SpecList.pdf
PDF 36 KB Posted
- Attached to
- PAYCO NFSR #2210
- Solicitation number
- AG-04T0-S-12-0006
About this file
Spec List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amend2.pdf | ||
| WageRatesAmend1.pdf | ||
| amend1.pdf | ||
| SPS.pdf | ||
| CompleteSolicitation.pdf | ||
| WageRates.pdf | ||
| Payco2210DWGS.pdf | ||
| BidPacket.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP-03 SPECIFICATION LIST Payco NFSR #2210
All specifications not included in the specification listing, but included by reference, are applicable. “” denotes applicable standard and/or supplemental specifications. The supplementals shown on the specification list are physically attached.
Forest Service Supplement Specification Revised Preface 3/15/2004 101 - Terms, Format, and Definitions FP-03
101.01 Meaning of Terms 1/22/2009
101.03 Abbreviations. 6/16/2006
101.04 Definitions. 3/29/2007
102 - Bid, Award, and Execution of Contract 2/16/2005 103 - Scope of Work FP-03
103.00 Deletions 2/16/2005
104 - Control of Work FP-03
104.00 Deletions 6/16/2006
104.06 Use of Roads by Contractor 2/17/2005
105 - Control of Material FP-03
105.02 Material Sources. 1/18/2007
105.02 Material Sources. 2/17/2005
105.05 Use of Material Found in the Work. 5/12/2004
106 - Acceptance of Work FP-03
106.01 Conformity with Contract Requirements 7/31/2007
106.07 Delete 5/11/2004
107 - Legal Relations and Responsibility to the Public FP-03
107.02 Protection and Restoration of Property
and Landscape. 2/17/2005
107.05 Responsibility for Damage Claims. 5/11/2004
107.06 Contractor’s Responsibility for Work. 6/16/2006
107.09 Legal Relationship of the Parties. 6/16/2006
107.10 Environmental Protection. 6/16/2006
108 - Prosecution and Progress 2/16/2005 109 - Measurement and Payment FP-03
109.00 Deletions 2/17/2005
109.02 Measurement Terms and Definitions 6/16/2006
151 - Mobilization FP-03 152 – Construction Survey and Staking FP-03
152.00 Description. 8/05/2005
155 – Schedules for Construction Contracts 5/11/2004 156 - Public Traffic FP-03
156.00 Complete Specification 4/17/2007
Continued…
FP-03 SPECIFICATION LIST Payco NFSR #2210
157 - Soil Erosion Control FP-03
157.01 Description 2/03/2009
170 - Develop Water Supply and Watering 3/26/2007 171 - Weed and Disease Prevention 3/26/2007 201 - Clearing and Grubbing FP-03
201.01 Description. 2/18/2005
201.02 Material. 8/5/2009
201.03 General. 8/5/2009
201.04 Clearing. 2/22/2005
201.06 Disposal. 3/26/2007
203 - Removal of Structures and Obstructions FP-03
203.01 Description. 2/25/2005
203.04 Removing Material. 2/18/2005
203.05 Disposing of Material. 3/26/2007
203.05 Disposing of Material. 5/30/2007
204 - Excavation and Embankment 5/28/2008 207 - Earthwork Geotextiles FP-03 209 - Structure Excavation and Backfill FP-03
209.07 Dewatering. 7/12/2007
209.10 Backfill. 5/01/2007
251 – Riprap FP-03
251.03 General. 8/5/2009
322 – Minor Aggregate Courses 10/24/2007 602 - Culverts and Drains FP-03
602.03 General. 9/6/2005
602.03 General. 3/26/2007
635 - Temporary Traffic Control FP-03
635.03 General. 5/13/2004
703 – Aggregate FP-03
703.05 Subbase, Base, Surface Course, 8/14/2009
and Screened Aggregate.
703.10(e) Flakiness Index 3/2/2005 703.10(i) Adherent Coating 3/2/2005 704 – Soil FP-03
704.02 Bedding Material. 3/2/2005
713 - Roadside Improvement Material FP-03
713.05 Mulch. 3/2/2005
718 - Traffic Signing and Marking Material FP-03
718.05 Aluminum Panels 8/5/2009
File details come from the government source that posted it. Updated .