DRAFTTouchetCorralDwgs.pdf

PDF 3 MB Posted

Attached to
Touchet Corral Culvert Replacement Project Federal contract opportunity
Solicitation number
AG-04M3-S-10-0006
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Touchet Corral Culvert Replacement Project, newest first.
File Type Posted
6.FireProtectionandSuppressionr6_fS_6300_52.rtf RTF text file
1.ReturnPacket.rtf RTF text file
4.TouchetCorralDwgs.pdf PDF
8.AdditionalFireCommunications.doc DOC document
3.TouchetCorralSpecs.pdf PDF
5.GeneralDecisionWA1_dvb.htm HTM file
2.AG-04M3-S-10-0006.rtf RTF text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

Point # Description Northing Easting Elevation (ft) CP1 Rebar w/FS Cap 10,000.00 5,000.00 100.00 CP2 Rebar w/FS Cap 10,076.79 5,076.79 89.21 CP3 Rebar w/FS Cap 9,965.99 4,838.01 116.50 CP4 Sta 0+00 on 700RD 10,087.68 4,925.19 108.30

Control Point Information

ITEM DESCRIPTION MEASURE

ESTIMATED

QUANTITY

Remarks

15101 Mobilization Lump Sum All

15201 Construction survey and staking Lump Sum All Includes Staking roadway stations, structure location, and stream channel construction.

15713 Soil Erosion & Pollution Control Lump Sum All Includes the installation, operation, maintenance, and removal of all dewatering implementations and erosion & pollution control devices (i.e. silt fence, hay bales, etc.)

20304 Removal of existing culvert Lump Sum All Removed culvert becomes the property of contractor and shall be removed from government property.

20801 Structure excavation Cubic Yard 700 Includes excavation required to remove existing culvert and to install new structure.

30805 Bedding and backfill aggregate, compaction method B Cubic Yard 22 Includes finishing approaches to structure.

60205 20 foot clear span bridge, 20 feet wide, with minimum distance of

9.5 feet from thalwag to bottom of deck precast reinforced concrete box culvert

Lump Sum All Includes pre−cast deck, footers, wingwalls, curbs, and all structural appurtances (i.e. rebar bolts, pads, etc.).

64802 Placed fish rest stop rock, FRS class 1, method A Each 3 See sheet #7 for stream modeling steps.

64804 Placed Streambed simulation rock, bed class 8 & 12 method A Cubic Yard 200

SCHEDULE OF ITEMS

Proportions Class 8 Class 12 1 Unit 8"−22" 12"−30" 2 Units 3"−8" 5"−12" 2 Units 1"−3" 1½"−5" 1 Unit 1/16"−1" 1/16"−1½"

Streambed Simulation Rock

Station Easting Northing Elevation To Left Edge (ft)

Left Elevation

To Right

Right Elevevation

0+27.30 4946.3468 10070.4210 108.146 9.5 107.956 9.7 107.952 0+35.44 4951.6775 10064.2898 106.867 7 106.727 7 106.727 0+50.00 4959.2612 10052.1051 104.621 7 104.481 7 104.481 0+60.08 4964.5559 10043.5930 103.03 8.5 102.86 8.5 102.86 0+70.43 4970.0523 10034.7601 102.517 9 102.517 9 102.517 0+93.22 4981.6763 10016.0812 102.517 9 102.517 9 102.517 1+00.00 4984.4999 10009.0340 102.517 1+25.00 4988.3877 9999.9329 101.557 1+44.73 5003.0612 9968.3369 102.184 1+59.06 5011.6005 9956.8795 103.408

Road Alignment Stationing

Road grading on southeast side approach of road shall feather into existing road.

File details come from the government source that posted it. Updated .