CompleteSolicitation.pdf

PDF 275 KB Posted

Attached to
RECOVERY: CCRD DUNE RESTORATION EUROPEAN BEACH GRASS REMOVAL PHASE 2.
Solicitation number
AG-0489-S-10-0501
Issued by

About this file

COMPLETE SOLICITATION

View the file

Other files

File Type Posted
AmendmentNo1.pdf PDF
Attachment4-Project-Map.pdf PDF
Packet-To-Return.PDF PDF
Attachment6-Project-Map.pdf PDF
Attachment5-Project-Map.pdf PDF
ContractorPerformanceDataSheet(Word-Version).doc DOC document
Attachment7-Detailed-Unit-Information-Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0489-S-10-0501

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE 1 OF 2

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 373141

2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

DATE

05/13/10

a. NAME b. TELEPHONE NUMBER(No collect calls) 8. SUGGESTED RESPONSE

DATE/

7. FOR SOLICITATION Contracting Officer:

Technical Contact: Cindy Burns:

541-225-6300 fax: 225-6220 541-902-6965

LOCAL TIME 4:00

5/26/10

INFORMATION CALL:

9. ISSUED BY CODE 10. THIS ACQUISITON IS

USDA Forest Service

UNRESTRICTED OR SET ASIDE: 100 % FOR

EROC Northwest SMALL BUSINESS EMERGING SMALL

BUSINESS

16400 Champion Way HUBZONE SMALL

NAICS: 115310 BUSINESS

Sandy, OR 97055 SERVICE-DISABLED VETERAN- 8(A) SIZE STANDARD: 7.0 Million OWNED SMALL BUSINESS

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE

16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE FACILITY

OFFEROR CODE

18a. PAYMENT WILL BE MADE BY CODE

USDA OCFO, COD, APB

PO Box 60075

New Orleans LA 70160

TELEPHONE N0.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

OFFER IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CCRD Dune Restoration European Beach Grass Removal Phase 2

Siuslaw National Forest

Central Coast R.D.

(Use Reverse and/or Attach Additional Sheets as Necessary)

See

Schedule of Items

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY DATED .. YOUR OFFER ON SOLICITATION ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: ____________________

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

MONTY BELL

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.3/2005)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

CSC

CONTINUATION OF SF1449

19.

ITEM

NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

EST.

QUANTITY

22.

UNIT

23.

UNIT

PRICE

24.

AMOUNT

1. CCRD DUNE RESTORATION EUROPEAN

BEACH GRASS REMOVAL PHASE 2

1.1 South Overlook (Scalp and bury) *

20 AC $_________ $_________

1.2 Tahkenitch Creek (Scalp and bury only)

AC $_________ $_________

1.3 South Tenmile Creek (Scalp and bury) * 23 AC $_________ $_________

1.4 North Tenmile Creek (Scalp and bury) * 10

1.5 South Sutton Beach (push to ocean beach)

AC

1.6 Berry Creek (push to ocean beach)

1.7 Tahkenitch Creek (Scalp and bury only)

(estimated total: 117 acres)

TOTAL ITEM #1:

DUNS NUMBER: ___________________________

TIN NUMBER: _____________________________

* OPTIONAL PRICING PER SUB-ITEM

Sub-Item price per acre if permit is approved, which will allow “pushing” the beach grass to the ocean as appose to the “scalp & bury” method (see attachment No. 1 for details). If the permit is approved, the following sub-item prices will replace the original pricing above and award will be based on the following pricing. If the permit is approved after award, a unilateral modification will be made to reflect these changes.

19.

ITEM

NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

EST.

QUANTITY

22.

UNIT

23.

UNIT

PRICE

24.

AMOUNT

1. CCRD DUNE RESTORATION EUROPEAN

BEACH GRASS REMOVAL PHASE 2

1.1 South Overlook (push to ocean beach)

20 AC $_________ $_________

1.3 South Tenmile Creek (push to ocean beach) 23

1.4 North Tenmile Creek (push to ocean beach)

(estimated total: 117 acres)

TOTAL ITEM #1 (*with optional pricing 1.1, 1.3, 1.4):

* ***** Submit quotes to:

Willamette NF Supervisor’s Office Attn: Lorenzo Montoya 3106 Pierce Parkway, Suite D Springfield OR 97477 fax: 541-225-6220 lrmontoya@fs.fed.us

For technical questions, contact Cindy Burns: (541) 902-6965.

The estimated start work date is October 18, 2010. All work shall be completed within _ 80 calendar days after the effective date of the Notice to Proceed.

Quotations shall be submitted for the total item. Quotations for less than the total item will not be considered.

Quoter must respond to the other factors as described under FAR 52.212-2 Evaluation – Commercial Items (Jan 1999). Award will be made on the best value for the Government.

No award will be made to a Contractor not registered in the Central Contractor Registration (CCR) database. Contractors should provide Representation and Certifications electronically at the ORCA website, http://orca.bpn.gov.

BASIS OF AWARD:

The Government will issue an order as a result of this Request for Quotations to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government, cost or price and other factors considered.

The Government may issue orders to other than the lowest quote, waive minor informalities or irregularities in quotes received, or elect to not award at all. If necessary, the Government may conduct discussions with any or all quoters.

mailto:lrmontoya@fs.fed.us� http://orca.bpn.gov/�

Continuation of SF1449 Block 27: The full text of a clause or provision may be accessed electronically at http://farsite.hill.af.mil/vffara.htm.

CONTRACT CLAUSES

ADDENDUM TO FAR 52.212-4

52.211-18 Variation of Estimated Quantity (APR 1984) 52.219-14 Limitations on Subcontracting (DEC 1996) 52.236-5 Materials and Workmanship (APR 1984) 52.242-14 Suspension of Work (APR 1984)

POST AWARD CONFERENCE (AGAR 452.215-73) (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at the Headquarters of the Siuslaw National Forest, 4077 SW Research Way, Corvallis, OR, or Central Coast/ODNRA Ranger District.

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer designates the Contracting Officer's Representative (COR). The Contracting Officer Representative for this project is:

Tim McKillop Central Coast Ranger District/Oregon Dunes National Recreation Area 541-602-0526 or 541-563-8418

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government, which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

http://farsite.hill.af.mil/vffara.htm�

SUPERINTENDENCE BY THE CONTRACTOR (FAR 52.236-6) (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

CONTRACTOR'S REPRESENTATIVE

The Government may, at its option, suspend work with full count of contract time continuing, if the Contractor fails to provide a Contractor's Representative (1) conversant in the English language and (2) able to read and understand the contract.

NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The notification shall include as a minimum:

1. The name, address, and telephone number of the subcontractor.

2. The date upon which the subcontract was entered into and its duration.

3. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Government will issue a notice to proceed on each bid item as soon as the weather and ground conditions are favorable. Contract time will start on the date specified on the notice to proceed if hand delivered, or the third day after the post office has issued a notice of Certified Mail to the Contractor.

Failure of the Contractor to pick up certified mail will not be considered an excusable delay.

The Contractor shall be required to (a) commence work under this contract within 3 calendar days after the date the Contractor receives the notice to proceed, (b) execute the work diligently, and (c) complete the entire work as mutually agreed upon times listed below

. The time stated for completion shall include final cleanup of the project sites.

A Progress Work Schedule shall be prepared by the Contractor based on priorities provided in the contract unless superseded by the Contracting Officer in advance of work.

The Contractor shall maintain progress at a rate which will ensure completion within the contract time indicated below. The minimum acceptable rate of progress will be calculated by dividing the total units of work for each bid item by contract time specified below, or as established by the approved progress schedule.

If the Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve progress; in addition the Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the contract.

The Government shall determine the order and time period of the project sites.

The C.O.R. may require the Contractor to finish the portion in progress before additional work is started on any additional portion.

Whenever weather or ground conditions are unsuitable the C.O.R will issue a verbal Suspend Order and the Contractor shall suspend work and contract time will stop for that project area. When conditions are again favorable, the COR will issue a verbal resume work order. Contract time will resume on the effective work resumption date. In all cases, the Contractor shall resume work within 3 calendar days after the effective work resumption date. It is the Contractor's responsibility to keep the COR currently advised as to where the Contractor or Contractor's Representative may be reached by phone during periods of work suspension. If the Contractor cannot be reached at the phone number provided, or if the Contractor fails to leave a number, a written resume work order will be mailed and contract time will resume on the date specified on the resume work order. The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel and equipment during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site.

PERIOD OF CONTRACT

CONTRACT TIME AND REQUIRED RATE OF PROGRESS

The Contractor will complete each item within the time allowed per item. Due to normal variations in seasonal weather conditions, it is mutually agreed that the starting date may be adjusted for each item with no adjustment in contract time or price.

Item No. District Estimated Start Work Date

Contract Time

1. Central Coast October 19, 2010 80 Calendar Days

MATERIALS AND WORKMANSHIP

(a) The Contractor shall obtain the Contracting Officer's approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(b) All work under this contract shall be performed in a skillful and workmanlike manner. The

Contracting Officer may require, in writing, that the Contractor remove from the work any employee that Contracting Officer deems incompetent, careless, or otherwise objectionable

SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements.

Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.

CONTRACTOR QUALITY CONTROL PLAN

A. Quality Control Plan

The Contractor shall maintain a Quality Control Plan (QCP). The Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract.

The QCP shall specify:

- How quality will be monitored to ensure performance standards are met.

- How the work will be supervised.

- How results of the monitoring will result in quality performance.

- Identify the personnel responsible for performing quality control.

Quality control shall include monitoring while work is in progress.

B. Contractor Quality Control Inspection

The Contractor shall assure themselves that performance meets contract specifications, in accordance with FAR 52.212-4, Contract Terms and Conditions -- Commercial Items, paragraph (a), prior to requesting the Government to inspect for payment or acceptance. The Contractor shall contact the Contracting Officer upon completion of a project area. The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.

GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

INSPECTION AND ACCEPTANCE EQUIPMENT

Pre- and post-inspections of equipment will be conducted by the COR or designated Inspector.

Additional inspection of equipment may be conducted on a regularly scheduled basis as the project progresses. Approval in writing by the COR shall be issued following the inspection.

Any equipment found not in compliance with the contract specifications will be corrected by the Contractor at no additional expense to the Government.

INSPECTION AND ACCEPTANCE OF SERVICES

The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract. Inspections will be visual and be performed at the project site. Visual inspections for acceptance or unacceptance will be based on contract specifications.

Each project area will be verified separately and not added to any other project site for acceptance.

Determination of the acceptability of the work performed will be based on the Government’s visual inspections. The Contractor or a designated representative is encouraged to observe the inspections while they are underway. Verification inspection of a project area may or may not be performed immediately following work performed.

UNSATISFACTORY WORK

The Contractor may be required to rework any area 1 acre or larger, as identified on the ground by the C.O.R. where the quality of work is unacceptable.

REINSPECTION AFTER REWORK

Reinspection after the rework will be made in the same manner as the first inspection. Inspection will be of the area that was reworked.

USE OF PREMISES

A. The Contractor shall comply with the regulations governing the operation of premises that are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.

B. Before any camp is opened or operated on National Forest land or lands administered by the Forest Service, the Contractor shall request permission (in writing) from the COR. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a camping permit will be issued.

C. It is further stipulated that in addition to clean up of any campsites, the Contractor shall remove its equipment from National Forest land before final acceptance and payment of the project.

ARCHAEOLOGICAL OR HISTORIC SITES (AGAR 452.236-73) (FEB 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

LANDSCAPE PRESERVATION

The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:

A. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government.

Unless otherwise provided, the Contractor shall confine contract operations to within the areas designated in contract documents. Unless otherwise provided in this contract, the Contractor shall gather rock, which falls outside the roadway due to contract operations and dispose of it as directed, by the Government.

B. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government. If a petroleum spill should take place in the water, the Contractor shall immediately notify the COR and the Oregon Emergency Response System (OERS), telephone 1- 800-452-0311 or 1-503-378-4124.

THREATENED, ENDANGERED, AND SENSITIVE SPECIES

Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to the Suspension of Work clause, FAR 52.242-14.

PROPERTY AND PERSONAL DAMAGE

(a) The Contractor shall use every precaution necessary to prevent damage to public and private property. Land monuments and property markers shall not be disturbed until the Contracting Officer, or his/her representative, has witnessed or otherwise referenced their location and directed their removal.

(b) The Contractor shall be responsible for all damage to property and to persons, including third parties, that occur as a result of his/her agent's or employee's fault or negligence. The term "third parties" is construed to include employees of the government.

PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by, or with the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

TRASH AND REFUSE MATERIAL

Contractor shall remove all of his/her own trash and refuse from the contract area. Material to be removed includes, but is not limited to: used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper garbage, etc. All placement of sanitary facilities will require prior approval of the Contracting Officer.

STORAGE OF MATERIALS AND EQUIPMENT

Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.

POTENTIAL SAFETY HAZARDS

INHERENTLY HAZARDOUS CONDITIONS SAFETY PLAN CERTIFICATION

(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following conditions have been identified by the Government as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all-inclusive. The successful Contractor shall certify that his/her Safety Plan conforms to the requirements of OSHA. The Safety Plan certification shall be submitted prior to commencing work on the project. Appropriate actions shall be taken by the Contractor to implement this plan during performance and to take any and all other necessary steps to mitigate the dangers from hazards.

Crossing streams and working along surf.

Sneaker Waves.

Big Surf (storm surge).

Soft sand.

Beach debris.

Travel on sand roads.

The inability to see hazards within the project area.

The inhalation of potentially hazardous material.

Excavation/slope stability removing sand dunes.

Traffic control on high-volume, high-speed and/or limited visibility roads.

Heavy equipment operation.

Fire hazards.

Hazardous materials handling.

Hydraulic and/or pneumatic and/or high pressure hazards.

Mechanical hazards such as pulleys, springs, etc.

Other vehicles.

TERMINATION FOR CAUSE, DAMAGES FOR DELAY

Employment of undocumented workers is conducive to creating situations that cause undue and unwarranted disruptions to contract work. To avoid these situations, it is hereby mutually agreed in the event the Contracting Officer receives written notice from the U. S. Immigration and Naturalization Service of two (2) separate instances where undocumented workers were employed on work under this Contract; action will be taken to place the Contractor in default.

PHYSICAL DATA

(FAR 52.236-4) (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions in the specifications are the result of site investigations by surface observations.

(b) Weather conditions typical for this area indicates the following normal work season and fire season:

Normal Work Season: Year around Normal Fire Season: June 15 to October 15

CONTRACTOR’S SAFETY PLAN AND SPILL PLAN

The Contractor shall provide to the Government a safety plan detailing with how the Contractor will manage an accident or injury on the project sites. The safety plan will include the evacuation route, the nearest hospital and the communication used. The Contractor will also provide the Government will a spill plan detailing what the Contractor will do in the event of a fuel, oil or fertilizer spill on the project sites.

EMERGENCY RESPONSE & NOTIFICATION

The Contractor shall follow procedures oulined in the Siuslaw National Forest Spill Plan.

MATERIALS AND WORKMANSHIP

(b) The Contractor shall obtain the Contracting Officer's approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and workmanlike manner. The

Contracting Officer may require, in writing, that the Contractor remove from the work any employee that Contracting Officer deems incompetent, careless, or otherwise objectionable.

SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further execution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable;

or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.212-12, Suspension of Work, and shall not qualify for an equitable adjustment.

BASIS OF PAYMENT

Payment will be made on the work satisfactorily completed as determined by the C.O.R.. Payment will be made on the Contractor’s quote rate as shown on the Schedule of Items. All other work and materials not shown on the Schedule of Items will be considered as incidental to and included in the payment for the item shown.

Each project area will be verified separately and not added to any other project site for acceptance.

CONTRACTOR FURNISHED CRITICAL ITEMS/SERVICES

1. All Equipment. See equipment requirements.

2. All fuels, lubricants, parts, labor and maintenance.

3. All transportation (haul in/haul out) of all equipment.

Continuation of SF1449 Block 27: The full text of a clause or provision may be accessed electronically at http://farsite.hill.af.mil/vffara.htm

CONTRACT CLAUSES

FAR 52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Apr 2010); Alternate II (Apr 2010)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

____ Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

__X_ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Mar 2009) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).

__X_ (4) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009) (Pub. L. 111-5).

___ (5) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999) (15 U.S.C. 657a).

___ (6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jul 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

___ (7) [Reserved]

__X_ (8) (i) 52.219-6, Notice of Total Small Business Aside (June 2003) (15 U.S.C. 644).

___ (ii) Alternate I (Oct 1995) of 52.219-6.

___ (iii) Alternate II (Mar 2004) of 52.219-6.

http://farsite.hill.af.mil/vffara.htm�

___ (9) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

___ (ii) Alternate I (Oct 1995) of 52.219-7.

___ (iii) Alternate II (Mar 2004) of 52.219-7.

___ (10) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).

___ (11) (i) 52.219-9, Small Business Subcontracting Plan (Apr 2008) (15 U.S.C. 637 (d)(4).)

___ (ii) Alternate I (Oct 2001) of 52.219-9.

___ (iii) Alternate II (Oct 2001) of 52.219-9.

__X_ (12) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).

___ (13) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

___ (14) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

___ (ii) Alternate I (June 2003) of 52.219-23.

___ (15) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Apr 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (16) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (17) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004) (15 U.S.C. 657 f).

__X_ (18) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C.

632(a)(2)).

__X_ (19) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

___ (20) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Aug 2009) (E.O. 13126).

__X_ (21) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

__X_ (22) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

___ (23) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006) (38 U.S.C. 4212).

__X_ (24) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).

___ (25) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006) (38 U.S.C. 4212).

___ (26) 52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___ (27) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (28) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

___ (29) (i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).

___ (ii) Alternate I (Dec 2007) of 52.223-16.

___ (30) 52.225-1, Buy American Act--Supplies (Feb 2009) (41 U.S.C. 10a-10d).

___ (31) (i) 52.225-3, Buy American Act –Free Trade Agreements – Israeli Trade Act (Jun 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-301, 109-53, 109-169, 109-283, and 110-138).

___ (ii) Alternate I (Jan 2004) of 52.225-3.

___ (iii) Alternate II (Jan 2004) of 52.225-3.

___ (32) 52.225-5, Trade Agreements (Aug 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__X_ (33) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

___ (34) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

___ (35) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

___ (36) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C.

255(f), 10 U.S.C. 2307(f)).

___ (37) 52.232.30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C.

2307(f)).

__X_ (38) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct. 2003) (31 U.S.C. 3332).

___ (39) 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration (May 1999) (31 U.S.C. 3332).

___ (40) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332).

___ (41) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

___ (42) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).

___ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

__X_ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

__X_ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). GS-11 $27.51

___ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C.206 and 41 U.S.C. 351, et seq.).

___ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

___ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

___ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Feb 2009) (41 U.S.C. 351, et seq.).

___ (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L.

110-247).

___ (8) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to—

(i) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract; and

(ii) Interview any officer or employee regarding such transactions.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial items, other than—

(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and

(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(A) 52.203–13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110–252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Mar 2009) (Section 1553 of Pub. L. 111-5).

(C) 52.219–8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219–8 in lower tier subcontracts that offer subcontracting opportunities.

(D) 52.222–26, Equal Opportunity (Mar 2007) (E.O. 11246).

(E) 52.222–35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C.

4212).

(F) 52.222–36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793).

(G) 52.222–41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

(H) 52.222–50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C.

7104(g)).

(I) 52.222–51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

(J) 52.222–53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Feb 2009) (41 U.S.C. 351, et seq.).

(K) 52.222–54, Employment Eligibility Verification (Jan 2009).

(L) 52.226–6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110–247). Flow down required in accordance with paragraph (e) of FAR clause 52.226–6.

(M) 52.247–64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247–64.

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of Clause)

52.204-7 Central Contractor Registration -- (Apr 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

http://fedgov.dnb.com/webform�

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.

Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

(End of Clause)

FAR 52.203-15 – Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Mar 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111–5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

(End of clause)

FAR 52.204-11 – American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009)

(a) Definitions. As used in this clause—

“Contract,” as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .