Atch_5_-_Fire_clauses_r6-fs-6300-54.pdf
PDF 10 KB Posted
- Attached to
- Deschutes NF Road Closure and Decomission Federal contract opportunity
- Solicitation number
- AG-04GG-S-17-0020
About this file
Atch 5 - Additional Fire Clause
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_6_-_Fire_Plan_Template.docx | DOCX document | |
| Atch_8_-_Past_Performance_Data_Sheet.docx | DOCX document | |
| Atch_3_-_WD_77-0079.pdf | ||
| Atch_7_-_Equipment_Cleaning_Form.doc | DOC document | |
| Atch_4_-_Fire_clauses_r6-fs-6300-52.pdf | ||
| Atch_1_-_Statement_of_Work.pdf | ||
| Atch_2_-_Maps.pdf | ||
| AG-04GG-S-17-0020.pdf | ||
| STATEMENT_OF_WORK.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R6-FS-6300-54 (5/89)
USDA FOREST SERVICE
PACIFIC NORTHWEST REGION
FIRE PROTECTION AND SUPPRESSION
Additional Fire Precautionary Measure 2 - Communications
12. The contractor shall provide adequate two-way communication facilities to report a fire to
Forest Service within 15 minutes of detection. FCC Regulations prohibit commercial use of Citizen Band (CB) radios. (CB's are not considered adequate two-way communications).
Such communications shall be operable during periods of operation of power-driven equipment, including the time fire security is required. Fire Period and Closed Season
| Additional Fire Precautionary Measure 2 - Communications |
| Such communications shall be operable during periods of operation of power-driven equipment, including the time fire security is required. Fire Period and Closed Season |
File details come from the government source that posted it. Updated .