Contract.docx

DOCX document 2 MB Posted

Attached to
Bailey Butte Fire Fence Replacement
Solicitation number
AG-04N0-S-15-0002
Issued by

About this file

Contract

View the file

Other files

File Type Posted
fire_clauses_r6-fs-6300-52.doc DOC document
fire_clauses_r6-fs-6300-54 1 .rtf RTF text file
Wage_Determination.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2015 Bailey Butte Fire Fence ReplacementOchoco National Forest
SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-04N0-S-15-0002

2. TYPE OF SOLICITATION

|_| SEALED BID (IFB)

|X| NEGOTIATED (RFP)

3. DATE ISSUED

07/23/2015

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

756571

6. PROJECT NO.

7. ISSUED BY CODE

8. ADDRESS OFFER TO

Ochoco National Forest 3160 NE Third St.

Prineville, OR 97754

Ochoco National Forest Attn: Cyndy Armour 3160 NE Third St.

Prineville, OR 97754

9. FOR INFORMATION
CALL:
A. NAME

Cyndy Armour B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 541-416-6662

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

All documents included

11. The Contractor shall begin performance within _10_ calendar days and complete it within _304__ calendar days after receiving |_| award, |X| notice to proceed. This performance period is |_| mandatory, |X| negotiable. (See _______________.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

|_| YES|X| NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.Sealed offers in original and ____ copies to perform the work required are due at the place specified in Item 8 by __4:30_____ (hour) local time ___August 21, 2015___ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.An offer guarantee|_| is,|X| is not required.
C.All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.Offers providing less than _10_ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212STANDARD FORM 1442 (REV. 4-85)
Computer GeneratedPrescribed by GSA
FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within _____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds. NOT REQUIRED

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
|_| 10 U.S.C. 2304(c)( )|_| 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

|_|28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
|_|29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

PART I – THE SCHEDULE

SECTION C – DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

C.1 STATEMENT/DESCRIPTION OF WORK

This solicitation is for fence removal and reconstruction of approximately 3.25 miles and maintenance/patching of approximately 1.5 miles of fence-line; post Baily Butte Fire, to be performed along Highway 26 on the Ochoco National Forest. (See attached map)

C.2 PROJECT LOCATION

From Prineville Oregon, go approximately 31 miles east on Highway 26.

C.3. CONTRACTOR OBLIGATIONS

The Contractor shall furnish all equipment, labor, supervision, transportation, materials, tools, supplies and incidentals necessary to perform the described work according to the specifications.

C.4 PRICE RANGE

The Government's estimate is: between $25,000 and $100,000.

C.5 CONSTRUCTION CONDITIONS

This project needs to be done during dry soil conditions to prevent resource damage. Soils are typically dry in the project area in the summer and fall. Wet soil conditions may result in a temporary, partial or full suspension of operations.

C.6 TIMING OF CONSTRUCTION

Construction is anticipated to take place between September 2015 and June 30, 2016.

C.7 CONSTRUCTION REQUIREMENTS (see attached map)

a) EXISTING FENCE REMOVAL There is an existing fence on the north or west side of Highway 26 with gap fencing and natural barriers on the south or east side. Where complete rebuilding is necessary, (blue sections on the map – Appendix 1) the existing above ground fence and associated materials shall be removed. As some sections of the fence are buried under fire debris, these portions of fence do not need to be removed.

b) NEW FENCE INSTALLATION

1 Fence Corridor Clearing

1.1. The fence shall be located in the center of cleared right-of-way. A six foot right-of-way on each side of the fence is to be cleared of logs and trees. Limbs on trees shall be removed to a height of 8 feet on trees used as posts in the fence. Limbs and brush removed from the right-of-way shall be scattered off the right-of-way. All slash must be kept at least 20’ from any game or livestock trails.

1.2 Tree stump height remaining after trees in the corridor have been cleared shall be 6 inches or less from ground level. All tree stumps shall be cut flat across. All lower live limbs shall be severed from stumps.

1.3 All dead standing trees in the corridor shall be felled, and outside of the corridor shall be felled, if when dropped, they would hit the fence. The exception to this felling is when any tree has a placard designating the tree as a wildlife tree.

1.4 Pruning of trees shall not cause the tree to bleed excessively. Branches shall be cut approximately 1 inch from the bole. Bole of tree shall not be damaged by pruning.

2 Construction

2.1 Line Wires

Four wires shall be spaced as follows: The bottom wire (barbless 12.5 GA) will be 16 inches from ground level the next three (barbed 12.5 GA) shall be spaced at 24, 30, and 42 inches, respectively, from ground level unless the fence is located across a steep slope. In this situation the top wire will not exceed 40 inches, while still allowing for 12 inches between the top two wires.

2.2 Posts

Construction shall be with 5 1/2 foot steel T-type posts set approximately 18-20 feet apart. The spacing may be slightly closer to keep the bottom wire at an acceptable height above the ground line. Live trees or line jacks may be used in lieu of steel posts. If live trees are used, they must be located within two feet of the established line (a fence line offset brace must be used to maintain the stretch line), be a minimum of 8" dbh and must have a nailer ( "scab" ) attached. Only Western larch, Ponderosa pine or Douglas (Red) fir may be used as tree ties, unless otherwise approved by the COR. Steel posts shall be driven into the ground, past the top of the flange plant. It is acceptable to pre-drill post holes in rocky ground to permit the use of posts in these conditions. If this method is used, the flange may be knocked off prior to pounding; however the post must be secure in the hole with no wobbling. Steel posts shall be relieved of upward pull of wires by use of deadman rock anchors and tie-downs. Tie downs can be secured using a large rock or a T-post driven at a 45 degree angle parallel to the fence (no more than 18 inches of post can remain out of the ground.) There can be no more than ten steel posts in a line (max 200 feet) without having a scabbed live tree ( 8" dbh or larger ) or a line jack to support the fence line.

2.3 Stays

Split or rough sawn larch stays shall be used. One stay will be evenly spaced between each steel post or figure four. Stays will be attached to the fence using 1 ¾ inch galvanized staples.

2.4 Gates

The locations of the gates will be flagged by the COR. Gates shall be 14 feet wide and constructed with 4 strands of barbed wire. The bottom wire on the gate will be at 16 inches above ground with the next two spaced 8 inches apart and the top wire spaced at 10 inches. Ends of the gate shall be attached to trees, rock jacks, rock cribs or H-braces.

2.5 Wire Stretching

Wire will be tightened adequately to set the wire twists and remove factory kinks. It is, however, important to refrain from stretching the wire excessively. Excessive tension will weaken the barbed wire by removing the capacity for it to stretch. Location of stretch points will be determined by topography and the availability of tie-trees.

2.6 Splicing

Splices in the wire shall be made by wrapping the ends of the wire back around the wire three times, thereby forming an eye at the end of the wire. The other wire end is then placed through the eye and wrapped back around itself at least three times. All wraps shall lie directly adjacent to each other, thus forming neat, tight wraps.

2.7 Rock Jacks/Line Jacks

Rock jacks or line jacks will be placed at the top and bottom of all abrupt breaks in slopes. Rock jacks will also be used to anchor both sides of gates, stream crossings and fence end points. Tree-ties or H-braces may be substituted for rock jacks.

Rock Jack Construction: A shallow hole (6-10 inches deep) shall be dug to keep the jack from sliding if the jack is used as an end or in a pivot point in the fence. Set the upright post in place, pack soil around the post and nail the two braces to the other corners of the triangle and to the upright post. Use two 6" galvanized 60 penny nails or hot galvanized 6 inch timber tie nails placed at binding angles in the end of each piece. The lower end of the post must be double nailed to extended ends of floor joists.

The two floor joists are nailed about 6 inches above the ground. Floor material can be trimmed to fit the triangular space it covers but is not nailed to the joist.

Use two nails placed at a binding angle at each nailed junction in all jacks. One-half the length of each nail should be in the piece being nailed to. Notch outside piece if necessary to allow full contact of each face. Rock jacks not constructed using this method will not be acceptable. Nails will be driven at right angles to the annual ring. Nails should not be closer than 6 inches to the end of any piece to minimize splitting. Nailed junctions should have sound wood against sound wood, no bark between.

All corners of the jack shall be wired with one tight wrap of either No. 9 or 12 ga. two strand barbless wire. Each of the three bottom corners shall have a rock set under the corner to allow settling of the jack, but to keep the jack floor from settling to the ground.

After the wires are stretched between available trees or anchor jacks, the empty jacks are easily placed up to the wire. Next, rock up under the joists and then fill the jacks with rock. 100 -150 pounds of rock shall be placed on the floor of each line jack. On rock jacks used as corners or tie points, the rock load shall be 300-500 pounds. No log chunks or other weight will be acceptable.

Tree tie – use a minimum of 4 stays when trying fence to trees (min. 12 DBH) for corner/brace tree ties.

2.8 Figure-Fours

Figure-fours shall be constructed using four foot split/sawn larch pieces for the stay portion of the figure four. 5’6” pieces will be used for the legs of the figure four as indicated in the plan. 6” nails shall be used for securing the figure four.

2.9 Trees

Solid live trees over 8 inches dbh may be used in place of posts, provided they are located not over 2 feet out of line. Only Western larch, Ponderosa pine or Douglas (Red) fir may be used, unless otherwise approved by the COR. Tree branches shall be removed completely around the fence, to a height of 8 feet. A scab shall be securely nailed, with 6" helix nails to the tree at three points: top, center, and bottom. Nailer should be pre-drilled to reduce the incidence of splitting.

2.10 Braces

H-Braces may be used as end points if no tree-ties or rock is available for rock jacks. Posts must measure no less that 6-8 inches at the small end. Posts will be buried a minimum of 3 feet and spaced 8 feet apart. A pressure treated 4"x4" will be used as the cross-piece brace between the costs. These braces will be placed approximately 40" from the ground. Two diagonally placed tension wires of double wrapped 12 1/2 ga smooth two strand wire will be secured at ground level and 48" with pig-tailed ends. This is then tightened with a twitch stick made from a stay until the wire is very tight. The loose end of the twitch stick can be rested against the 4"x4" cross-piece.

2.11 Stapling

Staples shall be driven at a slant to the grain of the wood to prevent the wood from splitting and will not be driven so deep as to nick the galvinizing on the wire. Staples should be driven to allow movement of the wire between the wire and post/tree scab to prevent the wire from pulling into the scab.

2.12 Water Gaps/Stream Crossings

Stream crossings shall be constructed to allow the flow of high water and provide a barrier for livestock.

c) MATERIALS LIST 5 1/2 ft. or 6 ft. 133 heavy duty "T" type steel fence posts 12 1/2 gauge galvanized barbed wire, Class1 12 1/2 gauge galvanized barbless wire, Class 1 1 3/4 hot dipped galvanized staples 6" Galvanized 60 penny nails, 6 inch helix nails or hot galvanized 6 inch timber tie nails Split or sawn larch wood material (for rock jacks and figure fours) Stays—9 square inch cross section, 4 feet long split larch, use heavier stays as figure four uprights.

Rock Jack Posts--approximately 6x6 cross section, 5’6” long split or sawn larch Rock Jack Legs—approximately 3x6 cross section, 6’-8’ long split or sawn larch Figure Four legs—approximately 9-12 inch cross section, 5’ 6 long split or sawn larch 6"-7" round ACQ treated posts and pressure treated 4" x 6" beams for H-braces.

d) INSPECTION AND ACCEPTANCE Inspections will be done weekly unless the contractor submits a request for inspection to the Contracting Officer’s Representative (COR). The request shall be at least one (1) working day prior to the requested inspection.

Acceptance shall be decided by the Contracting Officer (CO) with recommendations submitted by the COR.

e) CONTRACTOR’S WORK SCHEDULE Prior to commencing work, the contractor shall provide an accurate schedule of work to allow timely government quality assurance inspections.

f) MEASUREMENT AND PAYMENT

a. Measurement The fence will be measured as contract quantity completed and accepted by the Contracting Officer (CO).

b. Payment The payment will be made as a lump sum as shown on the Schedule of Items.

PART I – THE SCHEDULE

SECTION D – PACKAGING AND MARKING

No clauses in this section for this contract

PART I – THE SCHEDULE

SECTION E – INSPECTION AND ACCEPTANCE

E.1 FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(a)Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b)The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c)Government inspections and tests are for the sole benefit of the Government and do not—
(1)Relieve the Contractor of responsibility for providing adequate quality control measures;
(2)Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3)Constitute or imply acceptance; or
(4)Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g)If the Contractor does not promptly replace or correct rejected work, the Government may—
(1)By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2)Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

E.2 COMPLIANCE INSPECTION

The Contracting Officer or Inspector will, by formal inspection, determine if the specified progress or methods of work are being carried out. Failure to comply with specified work standards may be cause for termination of the Contractors right to proceed, in accordance with Clause 52.249-08.

E.3 CONTRACT PERSONNEL

If the Contractor is absent from the project area, a Contractor’s representative (designated in writing) shall be available for communication on a daily basis while work is in progress.

E.4 INSPECTION OF WORK

Periodic inspection of work shall be made by the Forest Service to ensure compliance with contract specifications. Periodic field inspections will be made by Contracting Officer's Representative (COR) or the COR's designated inspector. Work not completed to contract specifications shall be reworked without additional compensation to the Contractor.

E.5 DETERMINATION OF ACCEPTABLE WORK

Inspection as stated above shall be performed by the Forest Service for evaluation of contract specification compliance. The Contractor will be notified in writing of the fence items not meeting contract specifications. Portions of fence which do not meet contract specification will be reconstructed by the Contractor and the identified items will be brought up to the required standard before the fence will be considered acceptable.

E.6 UNACCEPTABLE WORK

If any portion of the fence is found to be unacceptable the Contractor shall reconstruct the unacceptable portion to comply with the specifications. Upon completion of the reconstructed fence, the Forest Service will re-inspect to determine compliance. If more than two inspections are needed for repeated deficiencies, the Contractor may be charged inspector’s time and vehicle use.

E.7 RE-INSPECTION UPON CONTRACTOR REQUEST

If the original inspection results are not acceptable to the Contractor, a re-inspection may be requested in writing up to 7 days after being notified of the unacceptable work. The original inspection will be re-examined by a different inspector accompanied by the Contractor. If the re-inspection confirms the original inspection as not meeting standards, the Contractor shall reimburse the Government the actual costs incurred in making the re-inspection. If the inspection indicates that work meets acceptable standards, the Government assumes the cost of re-inspection and payment will be made for the fence.

E.8 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

FAR 52.242-14Suspension of Work (APR 1984)
FAR 52.242-15Stop-Work Order (AUG 1989)
FAR 52.242-17Government Delay of Work (APR 1984)

PART I – THE SCHEDULE

SECTION F – DELIVERIES OR PERFORMANCE

F.1 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK - (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than June 30, 2016. The time stated for completion shall include final cleanup of the premises.

F.2. AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The effective period of this contract is from approximately September 2015 through June 30, 2016.

F.3 AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE - (NOV 1996)

Within 3 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is TBD hrs.

F.4 SUSPENSION OF WORK FOR OTHER THAN GOVERNMENTS CONVENIENCE

The Contracting Officer may issue orders to suspend work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered under FAR 52.212-12, Suspension of Work, and shall not qualify for an equitable adjustment.

F.5 PROSECUTION OF WORK

(a)Construction activity shall be limited to the hours between 6:00 a.m. and 7:00 p.m., 7 days a week, unless other hours are approved in writing by the COR. The Contractor shall conduct activities so that interference with the public and/ or Government personnel shall be kept to a minimum. All activities requiring closure to the public and/ or Government personnel shall be scheduled with the COR at least 7 days in advance.
(b)The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.

PART I – THE SCHEDULE

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the contracting officer prior to completion of the contract.

The contracting officer should be informed as soon as possible of any actions or inactions by the contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer. Whenever, in the opinion of the contractor, the COR requests effort outside the scope of the contract, the contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be Notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

COR: Bryan KurtzTechnical Contact: Jacob Young
Phone: 541-416-6601Phone: 541-416-6409

G.2 CONTRACTOR’S REPRESENTATIVE

Before work starts, preferably at the pre-work conference, the Contractor shall designate in writing the person or persons who will represent and act for Contractor in Contractor’s absence from the job. In the designation, the Contractor shall describe the areas of responsibility assigned to the representative(s).

G.3 PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters, they act solely as agents and representatives of the Government.

G.4 NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The written notification shall include as a minimum:

(a)The name, address and telephone number of the subcontractor.
(b)The date upon which the subcontract was entered into and its duration.
(c)A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
(d)Documentation of the subcontractor’s representative authority.

G.5 MEASUREMENT AND PAYMENT

Inspection for acceptance of work will be accomplished by a 100 percent visual inspection and will be based on adherence to the specifications. In the event visual inspection finds less than satisfactory work is being performed, re-work will be required at no cost to the Government. Areas not adhering to specifications will be flagged, identified to the contractor and documented in the daily diary. In the event damage to previously inspected portions of the fence is found, whether from natural events or manmade, the contractor will be responsible for re-work to repair the damage before final payment is made. Measurement of completed work will be based on the connection of the new fence line to the two existing fence lines. Approximate length of the new fence line is 2.01 miles based on a GPS measurement.

The Contractor will submit original invoices to IPP with a copy to the Contracting Officer’s Representative (COR) for approval. COR will forward to the Contracting Officer (CO) for payment.

Deductions

Replacement cost for any lost, damaged, or unused Government property that is not returned will be deducted from the Contractor’s final payment at the current market or GSA value necessary to replace said item.

PART I – THE SCHEDULE

SECTION H—SPECIAL CONTRACT REQUIREMENTS

H.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 5 days after the date of contract award. The conference will be held at:

Ochoco National Forest
3160 NE Third St.
Prineville, OR 97754

H.2 NOXIOUS WEED CONTROL

In order to prevent the potential spread of noxious weeds into the Ochoco National Forest, the Contractor shall be required to furnish the Forest Service with proof of weed-free equipment.

Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the Oregon Department of Agriculture or the Crook County Weed Board or by other appropriate agencies having jurisdiction.

All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the contractor or subcontractor.

Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose. Cleaning shall occur off Federal lands. (Equipment Cleaning Inspection/Verification Form)

Equipment, materials and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free. Inspections will take place at a location designated by the COR in advance of equipment and material arrival. Equipment and vehicles are expected to proceed directly to the job site following the inspection. Materials to be used on the project will be delivered to the job site following the inspection. Materials to be used on the project will be delivered to the project after inspection and approval.

Certification shall remain valid for each identified piece of equipment or vehicle only for the duration of the specified project and only as long as the vehicle or equipment remains at the job site. Equipment and vehicles (excepting passenger vehicles - this includes pickups and vans) that leave the job site will need to be recertified as weed free before they are allowed to return to the job site or re-enter the National Forest.

H.3 FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.

(b) The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the Contractor’s cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.

(c) No request by the Contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the Contractor has given the written notice required; provided, that the time prescribed in (a) above for giving written notice may be extended by the Contracting Officer.

(d) No request by the Contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.

H.4 FAR 52.236-3 SITE INVESTIGATION & CONDITIONS AFFECTING THE

WORK (APR 1984)

(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the government assume responsibility for any understanding reached or representation made concerning conditions, which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

H.5 FAR 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trace name, make or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and work man like manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

H.6 FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

H.7 FAR 52.236-7 PERMITS AND RESPONSIBILITES (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall acquire a roadside operations permit from Crook/Grant/Wheeler County(ies), provide associated minimum insurance policies, and provide Certificates of Insurance acceptable to the County. The Contractor shall also be responsible for all damage to persons or properties that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work, which may have been accepted under the contract.

H.8 FAR 52.236-8 OTHER CONTRACTS (APR 1984)

The Government may undertake or award other contracts for additional work at or near the site of work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.

H.9 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

H.10 FAR 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

(a) The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.

(b) Temporary buildings (e.g. storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

(c) Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

(d) The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work,

(e) vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks,the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

H.11 FAR 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

(a) The Government shall have the right to take possession of or use any completed or partially completed part of the work. Before taking possession of or using any work, the Contracting Officer shall furnish the Contractor a list of items of work remaining to be performed or corrected on those portions of the work that the Government intends to take possession of or use. However, failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government’s possession or use shall not be deemed an acceptance of any work under the contract.

(b) While the Government has such possession or use, the Contractor shall be relieved of the responsibility for the loss of or damage to the work resulting from the Government’s possession or use, notwithstanding the terms of the clause in this contract entitled “Permits and Responsibilities.” If prior possession or use by the Government delays the progress of the work or causes additional expense to the Contractor, an equitable adjustment shall be made in the contract price or the time of completion, and the contract shall be modified in writing accordingly.

H.12 FAR 52.236-12 CLEANING UP (APR 1984)

The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.

H.13 FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)

(a) The Contractor shall provide and maintain work environments and procedures which will—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract.

(b)For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1)Provide appropriate safety barricades, signs, and signal lights;
(2)Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3)Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.

H.14 FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer, may require the Contractor to increase the number of shifts, overtime operations, dates of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

H.15 FAR 52.236-17 LAYOUT OF WORK (APR 1984)

The Contractor shall lay out its work from Government-established base lines and bench marks indicated on the drawings, and shall be responsible for all measurements in connection with the layout.