amendment 1.pdf

PDF 39 KB Posted

Attached to
CRESCENT RANGER DISTRICT PARKING LOT REPAVEMENT
Solicitation number
AG-04GG-S-09-0007
Issued by

View the file

Other files

File Type Posted
Contractor Performance Data Sheet.pdf PDF
Redmond&Vicinity-CACHE GUIDE MAP.pdf PDF
Wage Determination and Fringe Benefits.pdf PDF
Offerors Return Package.pdf PDF
Solicitation.pdf PDF
Task Order Form.pdf PDF
Special Project Specifications A.pdf PDF
pub_park_11x17.pdf PDF
Sf25a_Payment Bond.pdf PDF
Contractor Performance Data Sheet.pdf PDF
vicinity map.pdf PDF
r6_fs_6300_54 fire specs for communicationdoc.pdf PDF
est_quan_11x17.pdf PDF
Solicitation.pdf PDF
r6_fs_6300_52.rtf Fire Clauses.pdf PDF
r6_fs_6300_53.Fire Tank Truck doc.pdf PDF
crackseal_11x17.pdf PDF
Wage Determination.pdf PDF
SPS Table of Contents data table.pdf PDF
Offeror's Return Packet.pdf PDF
titlesheet_11x17.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 1 SOLICITATION NO. AG-04GG-S-09-0007

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

04/06/09

4. REQUISITION/PUCHASE REQ. NO.

258640

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE

Deschutes National Forest 1001 SW Emkay Dr.

Bend, OR 97702

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) x 9A.Amend Solicitation. AG-04GG-S-09-0007

* 9B.Dated: 03/18/09

* 10A.Mod Contract/Order #

* 10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X ] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers * [ X ] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority)

The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Crescent Parking Lot Replacement *Date for receipt of quotes has been extended from April 13, 2009 to April 20, 2009 C.O.B. 4:30PM.

1) This project is changed from Small Business Set Aside to Emerging Small Business Set Aside. See attached information.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Maria D. Gonzalez, Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED 16B.UNITED STATES OF AMERICA

By_/s/ Maria D. GonzalezMaria D. GonzalezMaria D. GonzalezMaria D. Gonzalez (Signature of Contracting Officer)

16C.DATE SIGNED

04/06/09

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

This amendment corrects the set-aside standard from small business set-aside to the following:

This project is set-aside for Emerging Small Businesses as part of the Small Business Competitiveness Demonstration Program (FAR 19.10). An “emerging small business” is defined as a small business concern whose size is no greater than 50 percent of the numerical size standard applicable to the North American Industry Classification System (NAICS) code assigned to a contracting opportunity. For this solicitation, the emerging small business size standard is $16.75 million. Section K-1 Size Standard is changed from $33.5 million to $16.75 see revised amount below.

K-1 AGAR 452.219-70 SIZE STANDARD AND NAICS CODE INFORMATION (JANUARY

2005)

The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:

Contract line item(s): All --NAICS Code 237310 ______ --Size Standard $16.75 Million

The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

SCHEDULE OF ITEMS:

The schedule of items Item 60909 Wheelstop pay unit is corrected and changed from “6” to “EA” and the estimated quantity is corrected and changed from 100 to 6. In addition heading is corrected to read “Crescent Ranger District Parking Lot Replacement/Pavement”(see revised schedule of items).

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Crescent Ranger District Parking Lot Replacement/Pavement

Klamath County

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

L.S. ALL

20102

Clearing and grubbing

20305 Disposal of Material

30801

Parking excavation, compaction method 1

C.Y. 84

40401 Minor hot asphalt concrete

Ton 119

41409

Crack cleaning and sealing

L.F. 500

60909

Wheelstop

EA 6

63406

Pavement markings type A

Total Amount $____________