
A. For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.
B. The average end area method will be used to compute volumes of excavation or embankment. However, if in the judgment of the Engineer, the average end area method is impractical, measurement will be made by volume in hauling vehicles or by other three dimensional methods.
C. Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the Engineer in writing to fit field conditions.
D. For items that are measured by the linear foot, measurements will be made parallel to the base or foundation upon which the structures are placed. Pipe and pipe arch culverts shall be measured along center of invert; arches shall be measured at spring line.
E. For aggregates weighed for payment, the tonnage will not be adjusted for moisture content, unless otherwise provided in SPECIAL PROJECT SPECIFICATIONS.
F. For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
FY-17 Quinault Ranger House Reroof 00100-2
1.3 UNITS OF MEASUREMENT - Payment will be by units defined and determined according to U.S. Standard measure as follows:
A. Acre – Make longitudinal and transverse measurements for area computations horizontally.
B. Cubic Yard - A measurement computed by one of the following methods:
1. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.
3. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.
D. Each - One complete unit, which may consist of one or more parts.
E. Gallon – The quantity may be measured by any of the following methods:
1. Measured volume container.
2. Metered volume. Use an approved metering system
3. Commercially packaged volumes.
F. Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor.
G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.
H. MFBM - One thousand board feet measure based on nominal widths, thicknesses, and extreme usable length of each piece of lumber or timber actually incorporated in the job.
I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.
J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.
K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal.
L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal.
M. Station - One hundred linear feet measured horizontally.
N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.
O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.
P. Ton - Short ton consisting of 2,000 pounds.
Q. Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile.
R. Lump Sum – One complete unit.
FY-17 Quinault Ranger House Reroof 00100-3
1.4 METHODS OF MEASUREMENT - One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:
A. Designed Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
1. As a result of changes in the work authorized by the Contracting Officer.
2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent or more.
3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.
C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.
D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.
E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
1.5 EARTHWORK TOLERANCES - The maximum grade for the accessible sidewalk shall not exceed 8%. Adjustments of vertical alignment, within the tolerances specified in this contract, shall be made by the contractor as necessary to produce the designed sidewalk section. Such adjustments shall not be considered as "Changes."
34. PART II - PRODUCTS (NOT APPLICABLE)
35. PART III - EXECUTION (NOT APPLICABLE)
END OF SECTION 00100
FY-17 Quinault Ranger House Reroof 00110-1
SECTION 00110
QUALITY CONTROL AND QUANTITY MEASUREMENT
33. PART I - GENERAL
1.1 SCOPE - This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 MEASUREMENT AND PAYMENT - No separate payment will be made for the work included under this section. Payment for this work is considered incidental to other items of work.
34. PART II - PRODUCTS (NOT APPLICABLE)
35. PART III - EXECUTION
3.1 RECORDS OF INSPECTION AND TESTS - Inspection and Tests - The Contractor shall maintain current records of all inspections and tests performed.
The following format or one containing the following information will be acceptable to the government:
Project________________________ Contract No.______________________
Pay Item No.
Test
Date
Station
Standard
Results
Test by (Initials)
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
As-built Drawings - The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Engineer.
3.2 CERTIFICATIONS AND MEASUREMENTS
FY-17 Quinault Ranger House Reroof 00110-2
A. Offsite Produced Materials - The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.
B. Quantity Measurements - The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the Contracting Officer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
Project ______________________ Contract No._______________________
Pay Item No.
Date
Station
Quantity or Measurement
Measured by (Initials)
END OF SECTION 00110
FY-17 Quinault Ranger House Reroof 013300-1
SECTION 01 33 00
SUBMITTALS
1. PART I - GENERAL
1.1 SCOPE - This section covers the contractor's responsibility relating to all submittals that relate to the construction of the work.
1.2 MEASUREMENT AND PAYMENT - No separate measurement and/or payment will be made for this section.
38. PART II – PRODUCTS (NOT APPLICABLE)
39. PART III - EXECUTION
3.1 ALL SUBMITTALS - It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the submittal. Contractor shall allow up to 15 calendar days for processing of submittals by the Government.
3.2 MANUFACTURER'S LITERATURE AND SHOP DRAWINGS
B. Submit four copies to the Contracting Officer for approval on the items required herein.
Literature which is not marked or otherwise designated to show the exact model and size that the Contractor proposes to use will be returned by the Contracting Officer "without action." Circle or check items to be used on submittals. Highlighter pens may print black or not at all when copied and should not be used.
C. Information must be adequate to determine compliance with specifications.
D. Submit four copies of shop drawings. One copy of all shop drawings will be returned to the contractor.
E. Submittals or shop drawings which are received from sources other than through the contractor's office will be returned by the COR "without action."
3.3 SAMPLES - Submit two samples of each color, style, etc. One sample of selected color, etc., will be retained. All other samples and all hardware samples will be returned.
3.4 SUBSTITUTION - Materials in the specifications may be followed by the words "or approved equal." In these cases, wherever the name or brand of a manufacturer's article is specified, it is used as a measure of quality and utility or a standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, the Contractor shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution and
FY-17 Quinault Ranger House Reroof 013300-2 his decision shall be final. Unless substitutions are requested within the time stated above and as provided below, no deviation from the specifications will be allowed.
* Requests for substitutions will only be considered if contractor submits the following:
A. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
B. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
C. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
D. A list of other trades which may be affected by the substitution.
E. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
END OF SECTION 013300
USDA FOREST SERVICE PROJECT SPECIFICATIONS
FY-17 Quinault Ranger House Reroof 07 31 29 - 1/2
SECTION 07 31 29
WOOD SHINGLES
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies wood shingles and shakes.
1.02 RELATED SECTIONS
1.03 DELIVERY, STORAGE, AND HANDLING
A. Deliver material to the site, undamaged, with labels intact. Store out of the weather in a well ventilated area.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Wood Shingles.
1. VG, 16 inch, No. 1 Western Red Cedar (WRC), maximum width 10 inch, minimum width 4 inch.
B. Nails.
1. Hot-dipped galvanized box nails, size as required to firmly secure the shakes or shingles to sheathing. Nails shall not penetrate exposed surfaces. Equivalent stainless steel staples may be used in lieu of nails with the approval of the
COR.
C. Felt.
1. ASTM D226, Type II, 30 pounds/square.
D. Flashing.
1. 26 gauge G.I.
3. PART 3 - EXECUTION
3.01 WOOD SHINGLES
A. Lay shingles with 5-1/2 inch exposure. Apply double starter course at eaves.
Project first course 1-1/2 inch beyond sheathing. Space shingles 1/4 inch apart and staggers joints 1-1/2 inch in adjacent courses. Joints in alternate courses shall not be in direct alignment.
B. Finish hips and ridges "Boston Style" with concealed fastening.
C. Install metal flashing in all valleys. Extend 10 inch on each side of valley center.
Saw all shingles extending into valleys to the proper miter.
D. Install metal flashing at intersections with vertical surfaces. Extend flashing 8 inch under shingles.
E. Apply shingles with two fasteners per shingle, 3/4 inch from the edge and not more than 1 inch above the exposure line.
FY-17 Quinault Ranger House Reroof 07 31 29 - 2/2
4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION
FY-17 Quinault Ranger House Reroof 07 62 00 - 1/2
SECTION 07 62 00
SHEET METAL FLASHING AND TRIM
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies flashing and sheet metal work, and required accessories.
1.02 RELATED SECTIONS
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Flashing:
1. 26 gauge galvanized steel, ASTM A361, ASTM G90, Type I, Class D or 0.032 inch thick aluminum.
B. Roof Drains, Gutters, and Downspouts.
1. 26 gauge galvanized steel, ASTM B361, ASTM G90, Type I, Class D, or
0.032 inch thick aluminum.
C. Gutter Spikes.
1. ASTM F1667.
D. Plastic Cement.
1. ASTM C920, Type S.
2.02 FABRICATION
A. Shop fabricates items where possible. Accurately reproduce profiles.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Metal Roof Edging.
1. Bend and solder all corners. Lap soldered joints a minimum of 1 inch and fasten with rivets or sheet metal screws before bedding in plastic cement.
B. Gutters.
1. Attach with spikes and ferrules or screws and hangers as approve by manufacturer.
C. Downspouts.
1. Fasten at top and bottom and every 10 feet for buildings greater than one story.
Terminate leaders with a turnout from building to connect to drains or splash blocks.
D. Foundation Flashing.
1. Install galvanized steel flashing at all location required to separate wood from concrete or masonry.
E. Sill Flashing.
FY-17 Quinault Ranger House Reroof 07 62 00 - 2/2
1. Install galvanized steel flashing at sills of exterior openings, or as shown on the Drawings.
F. Head Flashing.
1. Install galvanized steel or aluminum flashing at the head of all openings finished with wood trim. Extend flashing 2 inches up behind siding, over the top of the trim and turned down to form a drip cap.
G. Horizontal Plywood Siding Joint.
1. Install galvanized steel or aluminum "Z" flashing at joints. Extend flashing 1 inch behind top sheet and 1/2 inch in front of bottom sheet and turned down to form a drip cap.
4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION
| 00100_MeasureAndPayment |
| 33. PART I - GENERAL |
| A. For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, e... |
| B. The average end area method will be used to compute volumes of excavation or embankment. However, if in the judgment of the Engineer, the average end area method is impractical, measurement will be made by volume in hauling vehicles or by other th... |
| C. Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the Engineer in writing to fit field conditions. |
| D. For items that are measured by the linear foot, measurements will be made parallel to the base or foundation upon which the structures are placed. Pipe and pipe arch culverts shall be measured along center of invert; arches shall be measured at sp... |
| E. For aggregates weighed for payment, the tonnage will not be adjusted for moisture content, unless otherwise provided in SPECIAL PROJECT SPECIFICATIONS. |
| F. For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by... |
| A. Acre – Make longitudinal and transverse measurements for area computations horizontally. |
| B. Cubic Yard - A measurement computed by one of the following methods: |
| C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile. |
| D. Each - One complete unit, which may consist of one or more parts. |
| E. Gallon – The quantity may be measured by any of the following methods: |
| 1. Measured volume container. |
| 2. Metered volume. Use an approved metering system |
| 3. Commercially packaged volumes. |
| F. Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor. |
| G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal. |
| H. MFBM - One thousand board feet measure based on nominal widths, thicknesses, and extreme usable length of each piece of lumber or timber actually incorporated in the job. |
| I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp. |
| J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used. |
| K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal. |
| L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal. |
| M. Station - One hundred linear feet measured horizontally. |
| N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station. |
| O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile. |
| P. Ton - Short ton consisting of 2,000 pounds. |
| Q. Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile. |
| R. Lump Sum – One complete unit. |
| 1. As a result of changes in the work authorized by the Contracting Officer. |
| 2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent or more. |
| 3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evide... |
| B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction. |
| C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work. |
| D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles. |
| E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured. |
| 34. PART II - PRODUCTS (Not Applicable) |
| 35. PART III - EXECUTION (Not Applicable) |
| 00110_QualityControlAndMeasurement |
| 33. PART I - GENERAL |
| 34. PART II - PRODUCTS (Not Applicable) |
| 35. PART III - EXECUTION |
| 3.1 Records of Inspection and Tests - Inspection and Tests - The Contractor shall maintain current records of all inspections and tests performed. |
| 3.2 Certifications and Measurements |
| B. Quantity Measurements - The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress pay... |
| 013300_Submittals |
| 1. PART I - GENERAL |
| 38. PART II – PRODUCTS (NOT APPLICABLE) |
| 39. PART III - EXECUTION |
| 3.2 Manufacturer's Literature and Shop Drawings |
| B. Submit four copies to the Contracting Officer for approval on the items required herein. Literature which is not marked or otherwise designated to show the exact model and size that the Contractor proposes to use will be returned by the Contractin... |
| C. Information must be adequate to determine compliance with specifications. |
| D. Submit four copies of shop drawings. One copy of all shop drawings will be returned to the contractor. |
| E. Submittals or shop drawings which are received from sources other than through the contractor's office will be returned by the COR "without action." |
| A. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the... |
| B. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ. |
| C. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws. |
| D. A list of other trades which may be affected by the substitution. |
| E. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions. |
| 073129_WoodShingles |
| 1. Part 1 - GENERAL |
| 1.01 summary |
| A. This section specifies wood shingles and shakes. |
| 1.02 related sections |
| 1.03 Delivery, Storage, and Handling |
| A. Deliver material to the site, undamaged, with labels intact. Store out of the weather in a well ventilated area. |
| 2. Part 2 - PRODUCTS |
| 2.01 Materials |
| A. Wood Shingles. |
| 1. VG, 16 inch, No. 1 Western Red Cedar (WRC), maximum width 10 inch, minimum width 4 inch. |
| B. Nails. |
| 1. Hot-dipped galvanized box nails, size as required to firmly secure the shakes or shingles to sheathing. Nails shall not penetrate exposed surfaces. Equivalent stainless steel staples may be used in lieu of nails with the approval of the COR. |
| C. Felt. |
| 1. ASTM D226, Type II, 30 pounds/square. |
| D. Flashing. |
| 1. 26 gauge G.I. |
| 3. Part 3 - EXECUTION |
| 3.01 Wood Shingles |
| A. Lay shingles with 5-1/2 inch exposure. Apply double starter course at eaves. Project first course 1-1/2 inch beyond sheathing. Space shingles 1/4 inch apart and staggers joints 1-1/2 inch in adjacent courses. Joints in alternate courses shall n... |
| B. Finish hips and ridges "Boston Style" with concealed fastening. |
| C. Install metal flashing in all valleys. Extend 10 inch on each side of valley center. Saw all shingles extending into valleys to the proper miter. |
| D. Install metal flashing at intersections with vertical surfaces. Extend flashing 8 inch under shingles. |
| E. Apply shingles with two fasteners per shingle, 3/4 inch from the edge and not more than 1 inch above the exposure line. |
4. Part 4 - MEASUREMENT AND PAYMENT (not used)
| 076200_FlashingTrim |
| 1. Part 1 - GENERAL |
| 1.01 summary |
| A. This section specifies flashing and sheet metal work, and required accessories. |
1.02 related sections
| 2. Part 2 - PRODUCTS |
| 2.01 Materials |
| A. Flashing: |
| 1. 26 gauge galvanized steel, ASTM A361, ASTM G90, Type I, Class D or 0.032 inch thick aluminum. |
| B. Roof Drains, Gutters, and Downspouts. |
| 1. 26 gauge galvanized steel, ASTM B361, ASTM G90, Type I, Class D, or 0.032 inch thick aluminum. |
| C. Gutter Spikes. |
| 1. ASTM F1667. |
| D. Plastic Cement. |
| 1. ASTM C920, Type S. |
| 2.02 Fabrication |
| A. Shop fabricates items where possible. Accurately reproduce profiles. |
| 3. Part 3 - EXECUTION |
| 3.01 construction |
| A. Metal Roof Edging. |
| 1. Bend and solder all corners. Lap soldered joints a minimum of 1 inch and fasten with rivets or sheet metal screws before bedding in plastic cement. |
| B. Gutters. |
| 1. Attach with spikes and ferrules or screws and hangers as approve by manufacturer. |
| C. Downspouts. |
| 1. Fasten at top and bottom and every 10 feet for buildings greater than one story. Terminate leaders with a turnout from building to connect to drains or splash blocks. |
| D. Foundation Flashing. |
| 1. Install galvanized steel flashing at all location required to separate wood from concrete or masonry. |
| E. Sill Flashing. |
| 1. Install galvanized steel flashing at sills of exterior openings, or as shown on the Drawings. |
| F. Head Flashing. |
| 1. Install galvanized steel or aluminum flashing at the head of all openings finished with wood trim. Extend flashing 2 inches up behind siding, over the top of the trim and turned down to form a drip cap. |
| G. Horizontal Plywood Siding Joint. |
| 1. Install galvanized steel or aluminum "Z" flashing at joints. Extend flashing 1 inch behind top sheet and 1/2 inch in front of bottom sheet and turned down to form a drip cap. |
4. Part 4 - MEASUREMENT AND PAYMENT (not used)