Road_Maint_2016-2019__RFP.pdf

PDF 2 MB Posted

Attached to
Road Maintenance (2016-2019) Federal contract opportunity
Solicitation number
AG-05G2-S-16-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Road Maintenance (2016-2019), newest first.
File Type Posted
Amendment_No_001.pdf PDF
Amendment_No_001.pdf PDF
J-5_Fire_Plan.pdf PDF
J-1_Road_List.pdf PDF
J-2-FY16-19_Specifications.pdf PDF
J-3a_SCA_WD_No_1977-0209.pdf PDF
J-4_DBA_WD_WA20150001_abbr.pdf PDF
J-3b_SCA_WD_No_2005-2560.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1.THIS CONTRACT IS A RATED ORDER RATING PAGE OF

UNDER DPAS (15 CFR 700) 01 130 PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE

AG-05G2-S-16-0004

SEALED BID (IFB)

MAR. 04, 2016

NUMBER

NEGOTIATED (RFP)

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

North Contracting Area

O lympic National Forest 1835 Black Lake Blvd., Suite A O lympia, WA 98512

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule w ill be received at the place specif ied in Item 8, or if handcarried, in the depository located in Supervisor’s Office until 4:30 p.m. local time APR. 05 2016

(Hour) (Date)

CAUTION - LATE Submissions, Modif ications, and Withdraw als: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

A. NAME

B. TELEPHONE NO. (NO COLLECT

CALLS)Area Code/Number/Extension

C. E-MAIL ADDRESS

CALL: Miley Sutherland (360) 956-2471 msutherland@fs.fed.us

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM X I CONTRACT CLAUSES

X B SUPPLIES OR SERVICES AND PRICES/COSTS PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

X C

DESCRIPTION/SPECS./WORK/STATEMENT X J LIST OF ATTACHMENTS

D PACKAGING AND MARKING PART IV - REPRESENTATIONS AND INSTRUCTIONS

X E

INSPECTION AND ACCEPTANCE

X

K REPRESENTATIVES, CERTIFICATIONS AND

X F

DELIVERIES OR PERFORMANCE OTHER STATEMENTS OF OFFERORS

X G CONTRACT ADMINISTRATION DATA X L INSTRS., CONDS., AND NOTICES TO OFFERORS

X H

SPECIAL CONTRACT REQUIREMENTS X M EVALUATION FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance w ith the above, the undersigned agrees, if this offer is accepted within 60 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon w hich prices are offered at the price s et opposite each item, delivered at the designated point(s), w ithin the time specif ied in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS

(See Section I, Clause No. 52-232-8) % % % %

14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amend-ments to the SOLICITATION for offerors and related documents numbered and dated:

15A.

NAME AND

ADDRESS

OF OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or Print)

15B. TELEPHONE NO. (Include area code and extension)

15C. CHECK IF REMITTANCE ADDRESS

17. SIGNATURE

18. OFFER DATE

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253(c) ( ) (4 copies unless otherwise specified) 07

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

IPP

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

(Signature of Contracting Officer) IMPORTANT - Aw ard will be made on this Form, or on Standard Form 26, or by other authorized off icial w ritten notice.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV.9-97)

FOR INFORMATION CALL:

Miley Sutherland (360) 956-2471 Contract Specialist

Kevin Gu (360) 956-2415 Road Management & Maintenance

Engineer

Brian Hindman (360) 288-0231

Road Management & Maintenance Technician

Project Name : Road Maintenance FY 2016 – FY 2019

Olympic National Forest Clallam, Jefferson, Mason, and Grays Harbor Counties, Washington

This procurement is set-aside for small business concerns.

Proposal Preparation Instructions

General. To compete for the contract described in this solicitation, you must submit a proposal that includes the following;

a. Standard Form 33, Solicitation/ Offer/ Award (p. 1);

b. Section B, Schedule of Items (p. 3 – 26);

c. Section K, Certifications and Representations (p. 98 – 111);

d. Resumes for Proposed Managers, Key Personnel, and Subcontractors (p. 114);

e. List of BioPreferred Products that will be used; and

f. Experience and Past Performance Questionnaire (p. 112 - 113).

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

The roads in the southern Hood Canal Ranger District will be split between the Pacific and the Hood Canal Maintenance Contracts. The junction of FSR 23 and FSR 2364, approximately FSR 23, M.P. 20.5, will be the cutoff. All roads, including the FSR 23, west of the junction will be maintained under the

Pacific Maintenance Contract. All roads, including the FSR 23, east of the junction will be maintained under the Hood Canal Maintenance Contract.

B.1 Schedule of Items, Road Maintenance; Hood Canal.

B.1.1 BASE YEAR: May 1, 2016 – April 30, 2017.

The offeror must submit a price on all sub-items.

(DBA): Wage Rate Requirements (Construction) wage rates apply.

(SCA): Service Contract Act wages rates apply.

Item 1.1 – Hood Canal – Base (May 1, 2016 – April 30, 2017)

Sub-Item No.

Description Estimated Quantity

Unit Unit Price Amount

Project Work (Hourly Rate) (SCA):

807(2) Excavator w/ Operator, in one or more of the following classes:

121 – 160 FWHP 50 HR $ $

161 – 200 FWHP 50 HR $ $

201 – 280 FWHP 50 HR $ $

807(3) Backhoe w/Operator 50 HR $ $

807(4) Grader w/Operator 30 HR $ $

807(5) Crawler Tractor (Dozer) w/Operator, in one or more of the following classes:

80 – 120 FWHP 30 HR $ $

121 – 180 FWHP 30 HR $ $

181 – 269 FWHP 30 HR $ $

807(6) Dump Truck w/Operator 30 HR $ $

807(7) Roller w/Operator 30 HR $ $

807(8) Trailer 50 HR $ $

807 (9) Laborer 50 HR $ $

Service & Construction Items:

811(1) Surface Maintenance

Double Lane Roads (SCA)

30 DLM $ $

811(2) Surface Maintenance

Single Lane Roads (SCA)

30 SLM $ $

811(3) Should Maintenance (SCA) 30 MI $ $

813(1) Spot Surfacing Commercial Source (SCA) Haul less than 20 miles

200 CY $ $

813(2) Spot Surfacing

Commercial Source (SCA) Haul greater than 20 miles

813(3) Spot Surfacing

Government Furnished (SCA)

813(4) Spot Surfacing

813(5) Resurfacing – 200-1000 C.Y. Project

Commercial Source (DBA)

300 CY $ $

813(6) Resurfacing – 200-1000 C.Y. Project

Government Source (DBA)

813(7) Resurfacing – 200-1000 C.Y. Project

814(1) Pothole Patching (SCA) 10 TON $ $

814(2) Asphalt Skin Patching (DBA):

Hot Mix 10 TON $ $ Cold Mix 10 TON $ $

814(3) Crack Sealing (DBA): 1000 LF $ $

814(4) Paved Surface Cleaning

Single Lane (SCA):

20 SLM $ $

814(5) Paved Surface Cleaning

Double Lane (SCA):

832(1) Load, Haul, and Place Material (SCA)

Haul less than 1/10th mile

500 CY $ $

832(2) Haul Material (SCA) Haul between 1/10th mile and 1 mile

300 CY/MI $ $

832(3) Haul Material (SCA)

Haul greater than 1 mile

251(1) Rip Rap, Commercial Sourced (DBA) 100 CY $ $

Class V Machine Placed Method A

251(1) Rip Rap, Commercial Sourced (DBA) Class III Hand Placed

100 CY $ $

251(1) Rip Rap, Government Furnished(DBA)

833(1) Culvert Replacement, 18”

Contractor Furnished (DBA) Excavation less than 100 C.Y.

120 LF $ $

833(2) Culvert Replacement, 24”

Excavation less than 200 C.Y.

120 LF $ $

833(3) Culvert Replacement, 36” Contractor Furnished (DBA) Excavation less than 300 C.Y.

60 LF $ $

833(4) Culvert Removal (DBA) 5 EA $ $

833(5) Water Bar Installation (SCA) (smaller structure than cross ditch, used for cutting off surface runoff)

20 EA $ $

833(6) Cross Ditch Installation (SCA)

(larger structure than water bar, used for cutting off ditch runoff)

834(1) Clean & Recondition Culverts (SCA)

24” in diameter and under

50 EA $ $

834(2) Clean & Recondition Culverts (SCA)

24” – 48” in diameter

834(3) Clean & Recondition Culverts (SCA) Greater than 48” diameter

10 EA $ $

834(4) Clean Ditches (SCA) 20 MI $ $

834(5) Clean Ditches &Drainage Structures

(SCA)

20 MI $ $

839(1) Spring Recurrent Maintenance of ML 3-4 Roads Without Surface Maintenance (SCA)

37 MI $ $

839(2) Spring Recurrent Maintenance of ML

2 Roads Without Surface

60 MI $ $

841(1) Establish Vegetation (SCA) 2 AC $ $

851(1) Danger Tree Removal (SCA) 30 EA $ $

851(2) Logging Out (ML 3-4) (SCA)

Trees less than 8” dbh

851(3) Logging Out (ML 3-4) (SCA)

Trees 8”-36” dbh

851(4) Logging Out (ML 3-4) (SCA)

Trees greater than 36” dbh

851(5) Logging Out (ML 2) (SCA)

851(6) Logging Out (ML 2) (SCA)

851(7) Logging Out (ML 2) (SCA)

861(1) Maintain Traffic Gate (SCA) 5 EA $ $

861(2) Maintain Guardrail (SCA) 2 EA $ $

861(3) Steel Structure Component and

Fastener Replacement (SCA)

2 EA $ $

861(4) Remove Gate (SCA) 2 EA $ $

861(5) Remove Rock/Earth Barrier (SCA) 5 EA $ $

872(1) Install or Replace Single Post and

Sign (DBA)

872(2) Install or Replace Double Post and

881(1) Mobilization/Equipment Moving for

Special Project (DBA)

100 MI $ $

890(1) Identification of Road Work (SCA) 200 MI $ $

Unit of Measurements:

SLM Single-Lane Mile

DLM Double-Lane Mile MI Mile CY Cubic Yard

CY/MI Cubic Yard per Mile EA Each LS Lump Sum

HR Hour LF Linear Foot

B.1.2 Year Two: May 1, 2017 – April 30, 2018.

The offeror must submit a price on all sub-items.

(DBA): Wage Rate Requirements (Construction) wage rates apply.

(SCA): Service Contract Act wages rates apply.

Item 1.2 – Hood Canal – Year Two (May 1, 2017 – April 30, 2018)

Sub-Item No.

Description Estimated

Commercial Source (SCA)

Excavation less than 100 C.Y.

120 LF $ $

833(2) Culvert Replacement, 24” Contractor Furnished (DBA) Excavation less than 200 C.Y.

120 LF $ $

833(3) Culvert Replacement, 36”

20 EA $ $

851(6) Logging Out (ML 2) (SCA)

DLM Double-Lane Mile MI Mile CY Cubic Yard

CY/MI Cubic Yard per Mile EA Each LS Lump Sum

B.1.3 Year Three: May 1, 2018 – April 30, 2019.

(DBA): Wage Rate Requirements (Construction) wage rates apply.

(SCA): Service Contract Act wages rates apply.

Item 1.3 – Hood Canal – Year Three (May 1, 2018 – April 30, 2019)

Sub-Item No.

Description Estimated

Commercial Source (SCA)

Excavation less than 100 C.Y.

120 LF $ $

833(2) Culvert Replacement, 24” Contractor Furnished (DBA) Excavation less than 200 C.Y.

120 LF $ $

833(3) Culvert Replacement, 36”

20 EA $ $

851(6) Logging Out (ML 2) (SCA)

DLM Double-Lane Mile MI Mile CY Cubic Yard

CY/MI Cubic Yard per Mile EA Each LS Lump Sum

B.2 Schedule of Items, Road Maintenance; Pacific.

B.2.1 BASE YEAR: May 1, 2016 – April 30, 2017.

The offeror must submit a price on all sub-items.

(DBA): Wage Rate Requirements (Construction) wage rates apply.

(SCA): Service Contract Act wages rates apply.

Item 2.1 – Pacific – Base (May 1, 2016 – April 30, 2017)

Sub-Item No.

Description Estimated

Commercial Source (SCA)

Excavation less than 100 C.Y.

833(2) Culvert Replacement, 24”

Excavation less than 200 C.Y.

833(3) Culvert Replacement, 36”

Contractor Furnished (DBA)

851(6) Logging Out (ML 2) (SCA)

851(7) Logging Out (ML 2) (SCA) 20 EA $ $

DLM Double-Lane Mile

MI Mile CY Cubic Yard

CY/MI Cubic Yard per Mile EA Each LS Lump Sum

B.2.2 Year Two: May 1, 2017 – April 30, 2018.

(DBA): Wage Rate Requirements (Construction) wage rates apply.

(SCA): Service Contract Act wages rates apply.

Item 2.2 – Pacific – Year Two (May 1, 2017 – April 30, 2018)

Sub-Item No.

Description Estimated

Commercial Source (SCA)

Excavation less than 100 C.Y.

120 LF $ $

833(2) Culvert Replacement, 24” Contractor Furnished (DBA) Excavation less than 200 C.Y.

120 LF $ $

833(3) Culvert Replacement, 36”

20 EA $ $

851(6) Logging Out (ML 2) (SCA)

DLM Double-Lane Mile MI Mile CY Cubic Yard

CY/MI Cubic Yard per Mile EA Each LS Lump Sum

B.2.3 Year Three: May 1, 2018 – April 30, 2019.

(DBA): Wage Rate Requirements (Construction) wage rates apply.

(SCA): Service Contract Act wages rates apply.

Item 2.3 – Pacific – Year Three (May 1, 2018 – April 30, 2019)

Sub-Item No.

Description Estimated

Commercial Source (SCA)

Excavation less than 100 C.Y.

120 LF $ $

833(2) Culvert Replacement, 24” Contractor Furnished (DBA) Excavation less than 200 C.Y.

120 LF $ $

833(3) Culvert Replacement, 36”

20 EA $ $

851(6) Logging Out (ML 2) (SCA)

DLM Double-Lane Mile MI Mile CY Cubic Yard

CY/MI Cubic Yard per Mile EA Each LS Lump Sum

B.2 Minimum and Maximum Contract Amounts (AGAR 452.216-73) (FEB 1988)

During the effective period of a contract resulting from this solicitation, the Government shall place orders totaling a minimum of $5,000 on each contract awarded, but not in excess of $4,999,000 in total for all contracts combined.

B.3 Authorized Ordering Individuals

Any Contracting Officer in the Pacific Northwest Region may issue task orders, within their procurement warrant authority, under this contract.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Scope of Contract

A. This solicitation and any resulting contract(s) are for maintenance of Forest Service roads on the Olympic National Forest.

B. The Contractor shall furnish the necessary personnel, material, equipment, facilities, supervision, transportation, operating supplies, and incidentals to perform the ordered tasks.

C. Road maintenance includes services, such as: grading; ditch cleaning; cleaning culverts; minor culvert and drainage repair; slash busting; and mowing. Road maintenance includes construction activities, such as: replacing culverts; patching asphalt; major slump/slide removal; bridge maintenance; and aggregate surfacing.

D. The estimated quantities stated in the Schedule of Items is the average annual volume of work expected under this contract. The actual volume of work will depend upon available funding, weather, and road conditions.

E. The Forest Service may order specific equipment, with operator, on a per hour basis for: (1) opening a forest road that has become overgrown with brush and trees; or (2) clearing debris dams from culverts during storm events. In both cases, at the time of placing the task order it is not possible for the Forest Service, or the Contractor, to estimate accurately the extent or duration of the work, or anticipate the cost of performance with any reasonable degree of confidence. Therefore, the Contractor shall provide the ordered equipment, with operator, to perform tasks identified by the Forest Service. The Contractor will be compensated at the hourly rates in the Schedule of Items, in accordance with the Time &

Material clauses in this contract.

F. District maps are available at the Olympic National Forest in Olympia (Supervisor’s

Office), the Hood Canal District office in Quilcene, or the Pacific Ranger District office in Quinault, during normal business hours. Maps can also be purchased online at http://www.fs.fed.us/r6/olympic/. Electronic maps are available at http://www.fs.fed.us/r6/olympic/aboutonf/atm_web/atm_maps.htm

C.2 Furnishing of Material and Equipment

A. Unless otherwise stated in the Supplemental Specifications, the contractor shall furnish all material and equipment required for performance of the contract. All material and equipment shall comply with the specifications. The only materials to be supplied by the government will be: permanent signs and traffic barricades to close damaged roads.

B. The Contractor shall furnish and deliver the material and equipment to the work site in such a manner that their quality and fitness for the work is preserved.

http://www.fs.fed.us/r6/olympic/

C. The Contractor shall start work when directed within three calendar days from the date of the work order.

D. The Contractor shall be responsible for furnishing warning devices and complying with the safety standards and traffic management procedures as specified in Section 808 of this contract.

C.3 Coordination of Specifications

A. Relationship between the Supplemental Specifications and Region Six Standard Specifications

The Supplemental Specifications for this project refine, revise, and add to the requirements stated in the Forest Service, Pacific Northwest Region, Standard Specifications for

Maintenance of Roads contained in the contract. The Supplemental Specifications and the Standard Specifications must be read as a whole to gain a full understanding of the work required. In the case of discrepancies, however, between these specifications, the

Supplemental Specifications will take precedence over the Standard Specifications.

C.4 Supplemental Specifications

The Supplemental Specifications correspond to the "800" series Standard Specifications and are included with the Standard Specifications

C.5 Definitions, Abbreviations, and Quantity Measurement Terms

A. Definitions - Certain specifications are common to contract and timber sale requirements. Where ever in these specifications, or in other contract documents, the following terms or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

Base Course - The layer or layers of specified or selected material of designed thickness placed on a sub-base or a subgrade to support a surface course. (See Illustration of Road

Structure Terms.)

Berm - A curb or dike which controls roadway runoff water. Berms commonly parallel road centerline. (See Illustration of Road Structure Terms.)

Channel - A natural waterway leading into or away from a culvert or bridge.

Contract Modification - A bilateral modification is a written agreement between the Government and the Contractor, documenting a negotiated equitable adjustment resulting from the issuance of a Change Order, or to reflect other agreements modifying the terms of the contract.

Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract.

Culvert - Any structure which provides a passageway, drain, or waterway under a road or embankment.

Cross Ditch - A shallow ditch placed across the roadbed to remove water from the roadbed surface which can be driven across by full size pickups or by other high clearance vehicles;

usually placed diagonally to centerline. (See drawings if applicable.)

Lead-off ditch - A specific type of man-made ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.

Ditch - A relatively long narrow excavation placed to collect or disperse water.

Ditch Dam – Constructed barrier which channels water flowing in a ditch thru a culvert inlet and prevents the water flow from continuing down the ditch and bypassing the culvert inlet.

Drainage dip - A drainage structure which was previously constructed within the roadbed surface to form a uniform depression which allows routine passage of standard passenger cars while diverting water from the traveled way. (See drawings if applicable).

Drainage ditch - A specific type of furrow ditch located parallel to and abutting the roadbed.

(See Illustration of Road Structure Terms.)

Drainage structure - A general term denoting any man made device placed to control water movements along, under or across the roadway. Includes ditches, culverts, bridges, etc.

Drawings - Depictions detailing maintenance contemplated including all road listing diagrams, maps, and performance schedules included in the contract.

Equipment - All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.

Excess Material - Material from the roadway excess to that needed for maintenance of roadway.

Foreslope - The slope of the ditch section nearest to the traveled way. (See Illustration of Road Structure Terms.)

Furrow ditch - Any ditch which nominally parallels the road centerline and diverts water from natural flow patterns to protect road slopes, roadbed, or downslope areas. Furrow ditches may be located within the roadway or roadside, but as used in this contract excludes drainage ditches.

Grade - The trace of vertical plane, as shown on the drawings, intersecting the top surface of the road.

Materials - Any substance specified for use in the performance of the work.

Measurement - Method of determining and expressing the quantities of work

Nominal dimensions or Weights - The numerical values shown on the drawings or in the specifications as measurements for the work.

Order - A written order by the Government directing fulfillment of work requirements under the terms of the contract

Original Contract Quantities - Those estimated quantities shown in the Schedule of Items as awarded.

Patching - Minor repairs incidental to recurring maintenance which is not substantial in nature.

Paved Surface or Pavement - Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.

Reasonably Close Conformity - Means compliance with customary maintenance tolerances where working tolerances are not specified.

Right-of-Way - A general term denoting land, property, or interest therein acquired for or devoted to a road.

Roadbed - The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade. (See Illustration of Road Structure

Terms.)

Road Listing - A listing of road locations and any established work priorities included in the contract as a drawing to indicate current estimates of contract timing; subject to revision in accordance with Contract Section F in developing the work schedule.

Road Maintenance Levels Definition as used in this Contract:

Maintenance Level 4 & 5: Roads with a moderate to high degree of user comfort and convenience. These roads receive maintenance on a routine basis, normally with brushing done yearly or biyearly.

Maintenance Level 3: Roads maintained for use by a prudent driver in a passenger car.

These roads generally receive maintenance on a routine basis, normally with brushing done every 3 to 4 years.

Maintenance Level 2: Roads maintained for use by high clearance vehicles. These roads generally receive only drainage related maintenance on a routine basis, and usually getting relegated to the lowest priority for brushing. Many have become mostly brushed in.

Roadside - See Illustration of Road Structure Terms

Shoulder - The portion of the roadway contiguous with the traveled way for the accommodation of stopped vehicles, for emergency use, and for lateral support of pavement structure. As used in this contract, the term is restricted to roads having an asphalt surface.

(See Illustration of Road Structure Terms).

Slide - A concentrated deposit of materials from above or on the backslope extending onto the traveled way or shoulders, whether caused by mass land movements or accumulated raveling.

Slump - A localized portion of the roadbed which has slipped or otherwise become lower than the adjacent roadbed and constitutes a hazard to traffic.

Supplemental Specifications - Specifications which detail conditions and requirements peculiar to the individual project.

Standard Specifications - Broadly-used (for instance throughout the Pacific Northwest

Region of the Forest Service) specifications for specific divisions of the work, such as:

Blading, Paved Surface Cleaning, Ditch Maintenance, etc.

Subgrade - Top surface of roadbed upon which sub-base, base course, or surface course was constructed. (See Illustration of Road Structure Terms.)

Surface Course - The top layer of a pavement structure, sometimes called the wearing course, usually designed to resist skidding, traffic abrasion, and the disintegrating effects of climate.

(See Illustration of Road Maintenance Terms.)

Traveled Way - The portion of the roadway for the movement of vehicles, exclusive of shoulders on asphalt paved roads. For purpose of this contract, traveled way includes turnouts and curve widening. (See Illustration of Road Structure Terms.)

Turnouts - A short auxiliary lane on a one lane road provided for passage of meeting vehicles.

Unsuitable Material - Material removed during maintenance which must be disposed of in designated locations. Examples - clay, serpentine, or other unstable material or material with substantial amounts of vegetation or other objectionable matter.

Waterbar - A deeper type drainage ditch which is intended for passage of high clearance vehicles only.

C.6 Illustration of Road Maintenance Terms – Drawing 801-1

Drawing 801-1, attached below, illustrates some of the terms defined above.

R ig h t o f

W a y

R o a d s id e R o a d s id e

C le a ri n g W id th

R o a d w a y

C le a ri n g

L im it X

Y

G ro u n d

L in e

T ra v e le d

W a y

C L B e rm

S u rf a c e

C o u rs e

B a s e

C o u rs e

F ill

S lo p e

B a c k S lo p e

D ra in a g e D itc h

G ro u n d

L in e

S u b g ra d e

R o a d B e d

S h a p e s a n d d im e n s io n s w ill v a ry t o f it l o c a l c o n d iti o n s

S e e d ra w in g s f o r ty p ic a l s e c tio n s

X a n d Y d e n o te c le a ri n g o u ts id e o f ro a d w a y

N o te

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

C.7 Abbreviations

Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

1. AASHTO - American Association of State Highway and Transportation Officials.

2. CS - Commercial Standard issued by U.S. Dept. of Commerce.

3. EPA - Environmental Protection Agency.

4. FAR - Federal Acquisition Regulation.

5. FED SPEC - Federal Specifications.

6. FSS - Federal Specification and Standards.

7. MSHA - Mine Safety Health Administration.

8. MUTCD - Manual of Uniform Traffic Control Devices.

9. NBS - National Bureau of Standards.

10. OSHA - Occupational Safety and Health Act.

11. PS - Product Standard issued by the U.S. Dept. of Commerce.

12. UL - Underwriter's Laboratories, Inc.

C.8 Quantity Measurement Terms

A. Measurement under the contract shall be according to standard measure.

B. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.

C. All items measured by the mile will be parallel to its longitudinal centerline, unless otherwise shown on the drawings.

D. A station when used as a definition of term or measurement will be 100 feet.

E. Miles shall, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or distance measuring device operated on the traveled way at or parallel to road centerline.

F. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements. Materials measured by the cubic yard in hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.

G. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes.

H. Volume of bituminous products will be measured at 15.6 degrees C, using

ASTM D-1250 for asphalt. Emulsified asphalt shall be measured at 15.6 degrees C, or by converting the volume at another temperature to volume at 15.6 degrees C by means of the following formula:

L at T degrees C

L at 15.6 degrees C = ----------------------------------------------------- 1 + 0.00045 (T degrees C - 15.6 degrees C) where:

T degrees C = temperature of the emulsified asphalt at the time the volume is measured.

I. The term "Lump Sum" when used in the Schedule of Items will mean the complete unit as required by or described in the contract.

J. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications and drawings.

C.9 Order of Precedence

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(a) The Schedule (excluding the specifications);

(b) Representations and other instructions;

(c) Contract clauses;

(d) Other documents, exhibits, and attachments (Supplemental Specifications & Drawings); and

(e) The specifications.

C.10 Technical Specifications for Maintenance of Roads

The specifications are numbered in the "800" series codes. Only those sections which could be applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.

C.11 BioPreferred Program Requirements

The Contractor shall comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal

Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g.

biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

The following is an example list of products that may be used in this contract for operations and maintenance for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Hydraulic fluids Penetrating lubricants Concrete and asphalt release fluids Absorbents

Diesel fuel additives Greases Dust suppressants 2-cycle engine oil

Wood and concrete sealers Fertilizers Roof coatings Water tank coatings Adhesive and mastic removers Cleaners

Sorbents Floor finish Floor stripper Composite panels

Insulating foam Sealers Carpet Metalworking fluids Graffiti and grease removers Stain removers

Degreasers De-icers

Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content.

In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other biobased products.

The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of the contract.

Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.

The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts.

Within thirty (30) days of contract award, the Contractor shall submit an Operations and Maintenance Plan. This submittal shall be approved by the COR in writing. The

Contractor shall not commence work until this submittal is approved by the COR in writing.

The Plan must be reviewed and updated annually, and as required by the COR. The Plan must contain and define the following elements:

1. The Contractor’s written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.

2. Detail on how the Contractor intends to keep abreast of the increasing availability of biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.

3. Proposed biobased operations and maintenance products which must be selected in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.

NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.

The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.

The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract. The data will be submitted to the COR quarterly.

A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product. Therefore we will look for a Contractor who will 1) demonstrate products, and 2) when selected, offer any necessary training to all of the construction staff and 3) be available with technical assistance to trouble shoot problems.

C.12 Applicability of the Service Contract Act (SCA) and Wage Rate

Requirements (Construction) (DBA)

The Contractor is responsible for compliance with the Service Contract Act (SCA) and

Wage Rate Requirements (Construction), formerly known as the Davis-Bacon Act

(DBA). The Department of Labor (DOL) is responsible for enforcement of the SCA and

Wage Rate Requirements (Construction). Contractor shall contact the DOL to resolve any questions concerning the applicability of the SCA or Wage Rate Requirements (Construction). The DOL has provided the Forest Service with the following guidelines concerning road maintenance activities.

The SCA applies to the following typical activities on, or along, a paved road:

Brushing and mowing;

Ditch cleaning and brushing;

Sign, cattleguard, gabion, and guardrail repair;

Minor patching performed in conjunction with normal maintenance activities;

Cleaning culverts;

Minor slump/slide removal;

Litter cleanup; and Minor culvert and drainage repair.

The SCA applies to the following typical activities on, or along, a unpaved road:

The above noted activities;

Grading;

Rock raking; and

Removal of oversized material.

The Wage Rate Requirements (Construction) (DBA) applies to the following typical activities:

Patching of asphalt or other pavements;

Replacing culverts;

Striping pavements;

Rehabilitation/recycling pavements;

Fog or chip sealing;

Major slump/slide removal;

Bridge maintenance; and

Aggregate surfacing, except minor spot surfacing.

C.13 Statement of Work/Specifications (AGAR 452.211-72) (FEB 1988)

The Contractor shall furnish the necessary personnel, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.14 Attachments to Statements of Work/Specifications (AGAR 452.211-73)

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-4 Inspection of Services--Fixed-Price (AUG 1996)

The following clause applies to all ordered construction tasks:

52.246-12 Inspection of Construction (AUG 1996)

The following clause applies to all project work paid for by the hour:

52.246-6 Inspection – Time-and-Material Labor-Hour (MAY 2001)

E-2 Inspection and Acceptance (AGAR 452.246-70) (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at the project site.

E-3 Inspection and Testing Performed By Government

The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.

E-4 Conformity with Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

http://www.arnet.gov/far/

E-5 Constructive Acceptance for Computing Late Interest Penalty

FAR 52.232-25, Prompt Payment (a) (5) (i), is deleted and replaced by the following:

(a) Invoice payments --

(5) Computing penalty amount. The Government will compute the interest penalty in accordance with Office of Management and Budget prompt payment regulations at 5 CFR Part 1315.

(i) For the sole purpose of computing an interest penalty that might be due the

Contractor, Government acceptance is deemed to occur constructively on the 14th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

SECTION F--DELIVERIES OR PERFORMANCE

F.1 Clauses Incorporated by Reference (FAR 52.252-2) (FEB 1998) effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

52.242-14 Suspension of Work (APR 1984)

52.242-15 Stop Work Order (AUG 1989) 52.242-17 Government Delay of Work (APR 1984)

F.2 Commencement, Prosecution, and Completion of Work (FAR 52.211-10)(APR 1984)

The Contractor shall be required to (a) commence work under this contract within the number of calendar days or date specified in the task order calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date specified in the task order. The time stated for completion shall include final cleanup of the premises.

F.3 Period of Performance (AGAR 452.211-74) (FEB 1988)

The period of performance of this contract is from MAY 01, 2016, through

APRIL 30, 2019.

F.4 Effective Period of the Contract (AGAR 452.211-75) (FEB 1988)

The effective period of this contract is from date of contract award and ends on the date following the date of final payment under this contract.

This is the “effective period” referenced in Clause FAR 52.216-22 Indefinite Quantity (OCT 1995).

http://www.arnet.gov/far/

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 Government-Furnished Property

The Government may provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government

Property" FAR clause contained elsewhere in the contract.

Materials to be supplied by the government will be:

Permanent signs; and Traffic barricades.

Materials which may be supplied by the government include:

Crushed Rock; and Rip Rap – Class 5.

If the Government provides materials, the materials will be identified in the task order.

G.2 Post Award Conference (AGAR 452.215-73) (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 15 days after the date of contract award. The conference will be held at Forest

Supervisor’s Office, Olympic National Forest.

G-3 Contract Release

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information:

"In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations: ______________"

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 Accident Prevention (FAR 52.236-13) (NOV 1991)

(a) The Contractor shall provide and maintain work environments and procedures which will—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract.

(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR

Part 1926 and 29 CFR Part 1910; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the

Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.

H.2 Use of Premises (AGAR 452.236-72) (NOV 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer.

A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) National Forest Road Rules applicable to the Olympic National Forest are incorporated by reference. Copies are available upon request.

H.3 Archaeological or Historic Sites (AGAR 452.236-73) (FEB 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

H.4 Control of Erosion, Sedimentation, and Pollution (AGAR 452.236-74) (NOV 1996)

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

H.5 Rights In and Use in Materials

The Contractor, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand, or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace, without additional compensation, sufficient materials equal to the portion of the work, which was originally contemplated to be constructed with such material.

H.6 Prosecution of Work

a. Work shall be scheduled to provide completion of segments on a daily basis unless otherwise herein provided.

b. A monthly Work Schedule shall be prepared by the Contractor based on work priorities provided in the contract, unless superseded by the Government in advance of work by Work Order. A copy of the Work Schedule shall be provided to the Government by the agreed day of each month.

c. The Government may require the Contractor to finish the portion in progress before additional work is started on any additional portion.

H.7 Control Stakes

The Contractor is responsible for the preservation of existing benchmarks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds a missing stake he will notify the Government who will replace the missing stake within two (2) days. Flagging not associated with stakes can be ignored.

H.8 Landscape Preservation

The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:

a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the

Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents. Unless otherwise provided in this contract, the Contractor shall gather rock, which falls outside the roadway, due to contract operations and dispose of it as directed by the Government.

b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.

H.9 Control of Noxious Weeds – Cleaning of Equipment

To prevent the introduction and control the spread of seeds of noxious weeds onto and around the Olympic National Forest, the Contractor shall clean all equipment, except transports, of soil, seeds, vegetative matter, and any other debris that could contain seeds before moving the equipment onto the Olympic National Forest. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor clean all equipment of weed seeds prior to moving to another work area.

Prior to transporting equipment on to the Olympic National Forest, Contractor shall repair all equipment hydraulic, lubricant, and fuel leaks.

The Contractor may use whatever cleaning methods necessary to ensure compliance with the terms of this clause. The Contractor shall notify the Forest Service, prior to moving any equipment on to the Olympic National Forest that the equipment has been cleaned and is available for inspection. Notification shall include identifying the location of the equipment’s recent operations.

The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, “equipment” includes all motorized equipment used in road maintenance, except transports. The following equipment is excluded from the requirements of this clause: log trucks; chip vans; pickup trucks & other vehicles used to transport personnel.

H.10 Employment of Eligible Workers (FSAR 4G52.222-701) (DEC 1999)

Section 274A of the Immigration and Nationality Act (8 USC 1324a) makes it unlawful for an employer to hire unauthorized aliens.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .