AG04T0S160061Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Stewardship - Central Coast Meadow Maintenance and Habitat Restoration, Siuslaw National Forest
- Solicitation number
- AG-04T0-S-16-0061
About this file
Complete Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG04T0S160061ReturnPacket.pdf | ||
| AG04T0S160061DUIS.pdf | ||
| AG04T0S160061Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER AL ITEMS 1. REQUISITION NUMBER PAGE 1 OF 63
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 805514
2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICIATION ISSUE
DATE
AG-04T0-S-15-0061
DATE
6/16/2016
a. NAME b. TELEPHONE NUMBER(No collect calls)
8. OFFER DUE DATE/
7. FOR SOLICITATION Contracting Office: 541-750-7118 06/30/2016 4 p.m. PST
INFORMATION CALL: FAX: 541-750-7236
9. ISSUED BY CODE 10. THIS ACQUISITON IS
Siuslaw National Forest UNRESTRICTED OR SET ASIDE: 100 % FOR
3200 SW Jefferson Way SMALL BUSINESS EMERGING SMALL BUSINESS
Corvallis, OR 97331 HUBZONE SMALL
NAICS: 115310 BUSINESS
ATTN: CONTRACTING SERVICE-DISABLED VETERAN- 8(A)
SIZE STANDARD: $ 7.5M OWNED SMALL BUSINESS
11. DELIVERY FOR FOB
DESTINATION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A RATED
ORDER UNDER DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY
See Block 9 CODE
17a.
CONTRACTOR/OFFEROR:
18a. PAYMENT WILL BE MADE BY CODE
Siuslaw National Forest 3200 SW Jefferson Way Corvallis, OR 97331
TELEPHONE #:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW
OFFER IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Stewardship-CCRD Meadow Maintenance and Habitat Restoration
US Forest Service Siuslaw National Forest
See Schedule Of Items
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4, FAR 52.212-3 AND 52.212-5 ARE
ATTACHED. ADDENDA
ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED.
ADDENDA
ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
29. AWARD OF CONTRACT: REF. your OFFER DATED
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY YOUR OFFER ON SOLICITATION
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF
CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE
SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
31c. DATE
SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.3/2005)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48
AG-04T0-S-16-0061
Stewardship - Central Coast Meadow Maintenance and Habitat Restoration
Continuation of SF-1449
SCHEDULE OF ITEMS
Stewardship-CCRD Meadow Maintenance and Habitat Restoration Counties: Lincoln, Lane, and Douglas Counties
ITEM NO.
SUPPLIES/SERVICES
QUANITY
UNIT
UNIT
PRICE
AMOUNT
MOWING: TRACKS ARE OPTIONAL
1.1 Blackberry Meadow 9 Acres $ _________ $ __________
1.2 Cape Mt 3 Acres $ _________ $ __________
1.3 Enchanted Valley 46 Acres $ _________ $ __________
1.4 Five Rivers Complex 29 Acres $ _________ $ __________
1.5 Lily Lake 10 Acres $ _________ $ __________
1.6 Mann Creek Complex 10 Acres $ _________ $ __________
1.7 Nelson Ridge Complex 29 Acres $ _________ $ __________
1.8 Sams Meadow 6 Acres $ _________ $ __________
1.9 Taylors 12 Acres $ _________ $ __________
1.10 Tenmile Complex 11 Acres $ _________ $ __________
1.11
Vader Meadow 2 Acres $ _________ $ __________
1.12 West Fork Deadwood 3 Acres $ _________ $ __________
1.13 Lower West Fork Deadwood 3 Acres $ _________ $ __________
TOTAL FOR ITEM #1
173 Acres $ __________ Equipment w/Operator
2 MOWING WITH TRACKS ON EQUIPMENT
2.1 SW Upland Enchanted Valley 4 Acres $ _________ $ __________
2.2 Upper Bailey 10 Acres $ _________ $ __________
2.3 Seitz 4 Acres $ _________ $ __________
2.4 Wilson 3 Acres $ _________ $ __________
TOTAL FOR ITEM #2
21 Acres $ __________
3.1 3.2 3.3
HANDWORK REQUIRED
Tenmile Handwork Lower Mann Creek Handwork Upper Mann Creek Handwork
TOTAL FOR ITEM #3
Acres
TOTAL ALL ITEMS
Contractor Fill-in:
DUNS NUMBER __________________________ EMAIL ADDRESS _________________________________
For technical questions, contact Laresa Kerstetter at 541-563-8458 between the hours of 8:00 A.M. and 3:00 P.M., Monday thru Friday.
The estimated start work date is August 6, 2016. All work shall be completed by September 6, 2016.
Offers shall be submitted for all items. Offers for less than the total item will not be considered. All items are subject to Contractor Quality Control.
Quoter must respond to the other factors as described under FAR 52.212-2 Evaluation – Commercial Items (Jan 1999). Award will be made on the best value for the Government.
Quoter MUST register in the Central Contractor Registration (CCR) data base – See FAR 52.212-4 (t) and Online Representations and Certifications Applications (ORCA) – See FAR clause 52.212-3. These are now consolidated at the following site: www.sam.gov. Contractors must have an “active” registration at the time of award for the Government to access electronically.
The contract awardee must register at the https://www.ipp.gov/vendors/enrollment-vendors.htm in order to submit invoices for payment. See page 16 for more information.
Continuation of SF1449
Block 27: The full text of a clause or provision in this contract may be accessed electronically at www.arnet.gov/far/
CONTRACT CLAUSES
ADDENDUM TO FAR 52.212-4
52.211-16 Variation of Estimated Quantity (APR 1984) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if awarded to an individual) 52.236-5 Materials and Workmanship (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984) 52.242-15 Stop Work Order (AUG 1989)
Note: Quotes sent by fax will be accepted; however quotes cannot be accepted by email.
FAR 52.215-5 FACSIMILE PROPOSALS (OCT 1997)
(a) Definition. "Facsimile proposal," as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: 541-750-7236.
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(1) The Contracting Officer shall notify the offeror immediately and permit the offeror to resubmit the proposal.
(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and http://www.sam.gov/ https://www.ipp.gov/vendors/enrollment-vendors.htm http://www.arnet.gov/far/
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timelines, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
(e) The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.
AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified) to perform the Performance Statement of Work referenced in the attachments.
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The Contracting Officer designates the Contracting Officer's Representative (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government, which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
CONTRACTOR'S REPRESENTATIVE
The Government may, at its option, suspend work with full count of contract time continuing, if the Contractor fails to provide a Contractor's Representative (1) conversant in the English language and (2) able to read and understand the contract.
NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement.
The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
1. The name, address, and telephone number of the subcontractor.
2. The date upon which the subcontract was entered into and its duration.
3. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
4. Documentation for the subcontractor’s representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of prime contract.
AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at the Headquarters of the Siuslaw National Forest, 3200 SW Jefferson Way, Corvallis, OR, or at the District Ranger Station.
FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.
SCHEDULES FOR SERVICE CONTRACTS
The Contractor shall provide a progress work schedule in their proposal to insure completion of the work within the time set forth in the contract. If the Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve progress; in addition the Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the contract.
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 3 calendar days after the date the Contractor receives the notice to proceed, (b) execute the work diligently, and (c) complete the entire work by September 6, 2016. The time stated for completion shall include final cleanup of the project sites.
PERIOD OF CONTRACT
Item Estimated Beginning Date Contract Time (Calendar Days) 1 August 6, 2016 complete by September 6, 2016
PROSECUTION OF WORK
(a) The Contracting Officer may require the Contractor to finish the portion in progress before additional work is started on any additional portion.
(b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel and equipment during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site.
(c) The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner.
(End of clause)
MATERIALS AND WORKMANSHIP
(a) The Contractor shall obtain the Contracting Officer's approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(b) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting
Officer may require, in writing, that the Contractor remove from the work any employee that Contracting Officer deems incompetent, careless, or otherwise objectionable.
USE OF BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Excecutive Order (EO) 13423, “Strengthening Federal Evnironmental, Energy, and Transportation Management, “ and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting form the overall quality delivered of the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal Specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative.
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Soy-based machinery lubricants: trans-hydraulic fluid, trans-hydrostatic fluid, 2-cycle oil, crankcase oil, bar and chain oil (chainsaw)
The Contractor shall comply with the provision of FAR 52.223-1, Biobased Product Certification, FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
Examples of USDA Certified Biobased 2-Cycle engine oil and other equipment needs can be found at the website link, then select Vehicle and Equipment Maintenance:
http://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml
FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE
AND CONSTRUCTION CONTRACTS (SEPT 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
AG-04T0-S-16-0061
Stewardship - Central Coast Meadow Maintenance and Habitat Restoration http://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
CONTRACTOR QUALITY CONTROL PLAN
A. Quality Control Plan
The Contractor shall provide a Quality Control Plan (QCP) prior to the start of project. The Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:
- How quality will be monitored to ensure performance standards are met.
- How the work will be supervised.
- How results of the monitoring will result in quality performance.
- Identify the personnel responsible for performing quality control.
B. Contractor Quality Control Inspection
The Contractor shall assure themselves that performance meets contract specifications, in accordance with FAR 52.212-4, Contract Terms and Conditions -- Commercial Items, paragraph (a), prior to requesting the Government to inspect for payment or acceptance. The Contractor shall contact the Contracting Officer upon completion of a unit. The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
The Government will inspect the Contractor’s work to determine compliance with performance standards.
Inspections may include observations of operations, quality control procedures, and visual inspections for acceptance based on contract specifications. The Contractor is encouraged to observe verification inspections and will receive inspection summaries upon request.
http://www.biopreferred.gov/ http://www.sam.gov/
UNSATISFACTORY PERFORMANCE
Nonconformance with any of the specifications will require re-work at the Contractor’s expense to bring the work up to specification standards.
USE OF PREMISES
A. The Contractor shall comply with the regulations governing the operation of premises that are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
B. Before any camp is opened or operated on National Forest land or lands administered by the Forest Service, the Contractor shall request permission (in writing) from the COR. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a camping permit will be issued.
C. It is further stipulated that in addition to clean up of any campsites, the Contractor shall remove its equipment from National Forest land before final acceptance and payment of the project.
AGAR 452.236-73 ARCHAEOLOGICAL OR HISTORIC SITES (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided, the Contractor shall confine contract operations to within the areas designated in contract documents. Unless otherwise provided in this contract, the Contractor shall gather rock, which falls outside the roadway due to contract operations and dispose of it as directed, by the Government.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government. Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating. The spill kit shall be sufficient to absorb 34 gallons of oil, designed to float on the surface, while absorbing oil and repelling water. The KIT shall meet or exceed the physical properties of “New Pig Products Spill Kit #408”. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Engineer and the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.
THREATENED, ENDANGERED, AND SENSITIVE SPECIES
Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to the Stop Work Order, FAR 52.242-15.
PROPERTY AND PERSONAL DAMAGE
(a) The Contractor shall use every precaution necessary to prevent damage to public and private property.
Land monuments and property markers shall not be disturbed until the Contracting Officer, or his/her representative, has witnessed or otherwise referenced their location and directed their removal.
(b) The Contractor shall be responsible for all damage to property and to persons, including third parties, that occur as a result of his/her agent's or employee's fault or negligence. The term "third parties" is construed to include employees of the government.
PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by, or with the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
STORAGE OF MATERIALS AND EQUIPMENT
Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
AGAR 452.236-77 EMERGENCY CONTROL (NOV 1996)
(a) Contractor's Responsibility for Fighting Fire. (1) The Contractor, under the provisions of FAR clause
52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS, shall immediately extinguish, all fires on the work site other than those fires in use as part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-1.
FAR 52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, AG-04T0-S-16-0061 to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
TERMINATION FOR DEFAULT, DAMAGES FOR DELAY
Employment of undocumented workers is conducive to creating situations that cause undue and unwarranted disruptions to contract work. To avoid these situations, it is hereby mutually agreed in the event the Contracting Officer receives written notice form the U.S. Immigration and Naturalization Service of two (2) separate instances where undocumented workers were employed on work under this Contract, action will be taken to place the Contractor in default.
FSAR 4G52.222-701 EMPLOYMENT OF ELIGIBLE WORKERS (DEC 1999)
Section 274A of the Immigration and Nationality Act (8 USC 1324a) makes it unlawful for an employer to hire unauthorized aliens. The Immigration and Naturalization Service (INS) has established the Form I-9, Employment Eligibility Verification Form, as the document to be used for employment eligibility verification (see 8 CFR 274a).
The Contractor is required to (1) have all employees complete and sign the I-9 Form to certify that they are eligible for employment; (2) examine documents presented by the employee and ensure the documents appear to be genuine and related to the individual; (3) record information about the documents on the form, and complete the certification portion of the form; (4) retain the form for three years, or one year past the end of employment of the individual, whichever is longer.
It is illegal to discriminate against any individual (other than a citizen of another country who is not authorized to work in the United States) in hiring, discharging, or recruiting because of that individual's national origin or citizenship status.
Compliance with Section 274A of the Immigration and Nationality Act (8 U.S.C. 1324a) is a material condition of the contract. If the Contractor employs unauthorized workers during contract performance in violation of section 274A, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
For further information on the requirements of the Act, Contractors should contact the Employer and Labor Relations Officer of their local INS office.
FSAR 4G52.222-702 LABOR STANDARDS FOR CONTRACTS INVOLVING MIGRANT AND
SEASONAL AGRICULTURAL WORKERS (DEC 1999)
(a) General. This contract is subject to the Migrant and Seasonal Agricultural Workers Protection Act (MSPA) (29 U.S.C 1801-1872) and to Department of Labor regulations implementing MSPA (see 29 CFR 500). The purpose of MSPA is to eliminate activities that are detrimental to migrant and seasonal agricultural workers, to require registration of farm labor Contractors, and to assure necessary protections for the workers.
In addition to traditional farm labor activities, the Act applies to predominately manual forestry work including, but not limited to, tree planting, release, precommercial thinning, and site preparation and wildland fire fighting.
(b) Definitions.
"Migrant Agricultural Worker" and "Seasonal Agricultural Worker", as used in this clause, mean individuals employed in agricultural (including forestry) work on a seasonal or temporary basis. A worker who moves
AG-04T0-S-16-0061
from one seasonal activity to another is employed on a seasonal basis even though the worker may continue to be employed during a major portion of the year. Migrant workers are required to be absent overnight from their permanent place of residence. Seasonal workers are not required to be absent overnight from their permanent place of residence. Members of the Contractor's immediate family are not considered to be either migrant or seasonal workers. "Immediate family" includes only (1) spouse; (2) children, stepchildren, or foster children; (3) parents, stepparents, or foster parents; and (4) brothers and sisters.
"Farm Labor Contractor", as used in this clause, means an individual who, for any money or other valuable consideration, paid or promised to be paid, performs any recruiting, soliciting, hiring, employing, furnishing, or transporting of any migrant or seasonal agricultural worker.
(c) Registration Requirement. Any Contractor who provides or hires migrant or seasonal workers to perform agricultural or manual forestry work shall first obtain a Certificate of Registration from the Department of Labor or an authorized State agency. The Contractor shall carry the Certificate at all times while engaged in contract performance, and shall display it upon request. Any of the Contractor's employees who also perform any one or more of the activities defined for a "Farm Labor Contractor" in paragraph (b) must have their own Farm Labor Contractor Employee Certificate.
(d) Worker Protections. The Contractor shall comply with the following protections and standards related to wage disclosure, recordkeeping, vehicle safety, and housing:
(1) The Contractor shall display and maintain at the place of employment the MSPA poster provided by the Department of Labor.
(2) Wage and Payroll Standards
(i) The Contractor shall disclose in writing to each worker in a language common to the worker the full terms of their employment, including workers compensation information, at the time they are recruited or hired. The Department of Labor provides an optional form WH-516 for Contractor's use in disclosure.
(ii) The Contractor must keep the following payroll records for each employee: name, address, social security number, basis for wages (i.e. per hour, per tree, per acre), number of units earned if paid on a per unit basis, hours worked, total pay, withholdings and purpose for each, and net pay. Payroll records shall be retained for three years.
(iii) Payments must be made no less frequently than every two weeks or semi-monthly. At the time of each payment, the Contractor shall provide to the employee a written itemization of the information listed above and which shall include the employer's tax identification number.
(iv) If paid on a piece rate basis, the employee's wage must be at least equivalent to the required hourly wage for the hours worked, including overtime differential for time in excess of 40 hours per week.
(3) Motor Vehicle Safety
(i) The Contractor must be registered to transport employees, unless employees provide their own transportation or carpool by their own arrangement in one of their own vehicles. The authorization to transport employees must appear on the Contractor's certificate. If the Contractor directs or requests employees to carpool, the registration requirement is still applicable. Any driver who transports workers for a fee or at the direction of the Contractor must be registered as a farm labor Contractor or a farm labor Contractor employee.
(ii) Any vehicle under the ownership or control of the Contractor shall comply with safety standards applicable to that vehicle. Generally passenger vehicles or station wagons must comply with Department of
AG-04T0-S-16-0061
Labor regulations at 29 CFR 500.104. Vehicles other than passenger vehicles or station wagons which are driven more than 75 miles must comply with Department of Transportation Regulations at 29 CFR 500.105.
All drivers must have a current, valid State driver’s license.
(iii) Each vehicle under the ownership or control of the Contractor which is used to transport any migrant or seasonal agricultural worker shall be covered by vehicle insurance of $100,000 per seat (maximum $5,000,000). A workers compensation policy which covers the workers while being transported plus an additional property damage policy for $50,000 for loss or damage in any one accident to the property of others may be substituted for the vehicle insurance requirement.
(4) Housing
(i) The Contractor shall house workers only in a commercial establishment or a facility that has been certified by a health authority or other appropriate agency. The Contractor must post the certificate of occupancy at the housing site.
(ii) The authorization to furnish housing, other than commercial lodging, must appear on the Contractor's certificate.
(e) For further information on the requirements of the Act, Contractors should contact their local Wage and Hour Division of the Department of Labor.
SUPPLEMENT TO 4G52.222-702 (D) (4) - HOUSING:
(iii) If the Contractor is not furnishing worker housing:
Workers on this contract may obtain housing only in a residential accommodation, including a commercial establishment such as a hotel or motel, which meets all applicable state and federal standards for employee housing.
Within 10 days after award, and prior to the issuance of Notice to Proceed, the Contractor must notify the Contracting Officer of the planned worker housing site.
If the housing site is located on a National Forest, the Contractor must obtain a permit from the District Ranger for the District on which the housing site is located and the facilities established for the workers must meet the applicable U.S. Department of Labor (USDOL) MSPA standards for such sites.
If the housing site is not located on a National Forest, the site must meet the applicable housing standards in
MSPA.
If an exemption from the permit requirement is claimed, the Contractor must provide a written statement identifying the law authorizing the exemption, stating the facts constituting an exemption under that law, and identifying a USDOL employee or official who stated or concurred that the accommodations were exempt, citing name, date, and means of communication.
If the housing site is changed after approval by the Contracting Officer, the Contractor must provide a new Permit or exemption statement. The above requirements are material conditions of this contract. If the Contractor fails to comply, the Government may terminate the contract. In addition, other remedies or penalties prescribed by law may apply
Field Sanitation
In accordance with US Department of Labor Fact Sheet No. ESA 97-28 “Field Sanitation Standards” (Ref.
29CFR 1928.110), employers must provide:
► Potable drinking water, suitably cool and in sufficient amounts, dispensed in single-use cups or by fountains, located so as to be readily accessible to employees.
► Facilities maintained in accordance with public health sanitation practices include upkeep of water quality through daily change or more often if necessary.
► Notification to each employee of the location of the water and allowance of reasonable opportunities during the workday to use them. The employer also must inform the employee of the relevant health hazards in the field and the practices necessary to minimize them.
Employees cannot be made to bear the costs incurred by the employer for providing required facilities.
FSAR 4G52.222-703 MIGRANT AND SEASONAL AGRICULTURAL WORKER PROTECTION
ACT REGISTRATION (DEC 1999)
The Migrant and Seasonal Agricultural Worker Protection Act (MSPA) (29 U.S.C. 1801-1872) and implementing regulations issued by the Department of Labor (29 CFR 500), require any employer who hires or anticipates hiring employees subject to MSPA to obtain an MSPA registration number.
If the contractor employs or anticipates hiring employees subject to MSPA, the contractor shall provide a valid U.S. Department of Labor MSPA Registration Number to the Contracting Officer within 10 days after notification of award of the contract.
The Government may demand that the contractor display MSPA registration at any time during contract performance if it appears that the contractor is employing workers subject to MSPA. On demand, the contractor shall display its MSPA registration or state why it is exempt from MSPA.
Compliance with MSPA is a material condition of the contract. If the contractor fails to provide a valid MSPA number in accordance with this clause, or falsely states that it is exempt from the MSPA, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
FSAR 4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEBRUARY 2007)
The contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment shall not be used.
The contractor shall provide chain saw chaps to each employee who operates a chain saw, at no cost to the employee. These chaps must be approved by an Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh and shall extend to the top of the boot on each leg.
The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
In any area where the worker is exposed to the potential for flying or falling objects, the contractor shall provide a hard hat, at no cost to the employee, and the contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1- 2003.
The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chain saw operation.
FSAR 4G52.222-705 CAMPING PROVISIONS FOR LABOR INTENSIVE CONTRACTS
(FEBRUARY 2007)
The following provisions apply to all camping on National Forest lands during performance of this contract:
These provisions are in addition to those contained in, or provided for, in the clause titled “Use of Premises”, in this contract.
Every structure used as shelter shall provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect workers from the cold. Firewood may be cut only after obtaining a District Firewood Permit.
The campsite must not encroach beyond the boundaries designated by the Forest Service. The campsite shall be located so as to minimize impacts on streams, lakes, and other bodies of water. No camping is permitted within developed recreation sites or along primary recreation roads.
The campsite shall have a clean appearance at all times. Upon abandonment of any campsite, or termination, revocation, or cancellation of camping privileges, the contractor shall remove, within 10 calendar days, all structures and improvements except those owned by the United States, and shall restore the site, unless otherwise agreed upon in writing or in the camping permit. If the contractor fails to remove all structures or improvements within the 10 calendar days, they shall become the property of the United States, but that will not relieve the contractor of liability for the cost of their removal and restoration of the site.
Unless otherwise designated by the Contracting Officer, the use of this area is not exclusive, and may be granted to other Permittees, contractors, or recreating public. Disorderly conduct is not permitted. Damaging or removing any natural feature or other property of the Forest Service is prohibited. Servicing of equipment in the campsite is not permitted, unless the campsite is within the project area. Sanitary facilities shall be provided for storing food. Ice chests or coolers, with ice supply made from potable water and replenished as necessary, shall be provided and sufficient for the storage of perishable food items. An adequate and convenient potable water supply shall be provided in each camp for drinking and cooking purposes. Toilet facilities adequate for the capacity of the camp shall be provided and supplied with adequate toilet paper.
Such facilities shall be serviced and maintained in a sanitary condition. Garbage shall be collected, stored, and disposed of in such a manner as to prevent scattering by the wind, minimize attraction of flies, and discourage access by rodents.
AG-04T0-S-16-0061
Basic first aid supplies shall be maintained, available, and under the charge of a person trained to administer first aid. The supplies shall include:
Gauze pads (at least 4x4 inches) Two large gauze pads (at least 8x10 inches) Box adhesive bandages (band-aids) One package of gauze roller bandage at least 2- inches wide Two triangular bandages Scissors At least one blanket Tweezers Adhesive tape Latex gloves Resuscitation device such as resuscitation bag, airway, or pocket mask
Any washing of laundry shall must be done in such a way as to provide for washing and rinsing without polluting lakes, streams, or other flowing water.
Waste water must be disposed of away from living and eating areas and in a fashion that minimizes pollution to lakes, streams, and other flowing water.
The contractor shall take all reasonable precautions to prevent and suppress forest fires. No material shall be disposed of by burning in open fires during the closed season established by law or regulation without the written permission from the Forest Service.
The contractor shall comply with the following fire regulations during fire season:
During the fire season, a shovel, axe or Pulaski, 10- quart pail which is full of water for immediate use, and a fire extinguisher with an Underwriters Laboratory (UL) rating of at least 1:A 10:BC is required during the fire season.
All fire rings or outside fireplaces must be approved by the Forest Service representative. The area will be cleared down to mineral soil for a distance of 1 foot outside of the ring or fireplace, and it will not have any overhanging material. Fire rings will be dismantled and material disposed prior to leaving the site.
All generators and other internal combustion engines must be equipped with US Forest Service approved spark arrestors and/or factory designed muffler and exhaust system in good working order. They will be located in a cleared area with the same requirements as in (b).
All fuel must be stored in UL approved flammable storage containers and be located at least 50 feet from any open flame or other source of ignition.
Any violation of these conditions constitutes a breach of contract, and may result in revocation of camping approval.
The Forest Service reserves the right to terminate a camping permit at any time.
FEDERAL FARM/LABOR CONTRACTOR CERTIFICATE OF REGISTRATION AND STATE
FARM/FOREST LABOR LICENSE
A. The Migrant/Seasonal Agricultural Workers Protection Act requires Contractors to obtain a Farm Labor Contractor Certificate of Registration number. Questions concerning application or processing may be addressed to:
Department of Labor Attn.: Ramon Lopez or William Zapata Wage and Hour Division 97th Street, Suite 13-100;
San Francisco, CA 94103
(415) 625-7689 or (415) 625-7688
B. Farm Labor Contractor's Laws require farm/forest labor Contractors to register with and be licensed by the State. State of Oregon licenses may be obtained from:
Department of Labor and Industries Wage and Hour Division
3865 Wolverine St. NE, Bldg. E-1 Salem, OR 97305-1268 Telephone (503) 373-1463
PROCESSING INVOICES THROUGH INVOICE PROCESSING PLATFORM (IPP)
The USDA, Forest Service requires the use the Invoice Processing Platform (IPP) for electronic submission and tracking of purchase orders, invoices, and payment information to its suppliers of goods and services.
IPP is a Government-wide, secure web-based invoice processing service offered free of charge to Government agencies and their suppliers by the U.S. Department of Treasury’s Financial Management Service (FMS).
You will need to register at the following link: https://www.ipp.gov/vendors/enrollment-vendors.htm If your company is a current user of IPP, no further enrollment actions are necessary. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding bank holidays) from 8 a.m. - 6 p.m. ET, including answering any questions related to accessing IPP or completing the registration process.
Their toll-free number is 1-866-973-3131 or they can be reached at IPPCustomerSupport@fms.treas.gov.
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (MAY 2015)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
AG-04T0-S-16-0061
Stewardship - Central Coast Meadow Maintenance and Habitat Restoration https://www.ipp.gov/vendors/enrollment-vendors.htm mailto:IPPCustomerSupport@fms.treas.gov
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .