Attachments Ramona Construction.docx

DOCX document 1 MB Posted

Attached to
Recovery - Ramona Bridge aka 25 Mile Creek Bridge Construction
Solicitation number
AG-0489-S-10-0387
Issued by

About this file

Attachments Ramona Construction

View the file

Other files

File Type Posted
Typical Plans.pdf PDF
Ramona Bridge CONSTRUCTION_RFQ.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recovery – Ramona Bridge aka 25 Mile Creek Bridge Construction Attachments

Attachment 1

Attachment 2

Attachment 3 Table of Contents

Table of Contents1
Preface3
101 - Terms, Format, and Definitions4
101.01 Meaning of Terms4
101.03 Abbreviations.4
101.04 Definitions.4
102 - Bid, Award, and Execution of Contract7
102 Bid, Award, and Execution of Contract7
103 - Scope of Work8
Deletions8
104 - Control of Work9
Deletions9
104.06 Use of Roads by Contractor9
105 - Control of Material10
105.02 Material Sources.10
105.02(a) Government-provided sources.10
105.05 Use of Material Found in the Work.10
106 - Acceptance of Work11
106.07 Delete11
107 - Legal Relations and Responsibility to the Public12
107.05 Responsibility for Damage Claims.12
107.06 Contractor’s Responsibility for Work.12
107.09 Legal Relationship of the Parties.12
107.10 Environmental Protection.12
108 - Prosecution and Progress13
108 Delete.13
109 - Measurement and Payment14
109 Deletions14
109.02 Measurement Terms and Definitions.14
151 - Mobilization15
151.01 Description15
153 - Contractor Quality Control16
153.04 Records.16
155 - Schedules for Construction Contracts17
155 Delete.17
157 - Soil Erosion Control18
157.03 General18
203 - Removal of Structures and Obstructions19
203.03 Salvaging Material.19
203.05 Disposing of Material.19
208 - Structure Excavation and Backfill for Selected Major Structures20
208.04 General.20
208.04 General.21
251 - Riprap22
251.01 Description22
251.02 Material.22
251.03 General.22
251.07 Acceptance22
251.08 Measurement.22
322 - Minor Aggregate Courses23
404 - Minor Hot Asphalt Concrete30
404.02 Composition of Mix (Job-Mix Formula).30
404.04 Weather Limitations.30
404.06 Placing.30
404.07 Compacting (a).30
404.09 Acceptance.32
Table 404-1. Sampling and Testing Requirements.32
571 - Prefabricated Bridges33
571.1034
571.1134
635 - Temporary Traffic Control35
635.03 General.35
703 - Aggregate36
703.05 Subbase, Base, Surface Course, and Screened Aggregate.36
705 - Rock42
705.02 Riprap Rock.42
717 - Structural Metal44
717.01Structural Steel44
718 - Traffic Signing and Marking Material46
718.05 Aluminum Panels46

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 - Mobilization 151.01_0105_us_05_04_2007

151.01 Description

Add the following at the end of the last sentence:

“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”

153 - Contractor Quality Control 153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

Delete Section 155 in its entirety.

157 - Soil Erosion Control 157.03_nat_us_02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

203 - Removal of Structures and Obstructions 203.00_01_us_10_11_2006

203.03 Salvaging Material.

Delete this subsection and add the following:

Unless shown on the plans, remove all designated material from the project area and National Forest land.

203.05 Disposing of Material.

(a) Remove from project.

Delete this paragraph and add the following:

All removed material may be salvaged by the Contractor unless otherwise shown on the plans. Dispose of all items not designated to be salvaged for the Government in any legal manner.

208 - Structure Excavation and Backfill for Selected Major Structures 208.04_nat_us_08_05_2009 Construction Requirements

208.04 General.

Add the following to the end of the second sentence of the third paragraph:

"... to the CO a minimum of 5 days prior to beginning excavation work."

Add the following to the end of the third sentence of the third paragraph:

"...to the CO a minimum of 15 days prior to installation."

208.09 Foundation Preparation.

Add the following after the first paragraph:

The foundation elevation is defined as the bottom of footings, for spread footing placement; the bottom of the pile cap, for construction of pile foundations; and the toe of the wall, for construction of retaining walls, except wingwalls at bridges.

Replace all material from any over-excavation below the designated footing elevation with concrete, compacted gravel, or foundation fill at the direction of the CO.

When boulders or irregular, fractured, or seamed bedrock precludes excavation to the designated footing elevation without further loosening of previously solid material, the CO may order removal of such loose material and allow payment for concrete, gravel, or structural backfill that is required to restore foundation material to the designated elevation

208.13 Measurement.

Add the following to the second paragraph:

(f) Material excavated to construct end walls or wing walls which lie outside the excavation limits specified above.

Add the following paragraph:

Foundation over-excavation and the resulting replacement material will not be measured for payment unless the CO determines the over-excavation was unavoidable because of the nature of the material.

208.04_04_us_06_16_2009

208.04 General.

Add the following to the first paragraph:

No footing shall be placed until the C.O. has approved the excavation and foundation material in writing.

251 - Riprap 251.00_01_us_10_11_2006

251.01 Description

Delete the first sentence and add the following:

This work consists of furnishing, hauling, and placing of riprap for bank protection, slope protection, drainage structures, erosion control, and other features shown on the plans.

251.02 Material.

Add the following:

When shown on the plans stone from the project site may be utilized.

251.03 General.

Add the following:

Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.

251.07 Acceptance

Delete sampling and testing requirements of Table 251-1 and certification requirements of Subsection 106.03.

251.08 Measurement.

Add the following:

Payment for excavation, embankment and haul required for placement of riprap is incidental to the pay item for riprap.

322 - Minor Aggregate Courses 322.00_nat_us_10_24_2007

Description

322.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.

Surface aggregate grading is designated as shown in Table 703-3.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Screened aggregate grading is designated as shown in Table 703-16.

Material

322.02 Conform to the following Subsections:

Aggregate703.05
Water725.01

Construction Requirements

322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.

Request approval of the roadbed in writing before placing aggregate.

Develop, haul, and apply water in accordance to Section 170.

Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the Contractor in writing.

No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.

After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at approved locations.

322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.

Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

Ensure that the compacted thickness is not consistently above or below the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.

Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.

322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and crosssection by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.

322.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.

The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.

The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).

Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.

Measurement

322.09 Measure the Section 322 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.

If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.

Measure thickness perpendicular to the grade of the travelway.

Measure width perpendicular to the centerline.

Payment

322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Table 322-1 Sampling and Testing Requirements

Reporting Time
Before using

in work

“
“
“
48 hours

Split Sample

Yes, when requested
“
“
“
Yes
Point of Sampling
Source of

material

“
“
“
From windrow or roadbed after processing or from approved crusher sampling device

Sampling Frequency 1 per type & source of material

“
“
“
2 per day
Test Methods Specifications
AASHTO T 96
AASHTO T 104
AASHTO T 210
ASTM D 5821
AASHTO T 2
Category
—
—
—
—
—
Characteristic
LA abrasion (coarse)
Sodium sulfate soundness loss (coarse & fine)
Durability index (coarse & fine)
Fractured faces
Sample
Type of Acceptance (Subsection)
Measured and tested

for conformance (106.04 & 105) Measured and tested for conformance (106.04)

Material or Product
Aggregate source quality

703.05 Subbase, Base, and Surface courses

Table 322-1 (continued)

Reporting Time

Before using in work
“
“
“
Before placing next layer
(1) Minimum of 5 points per proctor.

Split

Yes, when requested
“
“
“
—
Point of Sampling
Source of material
“
“
“
In-place

Sampling

1 per type and source of material
“
“
“
3 per day
Test Methods Specifications
AASHTO T 99 (1)
R-1 Marshall
AASHTO T 180(1)
R-1 Marshall
AASHTO T 310 or other approved procedures
Category
—
—
—
—
—
Characteristic
Moisture-density Method D
Moisture-density Method E
Moisture-density Method F
Moisture-density Method G
In-place density & moisture content
Type of Acceptance (Subsection)
Measured and tested

for conformance (106.04)

Material or Product
Subbase, Base, and Surface

Table 322-2

Reporting Time
48 hours

Split

Yes

Point of Sampling
From windrow or roadbed after processing or from approved crusher sampling device

Sampling

2 per day

Test Methods Specifications
AASHTO T 2
Category
—
Characteristic
Sample
Type of Acceptance (Subsection)
Measured and tested

for conformance (106.04 )

Material or Product
Screened Aggregate

404 - Minor Hot Asphalt Concrete 404.02_nat_us_06_09_2006

404.02 Composition of Mix (Job-Mix Formula).

Delete the second paragraph and replace with the following:

Submit a job-mix formula and supporting documentation, test results, and calculations for the material to be incorporated into the work. Include copies of laboratory test results and mix design data that demonstrate that the properties of the aggregate, additives, and mixture meet the current requirements and criteria of Federal or state agencies. Ensure that the job-mix formula was performed no more than one year prior to placing the hot asphalt concrete. After reviewing the Contractor’s proposed job-mix formula, the CO will determine the final values for the job-mix formula to be used and notify the Contractor in writing.

404.04_nat_us_03_02_2005

404.04 Weather Limitations.

Change 35o F to 45o F:

404.06_nat_us_03_02_2005

404.06 Placing.

Add the following:

Do not place asphalt until the CO has approved in writing the area where it will be placed.

Delete the last sentence and replace with the following:

Offset the longitudinal joint of one layer at least 6 inches from the joint in the layer immediately below. Make the longitudinal joint in the top layer along the centerline of two-lane roadways or at the lane lines of roadways with more than two lanes. Offset transverse joints in succeeding layers and in adjacent lanes at least 10 feet, where possible.

404.07_nat_us_03_02_2005

404.07 Compacting (a).

Delete and replace with the following:

(a) Roadway paving. Thoroughly and uniformly compact the surface a minimum of three passes with rollers that meet one of the following requirements:

(1) Steel-wheeled rollers, other than vibratory type, capable of exerting a force of not less than 1.5 ton/feet of width of the compression roll or rolls.

(2) Vibratory steel-wheel rollers with a minimum mass of 5 ton, equipped with amplitude and frequency controls, and designed to compact asphalt concrete.

(3) Pneumatic-tire rollers with smooth tread tires of equal size that provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 lbf/in2.

Perform initial compaction while the mixture is above 250 °F. Perform finish rolling with steel-wheel rollers and continue until no roller tracks remain.

Recovery – Ramona Bridge aka 25 Mile Creek Bridge Construction Attachments

404.09_nat_us_03_02_2005

404.09 Acceptance.

Add the following to the second paragraph:

See Table 404-1 for sampling and testing requirements.

Table 404-1. Delete and replace with the following:

Table 404-1. Sampling and Testing Requirements.

Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Sampling Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Asphalt Mixture (404.09)
-
-
-
AASHTO T 168
Three minimum per project and at least one per 500 Cubic yards
Roadway prior to compaction
yes
As soon as sampled

571 - Prefabricated Bridges 571.00_nat_us_03_15_2005 Description

571.01 This work consists of unloading, transporting and installing Government-furnished prefabricated, modular superstructures and components. The work also includes constructing caps, bearings, and abutments including excavation and backfill and anchoring bridge superstructures to abutments as required

Materials

571.02 Requirements. Furnish materials that meet the requirements specified in the following sections:

Bridge Railing
556
Structural Metal
717
Prestressed Concrete
553
Reinforcing Steel
554
Steel Structures
555
Structural Concrete
552
Timber Structures
557
Material for Timber Structures
716

Concrete compressive strength, structural steel tensile strength, finish and designation, timber species, grade, and treatment, and other material specifications shall be as required or if not listed in the contract documents, take them from the manufacturer’s drawings, and have them approved by the CO prior to fabrication.

Construction Requirements

571.03 Design Drawings. When Government-furnished prefabricated bridge superstructure components are specified, material lists, installation information, and manufacturer’s instructions will be furnished by the Government.

571.04 General. Perform excavation, backfill, and embankment work under Sections 204 and 209.

Dispose of all debris resulting from operations in accordance with Section 203.

571.05 Performance. Notify the CO at least 15 days before delivering the bridge.

If the prefabricated superstructure is not installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point. Support and stack all components to prevent damage. Furnish and install blocking to support all components at least 12 inches above the ground.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

571.06 Abutments and Approaches. Construct required caps, bearing, and abutments according to Division 500. Construct approaches including excavation and backfill according to sections 204 and 209.

571.07 Government-Furnished Prefabricated Bridge Superstructure. For Government-furnished prefabricated bridge units, unload, store according to 571.05(if necessary), transport all material from the delivery or storage site(s) to the bridge site, and install the superstructure complete and in place, including connection of all girders, diaphragms, railings, panels, transoms, and other elements.

Upon taking possession of the Government-furnished units at the delivery site, assume liability for damage resulting from handling, transporting, or erecting the units in place, until final acceptance of the project.

571.08 Non-pressure Epoxy Grout Anchors. Furnish non-pressure epoxy grout to cement anchor dowels and bolts. At least 15 days prior to use submit for approval manufacture’s test information on the non-pressure epoxy grout proposed for use.

Immediately prior to placing dowels or bolts, clean drill hole of dust and other material. Fill hole halfway with grout. Insert dowels by rotating it though one complete turn while tapping it down. Insert bolts according to manufacture’s instructions. If necessary add more grout to fill the hole.

571.09 Acceptance. Furnish a production certification for timber, including glued-laminated lumber, structural steel, and fabricated steel. Furnish a certification for all wood treatment, fasteners, hardware, galvanizing processes, and non-pressure epoxy grout.

Measurement

571.10 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02.

Payment

571.11 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

635 - Temporary Traffic Control 635.03_nat_us_05_13_2004

635.03 General.

Add the following:

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

703 - Aggregate 703.05_nat_us_08_14_2009 Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) GradationTable 703-2
(2) Liquid limit, AASHTO T 8925 max.
(3) Plastic limit, AASHTO T 90Nonplastic
(4) Los Angeles abrasion, AASHTO T 9640% max.
(5) Sodium sulfate soundness loss (5 cycles),12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 21035 min.
(7) Durability index (fine), AASHTO T 21035 min.
(8) Fractured faces, ASTM D 582150% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) GradationTable 703-3
(2) Liquid limit, AASHTO T 8935 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12%2 to 9
b) If the percent passing the No. 200 sieve is greater than 12%Less than 2
(4) Los Angeles abrasion, AASHTO T 9640% max.
(5) Sodium sulfate soundness loss (5 cycles),12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 21035 min.
(7) Durability index (fine), AASHTO T 21035 min.
(8) Fractured faces, ASTM D 582175% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) GradationTable 703-16
(2) Plastic Index, AASHTO T 90Less than 9
(3) Los Angeles abrasion, AASHTO T 9655% max.

(4) Free from organic matter and lumps or balls of clay.

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

Table 703-2 Target Value Ranges for Subbase and Base Gradation

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
E (Base)
62 – 90 (6)
36 – 74 (6)
12 – 26 (4)
4.0 – 7.0 (3)

( ) The value in the parentheses is the allowable deviation () from the target values..

D (Base)

100
86 – 100 (6)
51 – 82 (6)
36 – 64 (6)
12 – 26 (4)
4.0 – 7.0 (3)

C (Base)

80 – 100 (6)
64 – 94 (6)
40 – 69 (6)
31 – 54 (6)

4.0 –7.0 (3)

B (Subbase)

100
97 – 100

40 – 60 (8)

4.0 – 12.0 (4)

A (Subbase)
100
97 – 100

65 – 79 (6)

45 – 59 (7)

28 – 42 (6)
9 – 17 (4)
4.0 – 8.0 (3)
Sieve Size
2½ inch
2 inch
1½ inch
1 inch
3/4 inch
1/2 inch
3/8 inch
No. 4
No. 40
No. 200

Delete Table 703-3 and replace with the following:

Table 703-3 Target Value Ranges for Surface Gradation

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
U
71 – 90 (6)
50 – 68 (7)
34 – 51 (6)
19 – 30 (5)
8.0 – 15.0 (4)

( ) The value in the parentheses is the allowable deviation () from the target values.

If the plasticity index (PI) is greater than 0, the TV range for the No. 200 sieve size is 8-12 (4).

T

71 – 91 (6)

43 – 60 (7)
30 – 46 (6)
16 – 28 (5)
8.0 – 15.0 (4)
S
100
72 – 92 (6)
51 – 71 (6)
36 – 53 (7)
26 – 40 (6)
14 – 25 (5)
8.0 – 15.0 (4)

H

97 - 100

80 – 92 (6)
58 – 70 (7)
28 – 40 (6)
16 – 26 (5)
9.0 – 14.0 (4)

G

100
97 - 100
70 – 80 (6)
51 – 63 (7)
28 – 39 (6)
19 – 27 (5)
10.0 – 16.0 (4)
F
100
97-100
76-89 (6)
56-68 (6)
43-53 (7)
23-32 (6)
15-23 (5)
10.0-16.0 (4)
Sieve Size
1 1/2 inch
1 inch
3/4 inch
1/2 inch
3/8 inch
No. 4
No. 8
No. 16
No. 40
No. 200

Add Table 703-16:

Table 703-16 Gradation Requirements for Screened Aggregate

Sieve Size
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L
M
N
O
P
Q
R
6 inch
100
100

4 inch

100
100

3 inch

100
100

2 inch

No. 4

15-45

15-45

15-45

705 - Rock 705.02_nat_us_08_05_2009

705.02 Riprap Rock.

Delete Table 705-1 and replace it with the following:

Gradation Requirements for Riprap

Class
Percent of Rock by Mass
Mass

(pounds) Approximate Cubic Dimension b,c (inches)

20
22 to 33
6 to 8
30
11 to 22
5 to 6
40
1 to 11
2 to 5
10a
0 to 1
0 to 2
20
55 to 110
8 to 10
30
22 to 55
6 to 8
40
2 to 22
3 to 6
10a
0 to 2
0 to 3
20
220 to 330
14 to 16
30
110 to 220
10 to 14
40
11 to 110
5 to10
10a
0 to 11
0 to 5
20
550 to 770
18 to 20
30
220 to 570
14 to 18
40
22 to 220
6 to 14
10a
0 to 22
0 to 6

4a

20
770 to1353
20 to 24
30
330 to 770
16 to 20
40
33 to 330
7 to16
10a
0 to 33
0 to 7
20
1540 to 2200
26 to 28
30
1100 to 1540
20 to 26
40
55 to 1100
8 to 20
10a
0 to 55
0 to 8
20
1870 to 3520
28 to 34
30
1100 to 1870
22 to 28
40
110 to 1100
10 to 22
10a
0 to 110
0 to 10
20
4400 to 5940
35 to 39
30
2200 to 4400
28 to 35
40
220 to 2200
14 to 28
10a
0 to 220
0 to 14
20
7000 to 10000
42 to 47
30
4000 to 7000
35 to 42
40
400 to 4000
16 to 35
10a
0 to 400
0 to 16

(a) Furnish spall and rock fragments graded to provide a stable dense mass.

(b) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.

(c) Furnish rock with breadth and thickness at least one-third its length.

717 - Structural Metal 717.01_nat_us_08_05_2009

717.01 Structural Steel

(e) High-Strength Bolts, Nuts, & Washers.

Delete the first paragraph and replace with the following:

Conform to either AASHTO M164 or AASHTO M253, as specified. Use Type 3 bolts in combination with unpainted weathering structure steel. Conform to AASHTO M293 (ASTM F 436) for hardened steel washers.

Add the following subsections:

(f) Load-Indicating Washers.

Furnish load-indicating washers (Compressible-washer-type DTI's) conforming to ASTM F 959, Type 8.8 or 10.9. Use Type 8.8 with AASHTO M 164 bolts and with ASTM F 568, Class 8.8 tie rods; use Type 10.9 with AASHTO M 253 bolts. When galvanizing is shown on the plans, furnish DTI's mechanically galvanized to conform to AASHTO M 298, Class 50, Type I. When used with other components that are weathering steel or are to be coated the color of weathering steel, furnish DTI's protectively coated with baked epoxy in a black color.

(g) Steel Anchor Bolts.

Furnish steel anchor bolts of the dimensions shown on the plans. Furnish steel anchor bolts that conform to AASHTO M314, Grade 40 unless otherwise shown on the plans. Ensure that the exposed portion of the bolt is zinc coated by hot dip or mechanical deposition.

(h) Structural Steel Tubing.

Furnish structural steel tubing that conforms to ASTM A500, grade B or ASTM A501 unless otherwise shown on the plans.

717.07 Galvanized Coatings

Add the following:

Furnish hot-dipped galvanized hardware and fasteners conforming to AASHTO M 232 and mechanically galvanized hardware and fasteners conforming to AASHTO M 298.

Repair damaged galvanized surfaces by power or hand tool cleaning, followed by 2 brush applications of zinc rich 2 component paint meeting FS TT-P-641, FS TT-P-1046A or MIL-P-21035. Single component brush or spray-on zinc or galvanizing compounds are not permitted. A source for TT-P-641 paint is Far West Paint Company, Tukwila, WA 206-244-8844.

718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

Attachment 4

GENERAL DECISION: WA20100001 03/12/2010 WA1

Date: March 12, 2010 General Decision Number: WA20100001 03/12/2010

Superseded General Decision Number: WA20080001

State: Washington

Construction Type: Highway

Counties: Washington Statewide.

HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)

Modification Number Publication Date 0 03/12/2010

CARP0001-008 09/01/2009

Rates Fringes

Carpenters:

COLUMBIA RIVER AREA -

ADAMS, BENTON, COLUMBIA,

DOUGLAS (EAST OF THE 120TH

MERIDIAN), FERRY,

FRANKLIN, GRANT, OKANOGAN

(EAST OF THE 120TH

MERIDIAN) AND WALLA WALLA

COUNTIES

GROUP 1:...................$ 27.73 10.56

GROUP 2:...................$ 29.73 10.56

GROUP 3:...................$ 28.00 10.56

GROUP 4:...................$ 27.73 10.56

GROUP 5:...................$ 63.50 10.56

GROUP 6....................$ 30.75 10.56

GROUP 7....................$ 31.75 10.56

GROUP 8....................$ 28.00 10.56

GROUP 9....................$ 33.75 10.56

SPOKANE AREA: ASOTIN,

GARFIELD, LINCOLN, PEND

OREILLE, SPOKANE, STEVENS

AND WHITMAN COUNTIES

GROUP 1:...................$ 26.06 10.56

GROUP 2:...................$ 28.06 10.56

GROUP 3:...................$ 26.32 10.56

GROUP 4:...................$ 26.06 10.56

GROUP 5:...................$ 60.14 10.56

GROUP 6:...................$ 29.07 10.56

GROUP 7....................$ 30.07 10.56

GROUP 8....................$ 27.32 10.56

GROUP 9....................$ 33.07 10.56

CARPENTER & DIVER CLASSIFICATIONS:

GROUP 1: Carpenter

GROUP 2: Millwright, machine erector

GROUP 3: Piledriver - includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling

GROUP 4: Bridge carpenters

GROUP 5: Diver Wet

GROUP 6: Diver Tender, Manifold Operator, ROV Operator

GROUP 7: Diver Standby, Bell/Vehicle or Submersible operator Not Under Pressure

GROUP 8: Assistant Tender, ROV Tender/Technician

GROUP 9: Manifold Operator-Mixed Gas

ZONE PAY:

ZONE 1 0-40 MILES FREE

ZONE 2 41-65 MILES $2.25/PER HOUR

ZONE 3 66-100 MILES $3.25/PER HOUR

ZONE 4 OVER 100 MILES $4.75/PER HOUR

DISPATCH POINTS:

CARPENTERS/MILLWRIGHTS: PASCO (515 N Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS/PILEDRIVER: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

DEPTH PAY FOR DIVERS BELOW WATER SURFACE:

50-100 feet $2.00 per foot 101-150 feet $3.00 per foot 151-220 feet $4.00 per foot 221 feet and deeper $5.00 per foot

PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT:

0-25 feet Free 26-300 feet $1.00 per Foot

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

HAZMAT PROJECTS:

Anyone working on a HAZMAT job (task), where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:

LEVEL D + $.25 per hour - This is the lowest level of protection. No respirator is used and skin protection is minimal.

LEVEL C + $.50 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B + $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit".

LEVEL A +$1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.

CARP0003-006 06/01/2007

SOUTHWEST WASHINGTON: CLARK, COWLITZ, KLICKITAT,

LEWIS(Piledriver only), PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the Pacific Ocean), SKAMANIA AND WAHKIAKUM COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY

SEE ZONE DESCRIPTION FOR CITIES BASE POINTS

ZONE 1:

Rates Fringes

Carpenters:

CARPENTERS..................$ 27.56 13.30

DIVERS TENDERS..............$ 30.28 13.30

DIVERS......................$ 68.84 13.30

DRYWALL.....................$ 27.56 13.30

MILLWRIGHTS.................$ 28.04 13.30

PILEDRIVERS.................$ 28.04 13.30

DEPTH PAY:

50 TO 100 FEET $1.00 PER FOOT OVER 50 FEET

101 TO 150 FEET $1.50 PER FOOT OVER 101 FEET

151 TO 200 FEET $2.00 PER FOOT OVER 151 FEET

Zone Differential (Add up Zone 1 rates):

Zone 2 - $0.85 Zone 3 - 1.25 Zone 4 - 1.70 Zone 5 - 2.00 Zone 6 - 3.00

BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND

VANCOUVER, (NOTE: All dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point.)

ZONE 1: Projects located within 30 miles of the respective city hall of the above mentioned cities ZONE 2: Projects located more than 30 miles and less than 40 miles of the respective city of the above mentioned cities ZONE 3: Projects located more than 40 miles and less than 50 miles of the respective city of the above mentioned cities ZONE 4: Projects located more than 50 miles and less than 60 miles of the respective city of the above mentioned cities.

ZONE 5: Projects located more than 60 miles and less than 70 miles of the respective city of the above mentioned cities ZONE 6: Projects located more than 70 miles of the respected city of the above mentioned cities

CARP0770-003 06/01/2009

Rates Fringes

Carpenters:

CENTRAL WASHINGTON:

CHELAN, DOUGLAS (WEST OF

THE 120TH MERIDIAN),

KITTITAS, OKANOGAN (WEST

OF THE 120TH MERIDIAN) AND

YAKIMA COUNTIES

CARPENTERS ON CREOSOTE

MATERIAL...................$ 25.25 11.97

CARPENTERS.................$ 35.39 11.97

DIVERS TENDER..............$ 39.15 13.08

DIVERS.....................$ 87.20 13.08

MILLWRIGHT AND MACHINE

ERECTORS...................$ 36.39 11.97

PILEDRIVER, DRIVING,

PULLING, CUTTING, PLACING

COLLARS, SETTING, WELDING

OR CRESOTE TREATED

MATERIAL, ALL PILING.......$ 35.59 11.97

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

CARP0770-006 06/01/2009

Rates Fringes

Carpenters:

WESTERN WASHINGTON:

CLALLAM, GRAYS HARBOR,

ISLAND, JEFFERSON, KING,

KITSAP, LEWIS (excludes piledrivers only), MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM

COUNTIES

BRIDGE CARPENTERS..........$ 35.39 13.08

CARPENTERS ON CREOSOTE

MATERIAL...................$ 35.49 13.08

CARPENTERS.................$ 35.39 13.08

DIVERS TENDER..............$ 39.15 13.08

DIVERS.....................$ 87.20 13.08

MILLWRIGHT AND MACHINE

ERECTORS...................$ 36.39 13.08

PILEDRIVER, DRIVING,

PULLING, CUTTING, PLACING

COLLARS, SETTING, WELDING

OR CRESOTE TREATED

MATERIAL, ALL PILING.......$ 35.59 13.08

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

ELEC0046-001 06/01/2009

CALLAM, JEFFERSON, KING AND KITSAP COUNTIES

Rates Fringes

CABLE SPLICER....................$ 44.89 3%+15.71

ELECTRICIAN......................$ 40.81 3%+15.71

* ELEC0048-003 01/01/2010

CLARK, KLICKITAT AND SKAMANIA COUNTIES

Rates Fringes

CABLE SPLICER....................$ 39.66 $16.58

ELECTRICIAN......................$ 36.05 $16.58

HOURLY ZONE PAY:

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria

Zone Pay:

Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour

*These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus.

ELEC0073-001 07/01/2009

ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN

COUNTIES

Rates Fringes

CABLE SPLICER....................$ 28.62 3%+12.98

ELECTRICIAN......................$ 28.22 3%+12.98

ELEC0076-002 02/28/2009

GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON

COUNTIES

Rates Fringes

CABLE SPLICER....................$ 38.57 3%+14.75

ELECTRICIAN......................$ 34.75 3%+14.75

ELEC0112-005 07/01/2009

ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA

WALLA, YAKIMA COUNTIES

Rates Fringes

CABLE SPLICER....................$ 36.70 3%+13.73

ELECTRICIAN......................$ 34.95 3%+13.73

ELEC0191-003 03/01/2008

ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES

Rates Fringes

CABLE SPLICER....................$ 36.86 3%+12.98

ELECTRICIAN......................$ 33.51 3%+12.98

ELEC0191-004 03/01/2008

CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES

Rates Fringes

CABLE SPLICER....................$ 32.46 3%+12.81

ELECTRICIAN......................$ 29.51 3%+12.81

ELEC0970-001 01/01/2009

COWLITZ AND WAHKIAKUM COUNTY

Rates Fringes

CABLE SPLICER....................$ 34.68 3%+9.59

ELECTRICIAN......................$ 31.53 3%+9.59

ENGI0302-003 06/01/2009

CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF

THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING,

KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN),

SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE

120TH MERIDIAN) COUNTIES

PROJECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS

SHOWN BELOW)

Zone 1 (0-25 radius miles):

Rates Fringes

P…