Solicitation_ERFO_2007_Rd_2341_MP_18_8.doc

DOC document 2 MB Posted

Attached to
ERFO 2007 Road 2341 MP 18. 8 Federal contract opportunity
Solicitation number
AG-05G2-S-09-0048
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Request for Proposal

View the file

Other files for this federal contract opportunity

Other files attached to ERFO 2007 Road 2341 MP 18. 8, newest first.
File Type Posted
ERFOCombinedDrawings.pdf PDF
MOU attachment.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-05G2-S-09-0048

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

JUN 09, 2009

PAGE OF PAGES

1 129

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

Western Washington Acquisition Group

Olympic National Forest

1835 Black Lake Blvd., Suite A

Olympia, WA 98512 Western Washington Acquisition Group

Olympic National Forest

1835 Black Lake Blvd., Suite A

Olympia, WA 98512

9. FOR INFORMATION

CALL:

A. NAME

Miley Sutherland B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(360) 956-2471

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

ERFO 2007 Road 2341 MP 18.8 Project Name: ERFO 2007 Road 2341 MP 18.8 Forest: OLYMPIC

Ranger District: HOOD CANAL County, Washington: MASON

FOR INFORMATION CALL: Guadalupe Cisneros (360) 956-2353

Price Range: Between $25,000 and $100,000.

This acquisition is set aside for HUBZone Small Business Concerns Small Business Concerns.

11. The Contractor shall begin performance within 30 calendar days and complete it within 100 calendar days after receiving

FORMCHECKBOX

award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See Clause F.2 .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

See Clause I.4

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:30 p.m. local time JULY 08, 2009. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 Road 2341 M.P. 18.8 NOTE: If Offer does not intend to charge for an Item, a price of "0" or "NO COST" should be shown.

ITEM
DESCRIPTION
MEASURE
QUANTITY
UNIT PRICE
TOTAL
15101
Mobilization
Lump Sum
1
$_________
$_________
15201
Construction survey and staking, method II, tolerance C
Lump Sum
1
$_________
$_________
15206
Retaining wall survey and staking, tolerance B
Lump Sum
1
$_________
$_________
15401
Contractor testing
Lump Sum
1
$_________
$_________
15713
Soil Erosion & Pollution Control
Lump Sum
1
$_________
$_________
20301
Removal culverts, disposing of materials (a)
Each
1
$_________
$_________
20401
Roadway excavation, compaction method B, finishing method B
Cubic Yard
193
$_________
$_________
25101
Placed riprap, class 2
Cubic Yard
10.5
$_________
$_________
25501
Mechanically stabilized earth wall
Square Yard
83
$_________
$_________
32404
Aggregate base, grading 1- inch minus, compaction method A
Lump Sum
1
$_________
$_________
60201
24 inch pipe culvert
Foot
60
$_________
$_________
60209
Elbow 24 inch
Each
1
$_________
$_________
60505
Geocomposite sheet drain system
Square Yard
133
$_________
$_________
62528
Seeding, Fertilizing, and Mulching, Dry Method
Lump Sum
1
$_________
$_________
63312
Posts, steel
Each
3
$_________
$_________
63306
Object markers, Type 2
Each
6
$_________
$_________

Road 2341000 M.P. 18.8

Total
$_________

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Statement of Work

The project consists of the following major items of work:

Reconstruction of storm damaged Forest Road No. 2341. This includes, but is not limited to the following: mobilization, survey, earth work, installation of mechanically stabilized earth wall, installation of 24 inch culvert with down drain, soil erosion and pollution control, seeding and mulching.

C.2 Project Location

This project is located on the Hood Canal Ranger District of the Olympic National Forest, Section 35, Township 22 North, Range 6 West W.M., near, Shelton, Washington. It may be reached by traveling east from Shelton on West Shelton Matlock Road for approximately 13.8 miles. Turn right onto the W. Beeville Rd. Follow the W. Beeville Rd. for approximately 4.2 miles, to junction with FSR 2341. Turn left onto the FS Road 2341 and follow for approximately 9.3 miles to the project location.

(a) Existing Conditions:

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

(b) Weather Conditions:

Weather conditions suitable for ground excavation are normally expected in May through October. Rain, sometimes heavy, is normal throughout the winter, with periods of light to moderate snowfall. Night freezing is common throughout the winter and several periods of weeklong freezes are likely.

(c) Operating Season: Inclusive dates during which operations are permissible.

Activity
Start Date
End Date
Restrictions
Construction Season
07/01/2009
08/31/2009
Hand Tools
07/15
08/31
Power Tools / 2 Chainsaws
07/15
08/31
Machinery / Car Traffic
07/15
08/31
Heavy Machinery
07/15
08/31

Time of Day Restriction

Notes – Noise Limitation:

· Power Tools/2 Chainsaws - any power tools with noise output is no more than two operating chainsaws.

· Machinery/Car Traffic - any machinery with noise output is limited to normal vehicular traffic at site (e.g. small excavator/backhoe).

· Helicopter/Heavy Machinery - any machinery with noise output is greater than normal vehicular traffic at site.

(d) Pre-bid Conference:

Date Time Location

None scheduled at this time.

C.3 Availability of Specifications or Product Descriptions not Listed in the GSA Index of federal Specifications and Standards (FAR 52.210-3) (APR 1984)

Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:

Specification

Address

STANDARD SPECIFICATIONS

Western Federal Lands Highway Division

FOR CONSTRUCTION OF

http://www.wfl.fhwa.dot.gov/

ROADS AND BRIDGES

ON

FEDERAL HIGHWAY PROJECTS

FP-03 U.S. Customary Units

ASTM Standards

American Society for Testing and Materials

100 Bar Harbor Drive

West Conshohocken, PA 19428

(610) 832-9585 http://www.astm.org

AASHTO Standards

American Association of State

Highway and Transportation Officials

444 North Capitol Street, NW

Suite 249

Washington, D.C., 20001 http://www.aashto.org

C.4 Applicable Speciifications and Material Certifications

(a) Applicable Specifications:

References to Standard Specifications in the contract refer to the STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS 2003 (U.S. Customary Units).

Sections 100 through 149, and other Standard Specifications, listed on the Specification List, are included in this solicitation by reference only. Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.

The Supplemental Specifications are also given on the Specification List but are physically attached in Section J. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.

(b) Product Substitution:

Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award

(c) Shop Drawings:

The following shop drawings shall be submitted on this project (4 sets unless noted):

Title
Referenced by Specification No.
Time for Gov’t Approval After Submittal
Mechanically-Stabilized Earth Wall
255
15 days

(e) Submittals:

Submittals are required by the following specifications:

157 Erosion Control Plan

204 Pipe Removal disposal receipt required.

Work requiring submittals shall not begin until submittals have been approved.

Submittals shall include:

Date and Revision Dates.

Project Name and Contract Number.

Names of Contractor, Subcontractor, Supplier, and Manufacturers.

Field Dimensions and Relation to Adjacent Structures.

Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.

Samples:

Physical examples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.

Manufacturer's requirements:

Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.

Approval or Rejection Time Allowance:

Submittals will be reviewed and either approved or rejected within 14 calendar days of their receipt by the Contracting Officer or COR.

(f) Material Certifications and Testing Reports:

Brief Title
Basic Reference Specification
Detailed Regulations Specification
Copies To Submit
Time for Government Approval After Total Submittal
CONTRACTOR QUALITY CONTROL
153
153.02
3
7
EROSION CONTROL PLAN
157
157.03
3
7
WEATHER-CAUSED SUPENSION OF WORK
H.3
3
7
SEED
625
713.04
3
7
STRAW (WEED FREE)
625
713.05
3
7
Mechanically-Stabilized Earth Wall
255
720.01, 704.10, 704.04
3
Geocomposite sheet drain system
605
714.02

706.08

714.01

Culvert pipe
602
602.02
3
7
Sign Post
633
633.02
3
7
Object markers
633
633.02
3
7

· Forest Service will inspect backfill material for suitability.

C.5 Price Range The Government's estimate is between $25,000 and $100,000.

C.6 Statement of Work/Specifications (AGAR 452.211-72)(FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.7 Attachments to Statement of Work/Specifications (AGAR 452.211-73)(FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-1 Contractor Inspection Requirements (APR 1984)

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F.2 Commencement, Prosecution, and Completion of Work (FAR 52.211-10)(APR 1984) The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than AUGUST 31, 2009. The time stated for completion shall include final cleanup of the premises.

F.3 Maximum Workweek – Construction Schedule (AGAR 452.236-75)(NOV 1996) Within 30 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 Post Award Conference (AGAR 452.215-73)(NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 Emergency Control (USDA 452.236-77)(JUL 1985)

(a) Maintenance of Existing Facilities:

The Contractor shall conduct his operations to minimize disruptions to the Government employees and public using the existing facilities.

H.2 Landscape Preservation

(a) Erosion Control Measures:

i. Contractor shall minimize sediment laden water from entering the stream. Install check dams, sediment fences and other measures as necessary to minimize the entry of silt-laden water into streams or other water bodies.

ii. Dewater any live streams prior to culvert removal or other in stream work.

iii. Seed and mulch all disturbed areas within 7 days of completing work at site.

(b) Landscape Preservation

i. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.

ii. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

iii. Pollutants such as fuels, lubricants, bitumen’s, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live steams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

iv Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

v Prevention of Oil Spills - If the Contractor maintains storage facilities for oil or oil products on project Area, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

vi If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

vii All activities will follow the provisions of the forest service hydraulics project M.O.U. A copy of the M.O.U. will be onsite.

viii Forest Service will be notified 72 hrs in advance of operations in live streams channels.

(c) Cleaning of Equipment Cleaning of Off-Road Equipment used by the Contractor for contract work shall be conducted outside the boundary of any National Forest Service land prior to moving each piece of equipment onto the project. The Contractor shall notify the Forest Service prior to moving each piece of equipment onto the project. Upon request from the Forest Service, arrangement will be made for Forest Service to inspect each piece of equipment prior to it being placed into service. The Contractor shall use cleaning methods necessary to ensure equipment is free of all attached mud, dirt, and plant parts. If noxious weeds are present at a project site, cleaning may also be required before moving between locations within the same project. These measures will assist to prevent the introduction/spread of the seeds of noxious weeds onto National Forest land. The Contractor shall certify in writing, compliance with the above requirements. "Off-road Equipment" includes all machinery other than log truck, chip vans, pickup trucks or vehicles used to transport personnel on a daily basis.

(d) Plan for Weather-Caused Suspensions of Work The Contractor shall prepare a plan for weather-caused suspensions of work to ensure preservation of resources affected on the work site or sites. The plans shall be be consistent with the requirements in the LANDSCAPE PRESERVATION clause contained in this contract. The plan shall be submitted in writing to the Contracting Officer for review and, if acceptable, approval not later than two weeks prior to the start of on-site work. The plan shall distinguish between short-term shut-downs caused by intermittent weather activity and longer-term shut-downs associated with the advent of winter. If rejected by the Contracting Officer, the Contractor shall revise the plan and re-submit it for consideration within three working days of verbal or written notification by the Contracting Officer. The Contractor shall take action consistent with the plan before suspending activity on the site(s). Acceptance of the plan by the Contracting Officer in no way waives any of the requirements of the LANDSCAPE PRESERVATION clause.

H.3 Industrial Fire Precaution Levels

The Contractor shall comply with the operations restrictions in accordance with the Washington State Industrial Fire Precaution Level (IFPL) system. The IFPL system is used to help prevent wildfires by regulating work in the woods during the summer fire season.

The US Forest Service and the Washington DNR use the four-level industrial regulation system.

The Precaution Levels are:

Level I
Closed Fire Season
Fire equipment and fire watch service is required.
Level II
Partial Hoot Owl
Limits certain activities to between the hours of 8 p.m. and 1 p.m.
Level III
Partial Shutdown
Prohibits some activities altogether and limits other activities to between the hours of 8 p.m. and 1 p.m.
Level IV
General Shutdown
All operations prohibited

Operation: Power Saws

Precaution Level
Landing
Tractor/Skidder
Other Woods Saws
I. Closed Season
Fire Watch
Fire Watch
Fire Watch
II. Partial Hoot Owl
Fire Watch
Hoot Owl
Hoot Owl
III. Partial Shutdown
Hoot Owl
Hoot Owl
Prohibited
IV. General Shutdown
Prohibited
Prohibited
Prohibited

Other Operations

Precaution Level
Loading
Blasting
Welding
I. Closed Season
Fire Watch
Fire Watch
Fire Watch
II. Partial Hoot Owl
Fire Watch
Hoot Owl
Hoot Owl
III. Partial Shutdown
Hoot Owl
Hoot Owl
Hoot Owl
IV. General Shutdown
Prohibited
Prohibited
Prohibited

This project is located in one of the following zones:

652NE

Northern portion of the Hood Canal RD

652SE

Southern portion of the Hood Canal RD

652NW

Northern portion of the Pacific RD

652SW

Southern portion of the Pacific RD

The Fire Precaution Class can be found at: http://www2.wadnr.gov/IFPL/ifpltoday.html or by calling 1-800-527-3305.

H.4 Use of Premises

(a) Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman.

(b) A storage site will be permitted at a designated site within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.

(c) When the Contractor's operations require a temporary electrical power distribution system, the system shall comply with the National Electrical Code, applicable local codes and utility regulations. The Contractor shall make all arrangements with the serving utility for temporary power and shall pay the serving utility for all applicable fees and power consumed.

(d) Potable water and sanitary facilities [are not] available for use during construction.

The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads designated below for performance of work under this contract.

Road No.
Road Termini
Authorizations, Restrictions or Requirements
Maintenance Required
2341000
ENTIRE LENGTH
NONE
NONE

Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained from the PACIFIC Ranger District.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008) 52.211-18 Variation in Estimated Quantity (APR 1984)

52.219-3 Notice of Total HUBZone Set-Aside (JAN 1999)

52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (FEB 1988)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998)

52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003)

52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.224-1 Privacy Act Notification (APR 1984)

52.224-2 Privacy Act (APR 1984)

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (FEB 1992) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6 Subcontracts for Commercial Items (DEC 2008)

52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

I.2 Central Contractor Registration (FAR 52.204-7)(APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

I.3 Buy American Act-Construction Materials (FAR 52.225-9)(FEB 2009)

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to the construction material or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate ``none'']

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description
Unit of measure
Quantity
Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] I.4 Alternative Payment Protections (FAR 52.228-13)(JUL 2000)

(a) The Contractor shall submit one of the following payment protections

Payment bond;

Irrevocable Letter of Credit; or

Tripartite Escrow Agreement.

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 15 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

I.5 Authorized Deviations in Clauses (FAR 52.252-6)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any [insert regulation name] (48 CFR _____) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

I.6 Alternative Forms of Security (AGAR 452.228-70)(NOV 1996)

If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.

I.7 Order of Precedence--Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 Definitions and Acronyms

J.2 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03, U.S. Customary Units

J.3 Supplemental Specifications

J.4 Wage Determination

J.5 Fire Plan

J.6 Offeror’s Qualifications Statement J.7 Washington State, Dept. of Fish & Wildlife, Memorandum of Understanding (Separate Attachment)

Project Drawings (Separate Attachment)

J.1 Definitions and Acronyms Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:

––-–––– DEFINITIONS –––––––

Building Limits
A line 5 feet outside foundations of the structure.
Calendar Day
Every day shown on the calendar, Sundays and holidays included.
Change Order
A written order issued by the Contracting Officer, to the Contractor documenting modifications within the scope of the contract.
Contract Amendment
A bilateral written supplemental agreement between the Government and the Contractor.
Contract Time
The number of calendar days allowed by the contract for the completion of the work.
Contracting Officer’s Representative (COR)
The duly authorized representative of the Contracting Officer, responsible for on-site administration of the contract within the limits of specific written delegation of authority.
Contractor
The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Equipment
All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
Forest Supervisor
The person, or designated representative, responsible for administration of a National Forest.
Inspector
The Government authorized representative designated in writing by the COR responsible for detailed inspections of contract performance, within delegation of authority.
Materials
Any substances specified for use in the construction of the project and its appurtenances.
Notice of Non-Compliance
Written notice issued detailing specific area(s) of Non-Compliance with contract requirements.
Original Contract Quantities
Those quantities shown in the Schedule of Items.
Right-of-way
A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.
Schedule of Items
Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.
Specifications
A general term applied to all written directions and requirements pertaining to performance of the work.
Utility Services
Services such as electricity, gas, steam, water and sewerage.
Work Order
A written instruction directing the Contractor to fulfill contract requirements.

Reference to a specific standard or specification shall mean the latest edition or amendment in effect on date of invitation to bid.

––-–––– ACRONYMS –––––––

AA
Aluminum Association
AASHTO
American Association of State Highway and Transportation Officials
ACI
American Concrete Institute
ADA
Americans With Disabilities Act
AGC
Associated General Contractors
AI
Asphalt Institute
AISC
American Institute of Steel Construction
AISI
American Iron and Steel Institute
AITC
American Institute of Timber Construction
ALSC
American Lumber Standards Committee
ANSI
American National Standards Institute
APA
American Plywood Association
API
American Petroleum Institute
ARTBA
American Road and Transportation Builders Association
ASHRAE
American Society of Heating, Refrigerating & Air Conditioning Engineers
ASME
American Society of Mechanical Engineers
ASTM
American Society for Testing and Material
ATCC
American Type Culture Collection
AWPA
American Wood Preservers Association
AWPB
American Wood Preservers Bureau
AWS
American Welding Society
AWWA
American Water Works Association
CFR
Code of Federal Regulations
CRSI
Concrete Reinforcing Steel Institute
CS
Commercial Standard issued by U.S. Department of Commerce
CSI
Construction Specifications Institute
DEMA
Diesel Engine Manufacturers Association
DOT
U.S. Department of Transportation
FAR
Federal Acquisition Regulations

FED. SPEC.

FS

Federal Specifications

FHWA
Federal Highway Administration
FLH
Federal Lands Highway (Federal Highway Administration)
FSS
Federal Specifications and Standards
GSA
General Services Administration
ICBO
International Conference of Building Officials
ISSA
International Slurry Surfacing Association
MIL
Military Specifications
MSHA
Mine Safety and Health Administration
MUTCD
Manual on Uniform Traffic Control Devices
NBFU
National Board of Fire Underwriters
NBS
National Bureau of Standards
NEMA
National Electrical Manufacturers Association
NESC
National Electrical Safety Code
NFPA (Fire)
National Fire Protection Association
NFPA (Forest)
National Forest Products Association
NWMA
National Woodwork Manufacturers Association
OSHA
Occupational Safety and Health Act
PCA
Portland Cement Association
PCI
Prestressed Concrete Institute
PS
Product Standard Issued by the U.S. Department of Commerce
PTI
Post-Tensioning Institute
RIS
Redwood Inspection Service
SAE
Society of Automotive Engineers
SF
Standard Form
SI
International System of Units
SMACNA
Sheet Metal & Air Conditioning Contractors National Association
SSPC
Steel Structures Painting Council
UBC
Uniform Building Code
UFC
Uniform Fire Code
UL
Underwriter’s Laboratories, Inc.
UMC
Uniform Mechanical Code
UPC
Uniform Plumbing Code
USASI
United States of America Standards Institute
WCLIB
West Coast Lumber Inspection Bureau
WWPAA
Western Wood Products Association
WWPI
Western Wood Preservation Institute

J.2 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03, U.S. Customary Units

STANDARD SPECIFICAIONS

FOR CONSTRUCTION OF

ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS

FP-03

US CUSTOMARY UNITS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .