Amendment_0002.pdf

PDF 142 KB Posted

Attached to
Barnaby Creek and South Sherman Creek Aggregate Placement
Solicitation number
AG-05G1-S-16-0016
Issued by

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Vicinity.pdf PDF
EstQty.pdf PDF
WA1_05202016.pdf PDF
16-0016_Barnaby_S_Sherman.pdf PDF
TYPRD.pdf PDF
FSSS.pdf PDF
BioPreferred_Product_Categories_June_2013.pdf PDF
Title.pdf PDF
Barnaby__Sherman_worklist.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 1

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0002 06/22/2016 804122

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service Colville National Forest 765 South Main Colville, WA 99114

Contracting Officer Colville National Forest 765 South Main Colville, WA 99114

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

AG-05G1-S-16-0016

Barnaby Creek and South Sherman Creek Aggregate Placement

X 9B. DATED (SEE ITEM 11)

5/27/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The purpose of this amendment is to replace specification 322 Minor Aggregate Courses. See next page. Proposals are now due on June 29, 2016 at 3:00 p.m. This amendment must be acknolwedged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Cathy VanAlyne

Contract Specialist

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY 6/22/2016

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 2

Pen and Ink Changes:

The attached specifications titled “322 Minor Aggregate Courses” replaces the one in the solicitation (reference page 17 of the specifications in the solicitation).

Proposals are now due June 29, 2016 at 3:00 p.m.

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 3

322 Minor Aggregate Courses

Description

322.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.

Surface aggregate grading is designated as shown in Table 703-3.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Screened aggregate grading is designated as shown in Table 703-16.

Material

322.02 Conform to the following Subsections:

Aggregate 703.05 Water 725.01

Construction Requirements

322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.

Request approval of the roadbed in writing before placing aggregate.

Develop, haul, and apply water in accordance to Section 170.

Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the Contracting Officer will determine the final values for the gradation and notify the Contractor in writing.

No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.

After processing on the road, remove all oversize material from the road and dispose of it as directed by the Contracting Officer.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320.

Establish stockpile sites at approved locations.

322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.

Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 4 according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Removed.

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Removed.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

Ensure that the compacted thickness is not consistently above or below the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.

Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.

322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 5

322.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04.

Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.

The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.

The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).

Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.

Measurement

322.09 Measure the Section 322 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure square yard width horizontally to include the top of aggregate width including designed widening.

Measure the square yard length horizontally along the centerline of the roadway.

If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.

Measure thickness perpendicular to the grade of the travelway.

Measure width perpendicular to the centerline.

Payment

322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 6

T ab le

-1

Sa m pl in g an d

T es tin g

R eq ui re m en ts

R ep or tin g T im e

B ef or e us in g in w or k h ou rs

Sp lit pl e

Y es

, w he n re qu es te d

“ “ “ Y es

Po in t o f

Sa m pl in g

So ur ce o f m at er ia l

Fr om w in dr ow o r ro ad be d af te r pr oc es si ng o r fro m a pp ro ve d cr us he r s am pl in g de vi ce pl in g Fr eq ue nc y pe r t yp e so ur ce o f m at er ia l pe r d ay t M et ho ds ec ifi ca tio ns

A

SH

TO

T

A A

SH

TO

T

SH

TO

T

ST

M D

A A

SH

TO

C at eg or y ha ra ct er is tic

LA

a br as io n

(c oa e)

So di um su lfa te so un dn es s l os s

(c oa rs e fi ne

D ur ab ili ty in de x

(c oa rs e fi ne

Fr ac tu re d fa ce s

Sa m pl e

T yp of cc ep ta nc e (S ub se ct io n)

M ea su re d an d te st ed fo r c on fo rm an

(1

.0

M ea su re d an d te on fo rm

.0

4) er ia l o r

Pr od uc t

A gg re ga te so ur ce q ua lit y

3.

Su bb as e, B as e, a nd S ur fa co se s

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 7 le

-1

(c on tin ue d) pl in g an d T es tin g R eq ui re m or tin g T im e

B ef or e us in g w or k

B ef or e pl ac in g ne xt la ye r

(1

M in im um o f 5 p oi nt s p er p ro ct pl e

Y es

, w he n re qu es te d t o f

Sa m pl in g

So ur ce o f m at er ia l

In -p la pl in g Fr eq ue nc y pe r t yp e an d so ur ce o f m at er ia l pe r da y

T es t M et ifi ca

SH

TO

T

SH

TO

0(1

SH

TO

T o th er a pp ro ve d pr oc ed eg or ra ct er oi st ur e-de ity et ho

D oi st ur e-de ity et ho

F

In -p la ce d en si ty oi st ur e co nt en t

T yp ep ta nc e (S ub se ct su re d an d te on fo rm

.0

4) er ia l o r

Pr od uc t

S ub ba se

, B as e, a nd S ur fa

Amendment 0002, AG-05G1-S-16-0016, Barnaby Creek and South Sherman Creek Aggregate Placement, Page 8 le

-2 pl in g an d

T es tin g

R eq ui re m or tin g T im e h ou pl e

Y t o f

Sa m pl in g

Fr om w in dr ow o r ro ad be d af te r pr oc es si ng o r fro m a pp ro ve d cr us he r s am pl in g de vi pl in g Fr eq ue nc y pe r da y

T es t M et ifi ca

SH

TO

eg or ra ct er pl e

T yp ep ta nc e (S ub se ct su re d an d te on fo rm

.0

M at er ia l o r

Pr od uc t

Sc re en ed

A gg re ga te

File details come from the government source that posted it. Updated .