amend1.pdf
PDF 81 KB Posted
- Attached to
- PAYCO Road 1700 North Pavement Repair
- Solicitation number
- AG-04T0-S-11-0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AmendedWageRates.pdf | ||
| RevisedSchedule.pdf | ||
| CompleteSolicitation.pdf | ||
| SpecificationList.pdf | ||
| Specifications.pdf | ||
| WageRates.pdf | ||
| BidBond.pdf | ||
| PacketToCompleteAndReturn.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-04T0-S-11-0023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
1 8 August 2011
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Siuslaw National Forest Supervisor's Office 4077 S.W. Research Way Corvallis, OR 97333
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
8 July 2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning - 1- copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
See attached.
PROPOSALS ARE NOW DUE 1600 LOCAL TIME ON 12 AUGUST 2011.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Darcy J. Rapoza, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
/s/ Darcy J. Rapoza 8 August 2011
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
On 8 August 2011, the Government was made aware of a discrepancy between the Schedule of Items, Section B, and the Estimate of Quantities, Sheet 3 of 15 of the plans. Because of this error, the following changes are required to be made to the solicitation:
1. Schedule of Items, Section B, Pay Item 60252B, 24 inch corrugated polyethylene pipe, method B:
Estimated quantity is changed from 34 feet to 334 feet. Please see attached revised Schedule of Items.
2. Estimated start work date is changed from 22 August 2011 to 6 September 2011.
3. Wage Determination OR100002 with 16 modifications, dated 7/1/2011 is replaced with Wage
Determination OR 100002 with 17 modifications, dated 8/5/2011.