ATTACHMENT 4 - PROJECT LIST
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_INSP_SVC REVISION 1.doc | DOC document | |
| RFP_INSP_SVC REVISION 1.doc | DOC document | |
| RFP_OLYMBS_INSP_SVC.doc | DOC document | |
| Continuation of Daily Diary.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSPECTION SERVICES CONTRACT – ATTACHMENT 4
Olympic National Forest
1) Fir Creek Bridge – Located on Forest Service Road (FSR) 2350000 M.P. 0.1; Project consist of a large pipe removal and the installation of a new Bridge.
2) Rainbow Creek Aquatic Organism Passage– Located on FSR 2303000 M.P. 1.5; Installation of a Bridge of a Large open bottom Arch.
3) Snow Creek – Located on FSR 2850000 M.P. 0.38; Project consist of Removal of existing large Culvert and replacing with a larger open bottom arch culvert. Arch is a multi-plate structure with 7.65 m span x 2.26 m rise x 41.16 m long.
4) Road 2160 – Located on FSR 2160000 M.P. 2.4 – Project consists of removal of the existing culvert and replacing it with a larger 18’ diameter multi-plate culvert.
5) 23 Road Paving – Located on FSR 2300000 M.P. 0.0 to 1.1: This is a paving project that requires removal of the old road bed and replace with new pavement structure.
6) Road 30 CIP - Located on FSR 3000000 from M.P. 3.45 to 6.3; An ongoing project from last year with work of Deep patch construction, replacing large culverts (Aquatic Organism Passage (AOP and Non-AOP Culverts) and a mechanically stabilized earth wall.
Mount Baker - Snoqualmie National Forest
1) Bessemer Road Decommissioning – Located on Forest Service Road 200 and surrounding area; Project consist of 10.2 miles of decommissioning and 5.9 miles of road to be converted to trail.
2) Evans Creek ORV Reconstruction – Located on FRS 7920 area; Project consist of ORV Trailhead parking area at the entry and day-use area, Reconstruction of road from M.P. 0.00 to 1.76, Decommissioning of 8.1 miles of road.
3) Evergreen Road Reconstruction – Located on FSR 6554 Intermittent work from M.P. 0.00 to 4.15, Project consist of Road reconstruction, (repair, improved and maintain to standard)
4) Hansen Creek Culvert Repair – Located on FSR 5510 M.P. 2.55 – Project consist of removal of twin culverts and replacing with a AOP 11’-10 “ span x 7’-7” rise x 63’ long Multi-plate pipe arch.
5) South Zone Deferred Maintenance and Annual road Maintenance – 5 Roads Located on the Skykomish Ranger District; Maintenance of 90 miles of Level 3 roads.
6) Mt. Loop Hwy – Located on FSR 20 From M.P. 33 to 43; Reconstruction and Culvert replacements. (AOP and Non-AOP Culverts)
7) Saul Roads – Located on FSR 49 from M.P. 0.0 to 9.0; Reconstruction and culvert replacements. (AOP and Non-AOP Culverts)
8) Road 2180 and Road 2811– From M.P. 0.0 to 6.0 both roads; Reconstruction and culvert replacements. (AOP and Non-AOP Culverts)
9) North Zone Deferred Maintenance and Annual road Maintenance – All district roads Located on the Mt. Baker and Darrington Ranger District.
10) Road 31 – From M.P. 0.0 to 8.0; Reconstruction and Culvert replacements
11) Beaver Creek Bridge – Located on FSR 1100 M.P. 16.6; Project consist of removal of the existing culvert and replacing it by the Installation of new 2 lane bridge.
12) Black Creek Bridge - Located on FSR 4021 M.P. 1.5; Project consist of removal of the existing log stringer bridge and replacing it by the Installation of new 1 lane prefab bridge.
13) Conn Creek Bridge - Located on FSR 2430 M.P.1.05; Project consist of removal of the existing culvert and replacing it by the Installation of new 1 lane prefab bridge.