AMEND 1-Section832.pdf

PDF 25 KB Posted

Attached to
Siuslaw NF Road Maintenance IDIQ
Solicitation number
AG-04T0-S-12-0005
Issued by

About this file

AMENDED Sect 832

View the file

Other files

File Type Posted
AMEND 1-ReturnPkt.pdf PDF
AMEND 1-SF30.pdf PDF
1-SolicitationAG04T0S120005.pdf PDF
5-WageDetermination.pdf PDF
4-Drawings.pdf PDF
6-SampleTaskOrder.pdf PDF
3-VicinityMaps.pdf PDF
2-ContractorReturnPacket.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 832 – LOAD, HAUL, AND PLACE MATERIALS

832.01

SERVICE REQUIRED:

Load, haul, and place material at designated sites.

832.02

PERFORMANCE STANDARD:

Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and re-vegetation as ordered by the Contracting Officer. Other unsuitable material, aggregate stockpiles, or slash designated for hauling has been loaded and placed in designated locations.

832.03

LOCATION OF WORK:

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as directed by the Contracting Officer. Waste areas will be identified within two (2) miles of the slide site.

832.04

MEASUREMENT:

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.

The quantity is designated as “All”. Estimated quantities of lump sum work shown in the contract are approximate. These quantities denote one complete unit of work as required by, or described in, the contract, including necessary materials, equipment and labor to complete the job.

832.05

PAYMENT:

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay item listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

832(1) Load, Haul, and Place Material (Slides 0 – 20 CY) LS 832(2) Load, Haul, and Place Material (Slides 21 – 50 CY) LS 832(3) Load, Haul, and Place Material (Slides 51 – 100 CY) LS

832.06 ACCEPTABLE QUALITY LEVELS:

Description

Major Defect Minor Defect Allowable Defects

Required Action

Major Minor

Major Minor

Slopes

Unstable material left on slopes

Material left on slopes that can be stabilized and won’t block drainages

0 per pay unit

Remove Remove or stabilize in place

Backslopes

Undercut backslope will result in destabilization of slope

Undercut backslope will not result in destabilization of slope

0 per unit

Repair and Stabilize

Revegetate if greater than 2 minor defects

Ditches, inlet/outlet channels, streams and catch basins

Water will be diverted out of the drainage structure or soil enters system

<20% impeded, but water will stay in the channel

0 1 per unit

Rework

Rework if greater than 3 minor defects

Debris on Road

Debris in traveled way that may slow or impede low clearance vehicles

Debris in traveled way that does not slow or impede low clearance vehicles

0 1 per pay unit

Rework Rework if greater than 1 minor defect

Placed material (Disposal Sites)

Unstable material on designated sites

N/A N/A Stabilize N/A