Atch_3_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- AG-04GG-S-17-0003
About this file
Drawings Atch 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_1-2__Specs.pdf | ||
| Atch_5__Fire_Clauses_r6-fs-6300-52.pdf | ||
| AG-04GG-S-17-0003.pdf | ||
| Atch_4__Wage_Decision_OR160049.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREEN RIDGE LOOKOUT WALKWAY REPLACEMENT
CONSTRUCTION PROJECT
DESCHUTES NATIONAL FOREST SISTERS RANGER DISTRICT
SHT. SHEET INDEX
1. COVER SHEET
2. VICINITY MAP
3. SITE PLAN
4. STRUCTURAL NOTES
5. STRUCTURAL NOTES CONT.
6. WALKWAY PLAN & ELEVATION
7. WALKWAY DECK
8. SUPPORT & APPROACH
9. BEARING SHOE
10. FOUNDATION
11. COLUMN & BASE
OREGON
N
BEND
PROJECT LOCATION
26 97
97 395
APPROVALS
REVIEWED BY:
/s/ PROJECT ENGINEER - Lisa Anheluk DATE
TECHNICALLY APPROVED BY:
/s/ FOREST ENGINEER - Peggy Fisher DATE
RECOMMENDED BY:
/s/ RECREATION STAFF - Amy Racki DATE
RECOMMENDED BY:
/s/ DISTRICT RANGER - Kristie Miller DATE
APPROVED BY:
/s/ FOREST SUPERVISOR - John Allen DATE
STRUCTURAL ONLY
SITE PLAN - GREEN RIDGE LOOKOUT
N
WALKWAY
TOILET
BUILDING
GREEN RIDGE
LOOKOUT
PARKING
BURIED
PROPANE LINE EXISTING WALKWAY
LENGTH: 24'
WITDH 3'
1. SIMPLY SUPPORTED ON GROUND AND TOWER CROSS BRACING AT
LOOKOUT WITH MID-SPAN SUPPORT.
2. THE HEIGHT OF WALKWAY IS APPROX. 10' AT THE FAR
SUPPORT. THE GROUND SLOPE IS APPROX. 40%.
3. A 12" PROPANE LINE IS RUN UNDER THE WALKWAY. LEAVE IN
PLACE (SUPPORT AS NECESSARY) AND REATTACH WITH EXISTING
HARDWARE WHEN NEW WALKWAY IS IN PLACE.FENCE
File details come from the government source that posted it. Updated .