a. amend2.doc

DOC document 201 KB Posted

Attached to
Reynolds Creek Culvert Replacements - Malheur National Forest
Solicitation number
AG-04KK-S-10-0006
Issued by

About this file

AG-04KK-S-10-0006 Amendment 2

View the file

Other files

File Type Posted
b. rey3_dwg.pdf PDF
a. amend1.doc DOC document
b. BiddersPacket0006.docx DOCX document
l. SF-25B.pdf PDF
a. AG-04KK-S-10-0006.docx DOCX document
i. SF-24.pdf PDF
k. SF-25A.pdf PDF
h. Experience.Questionnaire.doc DOC document
f. OR2_dvb.mht MHT file
e. AOP Conservation Measures.docx DOCX document
j. SF-25.pdf PDF
g. 19_r6_fs_6300_52.doc DOC document
d. rey_dwg_cor.pdf PDF
c. FSSS.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-04KK-S-10-0006

Reynolds Creek Culvert Replacements—Amendment 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE
PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

08/30/2010

4. REQUISITION/PUCHASE REQ. NO.
5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Malheur National Forest PO Box 909, John Day, OR 97845

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)
X
9A.Amend Solicitation. AG-04KK-S-10-0006

9B.Dated 09/10/2010

10A.Mod Contract/Order

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Reynolds Creek Culvert Replacements—Malheur National Forest This amendment is to change some of the specifications/estimated quantities on the Schedule of Items. Please replace the existing page 5-7 of 38 of the solicitation with the attached and pages 4-6of 16 of the bidder’s packet with the attached pages. Also, please replace the existing drawings with the separately attached drawings. The pages that have specifically changed in the drawings are 3, 5, 6, 10, 11, and 12.

All changes are indicated by vertical lines in the left margin.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243 This page has intentionally been left blank.

1. Section B—Supplies or Services and Prices/Costs Schedule of Items

B- 1 - SCHEDULE OF ITEMS

REYNOLDS 1

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum All

15713

Soil Erosion & Pollution Control

Lump Sum All

20104

Clearing and grubbing, disposal of tops and limbs_f__, logs_i__, stumps_f__

Acre
0.5

20304

Removal_culvert

Lump Sum All

20401

Roadway excavation, compaction method B

CY*

25101

Placed Riprap, Class 5

CY*

32211

Aggregate surface course, compaction method B

CY*

60101

Concrete, method _A__

CY*

60352

_16 ft_span, _7.5 ft__rise, structural plate arch

Foot

62501

Seeding, Dry Method with mulch

Acre 0.5

63501
Temporary Traffic Control
Lump Sum
All
$________
$________
64803
Placed channel rock, CR class 20, method A
Lump Sum
All
$________
$________

64804

Placed Streambed simulation rock, bed class _6_, method _A_

CY*
140
$________
$________

64806

Foundation fill

Lump Sum All

TOTAL: $________________

* Denotes Contract Quantity per FP-03 109.02 (b)

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: Only one award will be made as a result of this solicitation.

TIN: ________________________

DUNS: ______________________

Offeror’s Signature

Offeror’s Name and Phone Number

NORTH FORK REYNOLDS 1

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Lump Sum All

Lump Sum All

Acre
0.5

Lump Sum All

CY*

CY*

CY*

CY*

_18 ft_span, _8 ft__rise, structural plate arch

Foot

Acre 0.5

63501
Temporary Traffic Control
Lump Sum
All
$________
$________
64803
Placed channel rock, CR class 20, method A
Lump Sum
All
$________
$________
CY*
187
$________
$________

Lump Sum All

64852
Haul and place logs and rootwads
Ea
3

TOTAL: $_________________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: Only one award will be made as a result of this solicitation.

TIN: ________________________

NORTH FORK REYNOLDS 2

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Lump Sum All

Lump Sum All

Acre
0.5

Lump Sum All

CY*

CY*

CY*

CY*

_14 ft_span, _7 ft__rise, structural plate arch

Foot

Acre 0.5

63501
Temporary Traffic Control
Lump Sum
All
$________
$________
64803
Placed channel rock, CR class 20, method A
Lump Sum
All
$________
$________
CY*
145
$________
$________

Lump Sum All

64852
Haul and place logs and rootwads
Ea
3
$________
$________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: Only one award will be made as a result of this solicitation.

TIN: ________________________

2. Section B—Supplies or Services and Prices/Costs Schedule of Items

B- 1 - SCHEDULE OF ITEMS

REYNOLDS 1

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Lump Sum All

Lump Sum All

Acre
0.5

Lump Sum All

CY*

CY*

CY*

CY*

_16 ft_span, _7.5 ft__rise, structural plate arch

Foot

Acre 0.5

63501
Temporary Traffic Control
Lump Sum
All
$________
$________
64803
Placed channel rock, CR class 20, method A
Lump Sum
All
$________
$________
CY*
140
$________
$________

Lump Sum All

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: Only one award will be made as a result of this solicitation.

TIN: ________________________

NORTH FORK REYNOLDS 1

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Lump Sum All

Lump Sum All

Acre
0.5

Lump Sum All

CY*

CY*

CY*

CY*

_18 ft_span, _8 ft__rise, structural plate arch

Foot

Acre 0.5

63501
Temporary Traffic Control
Lump Sum
All
$________
$________
64803
Placed channel rock, CR class 20, method A
Lump Sum
All
$________
$________
CY*
187
$________
$________

Lump Sum All

64852
Haul and place logs and rootwads
Ea
3

TOTAL: $_________________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: Only one award will be made as a result of this solicitation.

TIN: ________________________

NORTH FORK REYNOLDS 2

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Lump Sum All

Lump Sum All

Acre
0.5

Lump Sum All

CY*

CY*

CY*

CY*

_14 ft_span, _7 ft__rise, structural plate arch

Foot

Acre 0.5

63501
Temporary Traffic Control
Lump Sum
All
$________
$________
64803
Placed channel rock, CR class 20, method A
Lump Sum
All
$________
$________
CY*
145
$________
$________

Lump Sum All

64852
Haul and place logs and rootwads
Ea
3
$________
$________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: Only one award will be made as a result of this solicitation.

TIN: ________________________