B. AG-04M3-S-08-0065.rtf
RTF text file 2 MB Posted
- Attached to
- Gilman Flat & Sheep Fence Reconstruction, Umatilla National Forest, Heppner Ranger District
- Solicitation number
- AG-04M3-S-08-0065
About this file
B. Solicitation
Text of this file
REQUEST FOR QUOTATION
PAGE OF PAGES
(THIS IS NOT AN ORDER)
THIS RFQ
X
IS
IS Not 100% HUBZONE SET- ASIDE
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
AG-04M3-S-08-0065
8-14-2008 149538 UNDER BDSA REG. 2 ä
AND/OR DMS REG. 1
5a. ISSUED BY
6. DELIVER BY (Date) Wallowa-Whitman National Forest 1550 Dewey Ave Baker City OR 97814 See contract time.
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FOB DESTINATION
NAME
TELEPHONE NUMBER
X OTHER (See Schedule)
Marilyn Johnson, Technical
AREA CODE
NUMBER
278-3785
9. DESTINATION
Sue Domina, Contracting Officer 523-1263
a. NAME OF CONSIGNEE
8. TO:
Heppner Ranger District
a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
Heppner
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
OR
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the September 12, 2008 4:30 p.m.
submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
Sheep & Gilman Flat Fence Reconstruction Project, Heppner Ranger District, Umatilla National Forest
DUNS: ___________________________
This is 100% set-aside for HubZone.
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT ä
NUMBER
PERCENTAGE
NOTE: Additional provisions and representations X are are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE
c. COUNTY
AREA CODE
d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER
NSN 7540-01-152-8084
Previous edition not usable 18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a) Sheep & Gilman Flat Fence Reconstruction Solicitation No.: AG-04M3-S-08-0065 Unit: Heppner Ranger District
Supplies or Services and Prices/Costs Schedule of Items
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
PAY
UNIT
UNIT
PRICE
AMOUNT
Sheep Fence Reconstruction mi
Option Items
2A Sheep Extension Reconstruction mi 2B Gilman Flat Reconstruction mi
Total Quote
AWARD IS BASED ON AVAILABILITY OF FUNDS FOR OPTION ITEMS
Description/Specifications/Statement of Work
Description of Work
Item 1: Sheep Fence Removal and Reconstruction Project is approximately 1 mile. This project involves the removal of the existing barbed wire and woven wire fencing and replacement with 3-barbed wire fencing supported by rockjack(s) and /or steel “T” post. No separate payment shall be made for clearing of the fenceline right of way; payment is incidental to the item.
Option Item 2A: Sheep Fence Extension Project is approximately 1 mile. This project involves the removal of the existing barbed wire and woven wire fencing and replacement with 3-barbed wire fencing supported by rockjack(s) and /or steel “T” post. No separate payment shall be made for clearing of the fenceline right of way; payment is incidental to the item.
Option Item 2B: The Gilman Flat Fence Removal and Reconstruction is approximately 3 miles; This project involves the removal of the existing barbed wire and woven wire fencing and replacement with 3-barb wire fencing supported by rockjack(s) and /or steel “T” post. No separate payment shall be made for clearing of the fence line right of way; payment is incidental to the item.
Project Location
Item 1: Sheep Fence Removal and Reconstruction Project is located in T. 06S, R 27E, sections 8, 17, 20, 21 and 28. Access to the project is on Forest Roads 2120 and 2202. Note: This fence is within an active cattle allotment: Cattle may be in the allotment from June 1st through October 15th.
Option item 2A: Sheep Fence Extension Project is located in T. 06S, R 27E, sections 8, 17, 20, 21 and 28. Access to the project is on Forest Roads 2120 and 2202. Note: This fence is within an active cattle allotment: Cattle may be in the allotment from June 1st through October 15th.
Option 2B: Gilman Flat Fence Removal and Reconstruction is located in T. 06S, R. 28E, sections 21,28, and 33, and is accessible from Forest Roads 2100, 2110, 2104, and 2104-120 A portion of Rd 2110 accessing the south end of this project, and Rd 2104-120 are seasonally closed to motorized vehicles from December 1st thru April 15th. Non-motorized access is allowed. Note: This fence is within an active cattle allotment: Cattle may be in the allotment from June 1st through October 15th.
Contractor is responsible for keeping cattle from going through the fences during removal and reconstruction.
Price Range
This project is estimated between $25,000 and $100,000.
Applicable Specifications (CSI Projects)
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.
452.211-72 Statement of Work/Specifications. (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Packaging and Marking
(There are no provisions or clauses for this section)
Inspection and Acceptance
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far
52.246-1 Contractor Inspection Requirements. (APR 1984)
52.246-12 Inspection of Construction. (APR 1996)
Inspection
Government shall visually inspect the work for compliance with the contract. Contractor responsible for removing deficient fence segments and reconstructing to specifications.
Deliveries or Performance
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far
52.242-14 Suspension of Work. (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than November 29, 2009. The time stated for completion shall include final cleanup of the premises.
OPTION ITEM 2B: If awarded, Gilman Flat Fence Removal and Reconstruction project shall be completed by July 15, 2009.
Work is estimated to start September 30, 2008.
Contract Administration Data
452.215-73 Postaward Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 5 days after the date of contract award. The conference will be held at: Heppner Ranger District in Heppner, Oregon or other mutually agreed to location.
Government Furnished Property
The Government will provide the following items of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No.
Property Description Property Value Qty Location Date Available
Barbed Wire $5400.00 60 rolls Tupper WC Time of Award
Nails/Staples 5boxes each
Rock Jack Materials
Wood Stays Materials can be picked up Monday through Friday from 8:00 a.m to 4:00 p.m. at Tupper Work Center. Call ahead to pick up materials – designated contacts will be provided at Prework conference.
Product Substitution
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
Measurement and Payment
The total distance of each item is an estimate. The starting and end points for the project are identified with RED flagging. Contractor should verify distances and bid accordingly. Payment method of measure is mile.
Payment shall be made on fence distance completed by contractor and upon acceptance by the government.
If fence or portions of fence are not constructed to specifications, contractor shall rework and payment shall be after deficiencies are corrected:
Special Contract Requirements
Safety
Contractor shall provide a written, job-specific safety plan at the pre-work conference for review, identifying and describing any inherently hazardous conditions along with specific actions to mitigate these hazards.
Contractor and their employees shall adhere to all safety regulations and guidelines applicable to this type of work. It is the contractor’s responsibility to know applicable safety regulations and recommended practices for this type of work. The following are hazards identified, but not all inclusive, when conducting fence construction:
Log trucks and other vehicle traffic on forest roads.
Working with hand tools Yellow jacket and bee stings Hazardous snags Chain saw and auger operation Uneven, rocky terrain for walking or using ATVs
Emergency Response (AGAR 452.236-77) (NOV 1996)
(a) Contractor’s Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of existing vegetation, structures, equipment, utilities, and improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contactor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes clause, FAR 52.243-4.
(NOTE: See Fire Plan Requirements referenced in the attachments.)
Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
Contractor’s Use of Existing Roads
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
Traffic Control
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administrations and applicable safety codes.
The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
Order of Precedence --Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
| (1) | The Schedule (excluding the specifications). |
| (2) | Representations and other instructions. |
| (3) | Contract clauses. |
| (4) | Other documents, exhibits, and attachments. |
| (5) | Special Project Specifications. |
| (6) | Standard Specifications, (including FAR clauses). |
| (7) | (a) | Drawings, figured dimensions over scaled dimensions. |
| (b) | Drawings, large scale contract drawings over small scale contract drawings. | |
| (c) | Schedules on contract drawings over any conflicting notations on contract drawings. | |
| (8) | Shop drawings. |
Contract Clauses
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far
52.204-7 Central Contractor Registration. (APR 2008) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006) 52.222-3 Convict Labor. (JUN 2003) 52.222-6 Davis-Bacon Act. (JUL 2005) 52.222-7 Withholding of Funds. (FEB 1988) 52.222-8 Payrolls and Basic Records. (FEB 1988) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (JUL 2005) 52.222-12 Contract Termination - Debarment. (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (FEB 1988) 52.222-21 Prohibition of Segregated Facilities. (FEB 1999) 52.222-26 Equal Opportunity. (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans. (SEP 2006) 52.222-36 Affirmative Action for Workers with Disabilities. (JUN 1998) 52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans. (SEP 2006) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (DEC 2007) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2006) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995) 52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002) 52.232-18 Availability of Funds. (APR 1984) 52.232-23 Assignment of Claims. (JAN 1986) 52.232-27 Prompt Payment For Construction Contracts. (SEP 2005) 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003) 52.233-1 Disputes. (JUL 2002) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.243-5 Changes and Changed Conditions. (APR 1984) 52.246-21 Warranty of Construction. (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991)
452.236-72 Use of Premises. (NOV 1996) 452.236-73 Archaeological or Historic Sites. (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
52.219-3 Notice of Total HUBZone Set-Aside. (JAN 1999)
(a) Definition. "HUBZone small business concern," as used in this clause, means a small business concern that appears on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration.
(b) General. (1) Offers are solicited only from HUBZone small business concerns. Offers received from concerns that are not HUBZone small business concerns shall not be considered.
(2) Any award resulting from this solicitation will be made to a HUBZone small business concern.
(c) Agreement. A HUBZone small business concern agrees that in the performance of the contract, in the case of a contract for -
(1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other HUBZone small business concerns;
(2) Supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other HUBZone small business concerns;
(3) General construction, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other HUBZone small business concerns; or
(4) Construction by special trade contractors, at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other HUBZone small business concerns.
(d) A HUBZone joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (c) of this clause will be performed by the HUBZone small business participant or participants.
(e) A HUBZone small business concern nonmanufacturer agrees to furnish in performing this contract only end items manufactured or produced by HUBZone small business manufacturer concerns. This paragraph does not apply in connection with construction or service contracts.
52.228-13 Alternative Payment Protections. (JUL 2000)
(a) The Contractor shall submit one of the following payment protections:
Payment & Performance Bonds Irrevocable Letter of Credit Certificates of Deposit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 calendar days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
52.228-14 Irrevocable Letter of Credit. (DEC 1999)
(a) Irrevocable letter of credit (ILC), as used in this clause, means a written commitment by a federally insured financial institution to pay all or part of a stated amount of money, until the expiration date of the letter, upon presentation by the Government (the beneficiary) of a written demand therefor. Neither the financial institution nor the offeror/Contractor can revoke or condition the letter of credit.
(b) If the offeror intends to use an ILC in lieu of a bid bond, or to secure other types of bonds such as performance and payment bonds, the letter of credit and letter of confirmation formats in paragraphs (e) and (f) of this clause shall be used.
(c) The letter of credit shall be irrevocable, shall require presentation of no document other than a written demand and the ILC (including confirming letter, if any), shall be issued/confirmed by an acceptable federally insured financial institution as provided in paragraph (d) of this clause, and -
(1) If used as a bid guarantee, the ILC shall expire no earlier than 60 days after the close of the bid acceptance period;
(2) If used as an alternative to corporate or individual sureties as security for a performance or payment bond, the offeror/Contractor may submit an ILC with an initial expiration date estimated to cover the entire period for which financial security is required or may submit an ILC with an initial expiration date that is a minimum period of one year from the date of issuance. The ILC shall provide that, unless the issuer provides the beneficiary written notice of non-renewal at least 60 days in advance of the current expiration date, the ILC is automatically extended without amendment for one year from the expiration date, or any future expiration date, until the period of required coverage is completed and the Contracting Officer provides the financial institution with a written statement waiving the right to payment. The period of required coverage shall be:
(i) For contracts subject to the Miller Act, the later of -
(A) One year following the expected date of final payment;
(B) For performance bonds only, until completion of any warranty period; or
(C) For payment bonds only, until resolution of all claims filed against the payment bond during the one-year period following final payment.
(ii) For contracts not subject to the Miller Act, the later of -
(A) 90 days following final payment; or
(B) For performance bonds only, until completion of any warranty period.
(d) Only federally insured financial institutions rated investment grade or higher shall issue or confirm the ILC. The offeror/Contractor shall provide the Contracting Officer a credit rating that indicates the financial institution has the required rating(s) as of the date of issuance of the ILC. Unless the financial institution issuing the ILC had letter of credit business of at least $25 million in the past year, ILCs over $5 million must be confirmed by another acceptable financial institution that had letter of credit business of at least $25 million in the past year.
(e) The following format shall be used by the issuing financial institution to create an ILC:
Issuing Financial Institution's Letterhead or Name and Address
Issue Date __________
Irrevocable Letter of Credit No. __________
Account party's name ___________
Account party's address __________
For Solicitation No. ___________ (for reference only)
To: (U.S. Government agency)
(U.S. Government agency's address)
1. We hereby establish this irrevocable and transferable Letter of Credit in your favor for one or more drawings up to United States $______. This Letter of Credit is payable at (issuing financial institutions and, if any, confirming financial institutions) office at (issuing financial institutions address and, if any, confirming financial institutions address) and expires with our close of business on ___________, or any automatically extended expiration date.
2. We hereby undertake to honor your or the transferees sight draft(s) drawn on the issuing or, if any, the confirming financial institution, for all or any part of this credit if presented with this Letter of Credit and confirmation, if any, at the office specified in paragraph 1 of this Letter of Credit on or before the expiration date or any automatically extended expiration date.
3. (This paragraph is omitted if used as a bid guarantee, and subsequent paragraphs are renumbered.) It is a condition of this Letter of Credit that it is deemed to be automatically extended without amendment for one year from the expiration date hereof, or any future expiration date, unless at least 60 days prior to any expiration date, we notify you or the transferee by registered mail, or other receipted means of delivery, that we elect not to consider this Letter of Credit renewed for any such additional period. At the time we notify you, we also agree to notify the account party (and confirming financial institution, if any) by the same means of delivery.
4. This Letter of Credit is transferable. Transfers and assignments of proceeds are to be effected without charge to either the beneficiary or the transferee/assignee of proceeds. Such transfer or assignment shall be only at the written direction of the Government (the beneficiary) in a form satisfactory to the issuing financial institution and the confirming financial institution, if any.
5. This Letter of Credit is subject to the Uniform Customs and Practice (UCP) for Documentary Credits, 1993 Revision, International Chamber of Commerce Publication No. 500, and to the extent not inconsistent therewith, to the laws of _____________________ (state of confirming financial institution, if any, otherwise state of issuing financial institution).
6. If this credit expires during an interruption of business of this financial institution as described in Article 17 of the UCP, the financial institution specifically agrees to effect payment if this credit is drawn against within 30 days after the resumption of our business.
Sincerely, (Issuing financial institution)
(f) The following format shall be used by the financial institution to confirm an ILC:
(Confirming Financial Institution's Letterhead or Name and Address)
(Date)
Our Letter of Credit Advice Number _____________
Beneficiary: ___________ (U.S. Government agency)
Issuing Financial Institution: __________________
Issuing Financial Institution's LC No.: ___________
Gentlemen:
1. We hereby confirm the above indicated Letter of Credit, the original of which is attached, issued by __________ (name of issuing financial institution) for drawings of up to United States dollars ___________/U.S. $_______ and expiring with our close of business on _____________ (the expiration date), or any automatically extended expiration date.
2. Draft(s) drawn under the Letter of Credit and this Confirmation are payable at our office located at ___________________.
3. We hereby undertake to honor sight draft(s) drawn under and presented with the Letter of Credit and this Confirmation at our offices as specified herein.
4. (This paragraph is omitted if used as a bid guarantee, and subsequent paragraphs are renumbered.) It is a condition of this confirmation that it be deemed automatically extended without amendment for one year from the expiration date hereof, or any automatically extended expiration date, unless:
(a) At least 60 days prior to any such expiration date, we shall notify the Contracting Officer, or the transferee and the issuing financial institution, by registered mail or other receipted means of delivery, that we elect not to consider this confirmation extended for any such additional period; or
(b) The issuing financial institution shall have exercised its right to notify you or the transferee, the account party, and ourselves, of its election not to extend the expiration date of the Letter of Credit.
5. This confirmation is subject to the Uniform Customs and Practice (UCP) for Documentary Credits, 1993 Revision, International Chamber of Commerce Publication No. 500, and to the extent not inconsistent therewith, to the laws of ________ (state of confirming financial institution).
6. If this confirmation expires during an interruption of business of this financial institution as described in Article 17 of the UCP, we specifically agree to effect payment if this credit is drawn against within 30 days after the resumption of our business. Sincerely, (Confirming financial institution)
(g) The following format shall be used by the Contracting Officer for a sight draft to draw on the Letter of Credit:
Sight draft
| ________________________ |
| (City, State) |
(Date)___________________ (Name and address of financial institution)
Pay to the order of ______________ (Beneficiary Agency) ___________ the sum of United States $____________. This draft is drawn under Irrevocable Letter of Credit No. ______________.
| ___________________ |
| (Beneficiary Agency) |
| ____________________ |
| (By) |
52.245-1 Government Property. (JUN 2007)
(a) Definitions. As used in this clause--
"Acquisition cost" means the cost to acquire a tangible capital asset including the purchase price of the asset and costs necessary to prepare the asset for use. Costs necessary to prepare the asset for use include the cost of placing the asset in location and bringing the asset to a condition necessary for normal or expected use.
"Cannibalize" means to remove serviceable parts from one item of equipment in order to install them on another item of equipment.
"Contractor-acquired property" means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.
"Contractor inventory" means--
(1) Any property acquired by and in the possession of a Contractor or subcontractor under a contract for which title is vested in the Government and which exceeds the amounts needed to complete full performance under the entire contract;
(2) Any property that the Government is obligated or has the option to take over under any type of contract, e.g., as a result either of any changes in the specifications or plans thereunder or of the termination of the contract (or subcontract thereunder), before completion of the work, for the convenience or at the option of the Government; and
(3) Government-furnished property that exceeds the amounts needed to complete full performance under the entire contract.
"Contractor's managerial personnel" means the Contractor's directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of--
(1) All or substantially all of the Contractor's business;
(2) All or substantially all of the Contractor's operation at any one plant or separate location; or
(3) A separate and complete major industrial operation.
"Demilitarization" means rendering a product unusable for, and not restorable to, the purpose for which it was designed or is customarily used.
"Discrepancies incident to shipment" means any differences (e.g., count or condition) between the items documented to have been shipped and items actually received.
"Equipment" means a tangible asset that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use.
"Government-furnished property" means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract.
"Government property" means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property.
"Material" means property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling and special test equipment.
"Nonseverable" means property that cannot be removed after construction or installation without substantial loss of value or damage to the installed property or to the premises where installed.
"Plant equipment" as used in this part, means personal property of a capital nature (including equipment, machine tools, test equipment, furniture, vehicles, and accessory and auxiliary items) for use in manufacturing supplies, in performing services, or for any administrative or general plant purpose. It does not include special tooling or special test equipment.
"Precious metals" means silver, gold, platinum, palladium, iridium, osmium, rhodium, and ruthenium.
"Property" means all tangible property, both real and personal.
"Property Administrator" means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
"Provide" means to furnish, as in Government-furnished property, or to acquire, as in contractor-acquired property.
"Real property" means land and rights in land, ground improvements, utility distribution systems, and buildings and other structures. It does not include foundations and other work necessary for installing special tooling, special test equipment, or plant equipment.
"Sensitive property" means property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.
"Surplus" property means excess personal property not required by any Federal agency as determined by the Administrator of the "General" Services Administration (GSA).
(b) Property management. (1) The Contractor shall have a system to manage (control, use, preserve, protect, repair and maintain) Government property in its possession. The system shall be adequate to satisfy the requirements of this clause. In doing so, the Contractor shall initiate and maintain the processes, systems, procedures, records, and methodologies necessary for effective control of Government property, consistent with voluntary consensus standards and/or industry-leading practices and standards for Government property management except where inconsistent with law or regulation. During the period of performance, the Contractor shall disclose any significant changes to their property management system to the Property Administrator prior to implementation.
(2) The Contractor's responsibility extends from the initial acquisition and receipt of property, through stewardship, custody, and use until formally relieved of responsibility by authorized means, including delivery, consumption, expending, disposition, or via a completed investigation, evaluation, and final determination for lost, damaged, destroyed, or stolen property. This requirement applies to all Government property under the Contractor's accountability, stewardship, possession or control, including its vendors or subcontractors (see paragraph (f)(1)(v) of this clause).
(3) The Contractor shall include the requirements of this clause in all subcontracts under which Government property is acquired or furnished for subcontract performance.
(c) Use of Government property. The Contractor shall use Government property, either furnished or acquired under this contract, only for performing this contract, unless otherwise provided for in this contract or approved by the Contracting Officer. The Contractor shall not modify, cannibalize, or make alterations to Government property unless this contract specifically identifies the modifications, alterations or improvements as work to be performed.
(d) Government-furnished property. (1) The Government shall deliver to the Contractor the Government-furnished property described in this contract. The Government shall furnish related data and information needed for the intended use of the property. The warranties of suitability of use and timely delivery of Government-furnished property do not apply to property acquired or fabricated by the Contractor as contractor-acquired property and subsequently transferred to another contract with this Contractor.
(2) The delivery and/or performance dates specified in this contract are based upon the expectation that the Government-furnished property will be suitable for contract performance and will be delivered to the Contractor by the dates stated in the contract.
(i) If the property is not delivered to the Contractor by the dates stated in the contract, the Contracting Officer shall, upon the Contractor's timely written request, consider an equitable adjustment to the contract.
(ii) In the event property is received by the Contractor, or for Government-furnished property after receipt and installation, in a condition not suitable for its intended use, the Contracting Officer shall, upon the Contractor's timely written request, advise the Contractor on a course of action to remedy the problem. Such action may include repairing, replacing, modifying, returning, or otherwise disposing of the property at the Government's expense. Upon completion of the required action(s), the Contracting Officer shall consider an equitable adjustment to the contract (see also paragraph (f)(1)(ii)(A) of this clause).
(iii) The Government may, at its option, furnish property in an "as-is" condition. The Contractor will be given the opportunity to inspect such property prior to the property being provided. In such cases, the Government makes no warranty with respect to the serviceability and/or suitability of the property for contract performance. Any repairs, replacement, and/or refurbishment shall be at the Contractor's expense.
(3)(i) The Contracting Officer may by written notice, at any time--
(A) Increase or decrease the amount of Government-furnished property under this contract;
(B) Substitute other Government-furnished property for the property previously furnished, to be furnished, or to be acquired by the Contractor for the Government under this contract; or
(C) Withdraw authority to use property.
(ii) Upon completion of any action(s) under paragraph (d)(3)(i) of this clause, and the Contractor's timely written request, the Contracting Officer shall consider an equitable adjustment to the contract.
(e) Title to Government property. (1) The Government shall retain title to all Government-furnished property. Title to Government property shall not be affected by its incorporation into or attachment to any property not owned by the Government, nor shall Government property become a fixture or lose its identity as personal property by being attached to any real property.
(2) Fixed-price contracts. (i) All Government-furnished property and all property acquired by the Contractor, title to which vests in the Government under this paragraph (collectively referred to as "Government property)", are subject to the provisions of this clause.
(ii) Title to each item of equipment, special test equipment and special tooling acquired by the Contractor for the Government under this contract shall pass to and vest in the Government when its use in performing this contract commences or when the Government has paid for it, whichever is earlier, whether or not title previously vested in the Government.
(iii) If this contract contains a provision directing the Contractor to purchase material for which the Government will reimburse the Contractor as a direct item of cost under this contract--
(A) Title to material purchased from a vendor shall pass to and vest in the Government upon the vendor's delivery of such material; and
(B) Title to all other material shall pass to and vest in the Government upon--
(1) Issuance of the material for use in contract performance;
(2) Commencement of processing of the material or its use in contract performance; or
(3) Reimbursement of the cost of the material by the Government, whichever occurs first.
(3) Title under Cost-Reimbursement or Time-and-Material Contracts or Cost-Reimbursable contract line items under Fixed-Price contracts. (i) Title to all property purchased by the Contractor for which the Contractor is entitled to be reimbursed as a direct item of cost under this contract shall pass to and vest in the Government upon the vendor's delivery of such property.
(ii) Title to all other property, the cost of which is reimbursable to the Contractor, shall pass to and vest in the Government upon--
(A) Issuance of the property for use in contract performance;
(B) Commencement of processing of the property for use in contract performance; or
(C) Reimbursement of the cost of the property by the Government, whichever occurs first.
(iii) All Government-furnished property and all property acquired by the Contractor, title to which vests in the Government under this paragraph (e)(3)(iii) (collectively referred to as "Government property)", are subject to the provisions of this clause.
(f) Contractor plans and systems. (1) Contractors shall establish and implement property management plans, systems, and procedures at the contract, program, site or entity level to enable the following outcomes:
(i) Acquisition of Property. The Contractor shall document that all property was acquired consistent with its engineering, production planning, and material control operations.
(ii) Receipt of Government Property. The Contractor shall receive Government property (document the receipt), record the information necessary to meet the record requirements of paragraph (f)(1)(iii)(A)(1) through (5) of this clause, identify as Government owned in a manner appropriate to the type of property (e.g., stamp, tag, mark, or other identification), and manage any discrepancies incident to shipment.
(A) Government-furnished property. The Contractor shall furnish a written statement to the Property Administrator containing all relevant facts, such as cause or condition and a recommended course(s) of action, if overages, shortages, or damages and/or other discrepancies are discovered upon receipt of Government-furnished property.
(B) Contractor-acquired property. The Contractor shall take all actions necessary to adjust for overages, shortages, damage and/or other discrepancies discovered upon receipt, in shipment of Contractor-acquired property from a vendor or supplier, so as to ensure the proper allocability and allowability of associated costs.
(iii) Records of Government property. The Contractor shall create and maintain records of all Government property accountable to the contract, including Government-furnished and Contractor-acquired property.
(A) Property records shall enable a complete, current, auditable record of all transactions and shall, unless otherwise approved by the Property Administrator, contain the following:
(1) The name, part number and description, manufacturer, model number, and National Stock Number (if needed for additional item identification tracking and/or disposition).
(2) Quantity received (or fabricated), issued, and balance-on-hand.
(3) Unit acquisition cost.
(4) Unique-item identifier or equivalent (if available and necessary for individual item tracking).
(5) Unit of measure.
(6) Accountable contract number or equivalent code designation.
(7) Location.
(8) Disposition.
(9) Posting reference and date of transaction.
(10) Date placed in service.
(B) Use of a Receipt and Issue System for Government Material. When approved by the Property Administrator, the Contractor may maintain, in lieu of formal property records, a file of appropriately cross-referenced documents evidencing receipt, issue, and use of material that is issued for immediate consumption.
(iv) Physical inventory. The Contractor shall periodically perform, record, and disclose physical inventory results. A final physical inventory shall be performed upon contract completion or termination. The Property Administrator may waive this final inventory requirement, depending on the circumstances (e.g., overall reliability of the Contractor's system or the property is to be transferred to a follow-on contract).
(v) Subcontractor control. (A) The Contractor shall award subcontracts that clearly identify assets to be provided and shall ensure appropriate flow down of contract terms and conditions (e.g., extent of…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2.rtf | RTF text file | |
| Amendment_1.rtf | RTF text file | |
| C. Maps.pdf | ||
| D. Exhibits1-2-3-4-12.pdf | ||
| A. Bidder spacket.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .