USDA FOREST SERVICE PROJECT SPECIFICATIONS
SPECIFICATIONS LIST
SECTION 01010
STATEMENT OF WORK
SECTION 00100
MEASUREMENT AND PAYMENT
SECTION 01200
MOBILIZATION PAYMENT PROCEDURES
SECTION 01300
SUBMITTALS
SECTION 02080
UTILITY MATERIALS
SECTION 02230
CLEARING AND GRUBBING
SECTION 02310
GRADING
SECTION 02317
EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 02318
EXCAVATION AND BACKFILL FOR UTILITIES
SECTION 02530
SANITARY SEWAGE
SECTION 02543
SEPTIC TANKS AND SEPTIC COMPONENTS
SECTION 02544
REMOVAL OF A SEPTIC TANK
SECTION 16000
ELECTRICAL
AG-0489-S-10-0370
RECOVERY Wastewater System Upgrades at Sutton and Carter Lake Campgrounds
SECTION 01010
STATEMENT OF WORK
Siuslaw National Forest, Central Coast Ranger District Wastewater System Upgrades at Sutton and Carter Lake Campgrounds, 2010
PART 1 – GENERAL
1.01 CURRENT CONDITION
A. Sutton Campground is divided in four loops and two areas: loops A, B, C and D; a group picnic area; and a beach area. Each loop or area has at least one flush toilet with its own wastewater treatment system. Each wastewater treatment system consists of a gravity fed system with a septic tank and a standard drain-field.
B. Original wastewater systems at Sutton CG were developed and constructed in the mid 1970’s. Two flush toilets were replaced a few years ago along with other upgrades.
C. Three flush toilets and their correspondent sewer systems at Sutton CG will be replaced this 2010 spring. These sewer systems will be converted from gravity fed systems to pressurized systems.
D. Another flush toilet in the picnic area will be replaced, but the existing drain-field may remain operational and in service. An optional item to remove the old septic tank, install a new septic tank, and replaced the existing drain-field is considered under this contract (see optional items).
E. Carter Lake Campground consists of one loop. The campground has one flush toilet with its own wastewater system. The current system uses a septic tank, a dosing tank, and a gravity fed system drain-field. The effluent from the septic tank is pump uphill to the dosing tank.
F. Original wastewater system at Carter Lake CG was developed and constructed in the mid 1970’s. A few years ago, the old flush toilet was replaced with a new flush toilet.
The new toilet was built in a different location, but the existing drain-field was kept in service. A new septic tank was installed next to the new building structure but the old septic tank was kept in service to be used as a dosing chamber. The dosing tank delivers effluent via gravity to the existing drain-field.
G. A new pressurized drain field, serial distribution, at Carter Lake CG will be installed to eliminate the dosing chamber and replace the old gravity drain-field. The old 1,000 gallon concrete septic tank (dosing chamber) will be removed and the existing pump will be replaced to provide adequate pressure and equal distribution.
1.02 PROJECT SUMMARY: This work consists of upgrading three (and possibly four) wastewater treatment systems at the Sutton Campground and one wastewater treatment system at Carter Lake Campground. Wastewater treatment systems at Sutton CG will be serving the new CXT flush toilet units that will be installed during spring 2010 under a separate contract. Wastewater system at Carter Lake CG will be serving the existing flush toilet. The work includes, but it is not limited, to the following:
A. Contractor shall comply with all applicable Federal, State, and local regulations, including but not limited to the following: Environmental Protection Agency, Oregon Occupational Safety and Health Administration, Oregon Bureau of Labor and Industries, Oregon Department of Transportation, and Oregon Department of Environmental Quality.
B. Contractor shall comply with the Oregon Administrative Rules (OARs), Chapter 340, Divisions 052, 071 and 073.
C. Forest Service will provide contractor with background information to commence and complete construction work. Information will include site plans, drawings, specifications, engineering sewage flow data, and minimum length of absorption trenches (linear feet) required per volume projected daily sewage flow determined from soil texture versus effective soil depth for each site.
D. A “Test Pit Preparation for Onsite Service Evaluation” and county inspections for work sites have already been conducted. County Inspectors for Lane and Douglas Counties have determined that the minimum length of absorption trench for each location is 50 linear feet per 150 gallons of projected daily sewage flow.
E. Contractor shall provide to the Forest Service submittals of construction materials and equipment to be utilized and installed prior to commencement of work.
Contractor shall receive approval from CO prior to commencing any construction and installation work on the field.
F. Contractor shall submit all appropriate paper work and required fee(s) to obtain one permit for each site. A “Major Alteration Permit” with Lane County is required for Sutton CG. The Department of Public Works for Lane County, Land Management Division has been contacted and informed of the scope of work. County fee for all the sites in the Sutton CG site have been estimated to be $1,180.08. This cost shall be indirectly included under mobilization.
G. A “Major Repair Permit” with the Douglas County, Planning Department is required for Carter Lake CG. Douglas County has been contacted and informed of the scope of work. County fee for the Carter Lake CG site has been assessed to be $509. This cost shall be indirectly included under mobilization.
H. Contractor shall submit to the Forest Service a copy of all paper work submitted to, and received from, each regulatory agency.
I. Construction work in Sutton CG will take place in three specific and separate locations. Sewer treatment systems will be replaced in loops B, C, and D (see drawings). A fourth location in the Sutton CG “Picnic Area” is considered as an Optional Bid Item.
J. Existing septic tanks in loops B, C, and D for Sutton CG will be removed under a separate contract. Existing 1,500 gallon concrete septic tank in the picnic area will be removed under the optional item.
K. Existing drain-lines in loops B, C, and D for Sutton CG will be cut and capped under a separate contract. Existing drain-field for the picnic area (Sutton CG) will be cut and capped under the optional item of this contract.
L. Construction work in Carter Lake CG will take place in one specific location.
1,000 concrete dosing tank and distribution box will be removed, existing sewer lines will be cut and capped, and sewer system will be replaced for a pressurized drain-field system. Work to be executed near the existing drain-field area (see drawings).
M. At each site, contractor shall yield a properly functioning pressurized drain-field septic system, provide transportation, construction materials, labor, technical expertise, and incidentals to comply with the scope of work.
N. Contractor shall preserve existing roads, buildings and facilities, underground utilities, landscapes, vegetation, and campground landmarks to remain undisturbed in the campground.
Sewer Systems at Sutton Campground (Loops B, C, and D; and Picnic Area for the Optional Item). For each site and specific location:
O. Contractor shall provide and install a concrete septic tank and appurtenances, an effluent pumping system, and a sewage alarm and control system in accordance with Sections 02530 and 02543 of the Specifications and drawings.
P. Contractor shall construct and install, at each site, a new “Pressurized Distribution Drain-field system”. End of sewer lines shall have clean-outs, and pressurized distribution lines shall be connected to sewer lines from each respective septic tank.
Q. Contractor shall provide and install a sewage control panel and a sewage alarm system for each wastewater system. Sewage control panels and sewage alarm systems shall be wired and connected to electrical panel located inside of each CXT building. Sewage control panel shall be mounted inside new CXT building. Alarm shall be mounted in CXT unit. Coordinate this work with CO. Ensure proper size wiring and proper connections.
R. Contractor shall provide and install complete electrical services to connect sewage pumps to existing electrical lines, and provide, install, and connect sewage control panels and alarms. Underground electrical lines to be installed near sewer lines.
Work to be executed by an Oregon State certified Electrician. Arrangements for electrical services at each flush toilet have been made under a different contract.
Each CXT flush toilet will have a new 200 Amps electrical panel to support and provide electrical services to each building and sewage treatment system.
Sewer System at Carter Lake Campground:
S. Contractor shall remove and legally dispose of off government property the old
1,000 gallon concrete septic tank (dosing chamber) and distribution box.
T. Contractor shall size, provide, and install a new sewage pump to discharge effluents from existing dual chamber septic tank to new “Pressurized Distribution Treatment System”.
U. Contractor shall construct and install a new “Pressurized Serial Distribution Drain-field System”. Ends of pressurized sewer lines shall have clean-outs for maintenance and distribution system shall be connected to main 1¼” pressure sewer line.
V. Contractor shall use existing electrical lines and services to connect new sewage pump. Work to be executed by an Oregon State certified Electrician.
All Sewer Systems:
W. Contractor shall test all equipment and material(s) provided, including septic tanks, pressurized sewage systems, sewage pumps, float switches, sewage alarm systems and control panels to ensure proper operation and flow of all sewage treatment systems.
X. Remove all spoils and construction debris generated and excess unsuitable materials resulting from excavation work, and legally dispose of them off government property.
Y. Restore disturbed forest landscape areas to match previous existing conditions by placing logs, rock/boulders, and organic material as indicated by the CO.
Z. Contractor shall prepare and submit a safety plan, and use barricades and warning signals to notify the public of the construction work. Campgrounds may be used during this time of year. Visitors should be expected at all times throughout the area. Coordinate and establish with the CO a detour route when working in construction areas.
AA. Contractor shall submit final documents and as-built plans to the regulatory agency;
three (3) copies of these documents shall be submitted to the CO. This cost shall be indirectly included under mobilization.
BB. OPTIONAL ITEM: A “Pressurized Sewer System, Serial Distribution” in the
Picnic Area may be reconstructed under this contract. Under this optional item, contractor shall remove and legally dispose of existing 1,000 gallon concrete septic tank; provide and install a 2,000 gallon concrete-dual chamber septic tank, tank accessories, appurtenances and discharge assembly components, an effluent filter, an effluent pump, float switch assemblies and external splice box, a pressurized distribution system with two clean-outs, and a sewage control panel and an alarm system. Contractor shall provide electrical services to connect sewage pump to new electrical panel located inside CXT building unit.
PART 2 - PRODUCTS (NOT USED)
1.
2. PART 3 - EXECUTION (NOT USED)
3.
4. PART 4 – MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION 01010
SECTION 00100
1.PART 1 – GENERAL
MEASUREMENT AND PAYMENT
1.01 MEASUREMENT AND PAYMENT
A. Measurement and payment for contract work will be made only for and under those pay items included in SECTION B - SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.
B. When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be bid.
1.02 DETERMINATION OF QUANTITIES
A. For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified.
B. The average end area method will be used to compute volumes of excavation or embankment. However, if in the judgment of the CO, the average end area method is impractical, measurement will be made by volume in hauling vehicles or by other three dimensional methods.
C. Structures will be measured according to lines SHOWN ON THE DRAWINGS or as altered by the CO in writing to fit field conditions.
D. For items that are measured by the linear foot, such as pathways, sewer lines, and water lines, measurements will be made parallel to the base or foundation upon which the structures are placed.
E. For aggregates weighed for payment, the tonnage will not be adjusted for moisture content, unless otherwise provided in SPECIAL PROJECT SPECIFICATIONS.
F. For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when bituminous material has been lost from the vehicle or the distributor, has been wasted, or has otherwise not been incorporated into this work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day at the times the CO directs. Each vehicle shall bear a plainly legible identification mark.
G. When bituminous materials are shipped, net certified weights, or volume corrected for loss of foaming, can be used for computing quantities.
H. For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
1.03 UNITS OF MEASUREMENT
A. Payment will be by units defined and determined according to U.S. Standard measure as follows:
Acre – Make longitudinal and transverse measurements for area computations horizontally.
Cubic Yard - A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.
c. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery.
Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.
Each - One complete unit, which may consist of one or more parts. The quantity is the actual number of units completed and accepted.
Gallon – The quantity may be measured by any of the following methods:
d. Measured volume container.
e. Metered volume. Use an approved metering system
f. Commercially packaged volumes.
Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor.
Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.
Lump Sum – Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
MFBM - One thousand board feet measure based on nominal widths, thicknesses, and extreme usable length of each piece of lumber or timber actually incorporated in the job.
Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.
Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.
Square Foot - Measure on a plane parallel to the surface being measured or horizontal.
Square Yard – Measure on a plane parallel to the surface being measured or horizontal.
Station - One hundred linear feet measured horizontally.
Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.
Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.
Ton - Short ton consisting of 2,000 pounds.
Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile.
1.04 METHODS OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:
1. Designed Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
2. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.
3. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.
4. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.
5. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
2. PART 2 - PRODUCTS (NOT APPLICABLE)
3. PART 3 - EXECUTION (NOT APPLICABLE)
4. PART 4 – MEASUREMENT AND PAYMENT (NOT APPLICABLE)
END OF SECTION 00100
SECTION 01200
1. PART 1 – GENERAL
MOBILIZATION PAYMENT PROCEDURES
1.01 MEASUREMENT AND PAYMENT
A. This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project sites, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project sites.
2. PART 2 - PRODUCTS (NOT USED)
3. PART 3 - EXECUTION
3.01 EQUIPMENT PREPARATION
A. To reduce the risk of noxious weeds being introduced into the project area, the following practices shall be followed:
1. All heavy equipment (excluding passenger vehicles) shall be clean and free of soil, vegetative matter, or other debris that may contain or hold weed seeds prior to entering National Forest System lands.
2. Off-road equipment shall be made available for inspection by the CO prior to work to ensure it is free of all soil, seeds, vegetative matter, and other debris that could hold or contain seeds.
3. Material sources (e.g. rock or borrow sites) shall be inspected to ensure that they are weed-free before use and transportation. If material from a stockpile that is weed-infested is used, the top layers shall be scraped off to remove seeds and plants, and treat before any use of this pit material.
4. Erosion control materials (seed, straw, hay) shall be certified free of weed seed and plant parts.
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:
A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization for that particular site, or 5 percent of the original contract amount, whichever is less, will be paid.
B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization for that particular site, or 10 percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work at a particular site, any unpaid amount for mobilization for that site will be paid.
D. The total of all payments shall not exceed the original contract amount for this item.
4.02 BASIS OF PAYMENT
A. Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01200-1 Sutton CG - Mobilization Lump Sum (Sites B, C, and D) 01200-2 Carter Lake CG - Mobilization Lump Sum
OPTIONAL ITEM
PAY ITEM DESCRIPTION PAY UNIT
012002-3 Sutton CG - Mobilization Lump Sum (Picnic Area)
END OF SECTION 01200
SECTION 01300
1. PART 1 - GENERAL
SUBMITTALS
1.01 SUMMARY
A. The following submittal requirements and procedures are required in addition to and as an explanation of FAR Clause 52.236-21 and AGAR Clause 452.236-76.
B. Section Includes:
1. These requirements are for all submittals including but not limited to, product data, samples, shop drawings, catalogs and manufacturer’s literature, schedules, substitution requests, layouts, as-built drawings, maintenance and operating data, guarantees, etc.
2. Submittals shall be made for all fabricated items furnished and installed as specified.
3. Work shall not commence on any item requiring submittals until submittals are approved in writing by the COR.
1.02 SUBMITTAL REQUIREMENTS
A. All submittals shall be accompanied by a submittal transmittal form.
B. Equipment numbers shall be listed for items being submitted.
C. Submittals for various items shall be made with a single form when the items taken together constitute a manufacturer’s package or are so functionally related that expediency indicates checking or review of the group or package as a whole.
D. Submit three sets of catalog cuts, shop drawings and manufacturer's installation, operating and maintenance instructions for all material and equipment requiring submittals to the CO.
E. Obtain written approval for the above submittals prior to construction, assembly, and delivery.
F. Submittals shall have sufficient detail to determine if ratings, characteristics, and physical construction are equivalent to those specified.
G. Where manufacturer's catalog sheets are used, indicate the specific items to be supplied in ink either by arrow, encircled on the sheet, or the inapplicable portion blocked out. List manufacturer's name, contract, section and drawing sheet reference number on each catalog sheet. Identify where equipment is to be used, if not obvious.
H. Submittals shall show any changes to be made resulting from substitution of equipment or materials for those that are specified.
1.03 TYPE AND NUMBER REQUIRED:
A. Manufacturer’s Literature: Submit three (3) copies of required manufacturer’s literature. Modify product data by deleting information which is not applicable to the project, or by marking each copy to identify pertinent products. Supplement standard information, if necessary, to provide additional information applicable to project.
B. Correcting: The Contractor shall make any corrections required by the CO and shall resubmit corrected submittals until accepted. The Contractor shall provide for enough time for reviews, revisions and re-submittals to not delay the work.
1.04 MATERIAL PRODUCT SUBMITTALS
A. Material submittals shall be sufficient to demonstrate compliance with the Specifications and Drawings. The following list may not be complete, but is provided for the Contractor’s convenience.
1. Pressure Pipe and Fittings
2. Sewer Pipe and Fittings
3. Sewer Line and Electrical Line Marking Tape
4. Septic Tanks
5. Septic Tank Accessories and Discharge Assembly Components
6. Effluent Filters
7. Pressure Pumps
8. Float Switch Assemblies
9. External Splice Boxes
10. Sewage Control Panels and sewage Alarm Systems
11. Safety Plan
1.05 OTHER SUBMITTALS
A. Work Progress Schedule: to ensure adequate planning and execution of the work so that the work is completed within the respective number of calendar days allowed in the contract; and to assist the CO in appraising the reasonableness of the proposed schedule and evaluating the progress of the work, prepare the following:
B. Within ten (10) calendar days after being awarded the Contract, prepare and submit for the CO’s information, a Work Progress Schedule using estimated times and events, if necessary. The progress schedule shall be related to the entire project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the work.
C. Update the schedule as needed and resubmit it to the CO for reference with each progress payment request.
D. Fire Protection Requirements Forms – supplied by the Government at the post-award conference.
1. Fire Protection and Suppression Form R6-FS-6300-52
2. Additional Fire Precautionary Measure 1 – Tank Truck Form R6-FS-
6300-53
3. Additional Fire Precautionary Measure 2 – Communications Form R6-
FS-6300-54
1.06 CONTRACTOR’S VERIFICATION
A. General
1. All submittals are instruments of the Contractor. The Contractor shall carefully check all items of the Contractor’s subcontractors and supplier as well as the Contractor’s own before transmitting them as the Contractor’s submittals to the CO.
B. Determine and verify:
1. Field measurements.
2. Field construction criteria.
3. Catalog numbers and similar data.
4. Conformance with specifications.
5. Stamp and initial all submittals indicating that they have been reviewed prior to sending to CO.
C. QUESTIONS: The Contractor shall review all submittals and include answers to any questions or clarifications required by subcontractors and, in particular, shall ascertain that the submittals meet all requirements of the Contract Documents.
1.07 SUBMITTAL IDENTIFICATION AND PACKAGING
A. IDENTIFICATION: All submittals shall be identified and have the following information:
1. Project name and location.
2. Subcontractor’s, vendor’s and/or manufacturer’s name, address, and telephone number.
3. A unique number, sequentially assigned, shall be noted on the transmittal form accompanying each item submitted.
4. Product identification or shop drawing title, number, revision and data as applicable. Where product data contains more than one product, model, selection, etc., clearly mark and identify the information intended to be reviewed by CO.
5. Reference to Contract Drawing and/or Specifications Sections as applicable.
6. Field dimensions, clearly identified as such.
7. Identification of deviations from Contract Documents.
8. Identification of revisions on re-submittals.
9. Contractor’s stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and with requirements of the Work and of the Contract Documents.
B. PACKAGING OF SUBMITTALS
1. All submittals shall be adequately wrapped or packaged to prevent damage during delivery.
2. Coordination of Submittals
C. GENERAL: Prior to submittal for CO’s review, use all means necessary to fully coordinate all material, including the following procedures:
1. Determine and verify all field dimensions and conditions, materials, catalog numbers and similar date.
2. Coordinate as required with all trades and with all public agencies involved.
3. Secure all necessary approvals from public agencies and others and signify by stamp, or other means, that they have been secured.
4. Clearly indicate all deviations from the Contract Documents.
5. On re-submittals, clearly indicate all revision or changes from original submittal.
D. GROUPING OF SUBMITTALS: Unless otherwise specifically permitted by the CO make all submittals in groups containing all associated items; the CO may reject partial submittals as not complying with the provisions of the Contract Documents.
1.08 TIME SCHEDULES
A. GENERAL
1. Make all submittals far enough in advance of schedule dates of installation to provide all required time for reviews, for securing necessary approvals, for possible revisions and re-submittal, and for placing orders and securing delivery.
2. In scheduling, allow at least (10) calendar days for the CO’s review following receipt of each submittal. On re-submittals, allow at least 7 calendar days.
3. Though the CO may utilize other agents (inside or outside the USFS) to assist in submittal review, only the CO has the authority to issue action in regards to submittals.
B. DELAYS: The Contractor shall provide for enough time for reviews, revisions and re-submittals to not delay the work. Costs of delays occasioned by tardiness of submittals shall be borne by the Contractor.
C. SHOP DRAWINGS AND PRODUCT DATA
1. The Contractor shall make any corrections required by the
Government and shall resubmit corrected Shop Drawings, and manufacturer’s literature until accepted.
2. When submittals have received final acceptance, the Contractor shall make distribution to all parties concerned.
2. PART 2 - PRODUCTS (NOT USED)
3. PART 3 - EXECUTION (NOT USED)
4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION 01300
SECTION 02080
5. PART 1 – GENERAL
UTILITY MATERIALS
1.01 SUMMARY
A. This section specifies the furnishing of utility materials.
Installation of these items is covered in other sections of the specifications.
1.02 RELATED SECTIONS
B. 02530 – Sanitary Sewage C. 02543 – Septic Tanks and Septic Components
1.03 DEFINITIONS
D. Pipe Sizes. All references to pipe sizes refer to the nominal diameter.
1.04 SUBMITTALS
A. Submit sufficient descriptive literature to demonstrate compliance with these specifications for the following:
B. Pressure pipe and fittings.
C. Gravity sewer pipe and fittings.
1.05 QUALITY ASSURANCE
A. All pipe materials and components shall comply with the Oregon Administrative Rules, 340, Division 071 and 073 (CONSTRUCTION STANDARDS): http://www.deq.state.or.us/wq/onsite/rules.htm
1. PART 2 – PRODUCTS
2.01 MANUFACTURER
A. All pipe of a given type, material, and size shall be the product of a single manufacturer.
2.02 MATERIALS
A. Pressurized Sewer Lines.
1. Pressurized sewer lines shall conform to OARs 340-073-0060(3), and OARs 340-071-0275
2. Polyvinyl Chloride (PVC).
B. Gravity Sewer Pipe and Fittings.
1. Gravity sewer pipe and fittings shall conform to OARs 340-073-
2. Polyvinyl Chloride (PVC).
C. Joints Between Dissimilar Materials.
1. Use flanges or couplings manufactured specifically for the types of pipe being joined and having a minimum pressure rating, or pressure class (as applicable) equal to or greater than the lower pressure rating or class of the pipes being joined.
2. For metallic to plastic pipe connections, use Schedule 40 PVC male adaptor and threaded metallic coupling fittings. Do not thread plastic pipe.
D. Bushings.
1. Where reducing fittings are shown on the Drawings, bushings may be used if space is not available and if approved by the COR.
E. Specialties.
1. Saddles.
a. Plastic Pipe, 1 inch through 4 inch.
b. Two-piece polypropylene body which surrounds pipe, with 2 stainless steel straps and stainless steel reinforcing cap.
2. Expansion Joint.
a. Body of fabric and rubber compounds reinforced with steel rings.
Tube of leak-proof lining of abrasive resistant rubber or synthetic.
Cover of natural rubber or synthetic. Flanges of duck and rubber, full-faced with 150 pounds ANSI standard drilling. Double arch unless otherwise shown on the Drawings. Red Valve Company, Redflex Division or approved equal. Retaining rings as supplied by manufacturer.
3. Flexible Couplings.
a. Steel or cast iron.
b. Rockwell, Dresser, or approved equal.
c. Couplings supported by 4 inch thick concrete slabs located under joint lines.
4. Pipe Supports.
a. Cast iron saddle, locknut nipple and reducer to provide vertical adjustment. Grinnell Figure 264, manufactured by Anvil International, or approved equal.
5. Thread Compound and Tape.
a. A lead free, non-hardening/non-corrosive, anti-seize sealing compound or tape approved for use in joints and threaded parts of potable water systems.
6. Building Connectors.
a. High molecular weight elastomeric plastic compression sealing ring or sleeve coupling with stainless steel clamps and bolts. Fernco or approved equal.
5. PART 3 - EXECUTION
3.01 INSTALLATION
A. All utility materials shall be installed per manufacturer’s recommendation and instructions, according to State ODEQ’s regulations, and/or as specified in Section 02530.
6. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION 02080
SECTION 02230
6. PART 1 - GENERAL
CLEARING AND GRUBBING
1.01 SUMMARY
A. This section specifies clearing, grubbing, removing, and disposing of all vegetation and debris within the clearing limits except objects designated to remain. Work includes preserving objects designated to remain.
B. Clearing Limits. Clearing limits are within 3 feet on either side of utility center lines or area designated for septic tanks, unless otherwise shown on the drawings or staked on the ground.
1.02 RELATED SECTIONS
A. Section 02317 – Excavation and Backfill for Structures B. Section 02318 – Excavation and Backfill for Utilities
1.03 DEFINITIONS
A. Merchantable Timber. All logs and poles, at least 1/3 sound, having a minimum diameter of 6 inches under the bark, a minimum length of 8 feet, and a minimum of 10 board feet sound wood shall be considered merchantable timber.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.01 SURFACE PREPARATION
A. Clearing.
1. As needed, clear brush, vegetation, and other objects not designated to remain within the clearing limits.
2. Clear only trees designated for removal. Cut stumps to within 12 inches of the ground surface.
B. Grubbing.
1. Grub all stumps, brush, and roots (to a minimum 3” diameter) within the clearing limits.
3.02 TREE REMOVAL AND PRESERVATION
A. Falling of Trees.
1. Two Douglas trees to be cut have been identified in the area for the new drain-field at Carter Lake CG (7” and 15” DBH).
2. Fall trees toward the center of the area to be cleared.
3. Use controlled falling to prevent injury or defacement to structures, other trees, or property.
4. Treatment of Trees and Shrubs Damaged by Contractor.
a. Trim branches flush with tree.
b. Within 3 days of the damage, treat all cut or scarred surfaces of trees or shrubs designated to remain. Use a product prepared especially for tree surgery.
3.03 DEBRIS DISPOSAL
A. Dispose of both trees identified in 3.02 B. Dispose of all debris (except logs and rocks) legally off Government land.
C. Place logs and rocks in campground area as indicated by CO.
PART 4 - MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Measurement will be of the completed Clearing and Grubbing for the utilities, paths, and structures.
4.02 BASIS OF PAYMENT
A. Payment will be lump sum.
02230-1 Clearing and Grubbing Lump Sum
Sutton CG, Sites B, C, and D 02230-2 Clearing and Grubbing Lump Sum
Carter Lake CG
END OF SECTION 02230
SECTION 02310
GRADING
1.01 SUMMARY
A. This section specifies grading requirements for project.
1.02 RELATED SECTIONS
02230 - Clearing and Grubbing.
02317 - Excavation and Backfill for Structures.
02318 - Excavation and Backfill for Utilities.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Fill Material. Material free from frozen or organic material, and rocks larger than 2 inches.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. General.
1. Grade around buildings, trails, and drain-field areas to the appropriate contours and elevations of the site and smoothly blend into existing contours. Grade to uniform levels or slopes between points where grades or contours are given, round surfaces at abrupt changes in levels.
Slope ground away from building walls and walks to facilitate drainage.
2. Hand rake areas within the grading limit lines. Remove all roots, brush, weeds and stones larger than 2 inches from the finish graded surface.
B. Grading around Buildings
1. Grade all areas to produce uniform slopes between spot elevations and contours.
2. Control grading within 5 feet of buildings and all other structures to prevent water from running into excavated areas. Remove all water which accumulates in excavated areas.
C. Excess Material.
1. Remove excess material, not required for grading, from the site.
4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION
SECTION 02317
EXCAVATION AND BACKFILL FOR STRUCTURES
1.01 SUMMARY
A. This section specifies excavation and backfill for septic tanks; including furnishing, hauling and placing of backfill material; disposal of excess or unsuitable backfill material; and grading.
B. Material to be excavated is unclassified.
C. Coordinate alignment of the new septic tanks on site with the CO to determine proper excavation locations.
1.02 RELATED SECTIONS
A. 02230 - Clearing and Grubbing B. 02310 – Grading C. 02318 – Excavation and Backfill for Utilities D. 02543 – Septic Tanks and Septic Components
1.03 OWNER’S INSTRUCTIONS
A. Conform to the dimensions indicated on the Drawings.
B. Extend excavation a sufficient distance from walls and footings to allow placing and removal of forms.
C. Undercutting will not be permitted.
D. Prevent surface water from entering the excavation.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Backfill Materials.
1. Backfill materials shall contain no organic or frozen material.
a) Designated Backfill Material.
1. Excavated material containing no rock larger than 3 inches.
b) Crushed Rock.
1. Crushed aggregate, conforming to the requirements of AASHTO M147, grade D.
c) Bedding Material.
1. 1/4 inch minus pea gravel or sand; 100 percent passing the #4 sieve.
d) Topsoil.
1. Loam or excavated topsoil with no rocks larger than 2 inches in greatest dimension.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Excavation.
1. Topsoil Material.
a) Remove surface material to a depth of 6 inches in areas to be excavated. Stockpile this material separately from other excavated material, for use in grading the site.
2. Other Material.
a) Extend excavation a minimum of 6 inches beyond exterior finished footing dimensions, to allow for placing and removal of forms and other appurtenances. Do not undercut.
b) Grade areas in vicinity of construction to prevent surface water from running into excavated areas.
3. Over-excavation under Footings.
a) Increase the depth of the footing by the amount of over-excavation.
Pour entire footing, including over-excavated volume, in one continuous pour to rest on undisturbed soil.
B. Backfill.
1. Preparation for Backfill.
a) Remove all forms from structure, and clean the excavated area of all debris. Remove any standing water from excavation. Prior to backfill, obtain approval from CO to backfill excavated area.
b) Backfilling all Structures.
1) Do not backfill in a manner to cause structure to become point loaded. Place backfill in uniform lifts around structure.
2. Backfilling of Concrete.
1) Do not backfill until concrete has been in place for 14 days or a strength of 1,000 psi has been reached, unless allowed in writing by CO.
3. Backfill Over Pipes Under Slabs.
1) Use designated backfill material or crushed rock. Place in layers not greater than 6 inches thick to 6 inches below slab. Compact at or near optimum moisture by hand tamping or mechanical vibrating tamper with 2 passes of the entire lift surface. Finish backfill lift as specified for Over-excavation Backfill Under Slabs.
4. Over-excavation Backfill Under Slabs.
1) Restore grade for slabs as follows:
a) Within 2 inches of slab bottom: Use bedding material.
b) From 2 inches to 6 inches below slab: Use crushed rock.
c) Over 6 inches below slab: Use general backfill material.
d) Place material in 6 inch maximum lifts and compact with a minimum of 2 passes over the entire layer with mechanical vibrating tamper.
5. Placing Backfill Material.
1) Place all backfill material in 12 inch maximum lifts.
Compact each lift with a minimum of 2 passes over the entire layer with mechanical tampers.
2) Do not use tracked or wheeled equipment to compact backfill.
6. Topsoil.
1) Deposit original surface material as the final backfill lift and compact with a minimum of 2 passes over the entire surface with mechanical tamper.
E. Grading.
1. Grade surface uniformly between spot elevations or contours to match existing adjacent ground elevations. Slope surface to provide drainage away from structures.
4.02 REPAIR/RESTORATION
A. Underground Utilities.
1. Stop all work associated with damage to existing utilities, and notify CO. Repair utility as directed by the CO, at the expense of the Contractor.
4.03 EXCESS EXCAVATED MATERIAL (SUITABLE AND UNSUITABLE)
A. Remove all excess or unsuitable material from the work area (except boulders), and legally dispose off of government property.
5.
6. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION 02317
SECTION 02318
EXCAVATION AND BACKFILL FOR UTILITIES
1.01 SUMMARY
A. This section specifies excavation and backfill for utilities, including excavation; furnishing and placing of backfill material; disposal of excess or unsuitable backfill material(s); and grading.
B. Material to be excavated is unclassified.
1.02 RELATED SECTIONS
A. 02230 – Clearing and Grubbing B. 02310 – Grading C. 02317 – Excavation and Backfill for Structures D. 02530 – Sanitary Sewerage
1.03 PROJECT CONDITIONS
A. Contractor shall be responsible for locating and identifying underground utilities, which include water lines and electrical lines.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Backfill Materials.
1. Backfill material shall contain no frozen or organic material.
2. Bedding Material. Fine soil or sand, 100 percent passing the # 4 sieve; or crushed rock less than 1/2 inch.
3. Crushed Rock. Crushed aggregate, meeting the requirements of
AASHTO M147 grading D.
4. Select Material. Fine soil or sand, 100 percent passing the # 4 sieve.
5. Select Excavated Material. Excavated material containing no rocks larger than 6 inches in largest dimension.
6. Topsoil. Soil or loam containing no rock larger than 2 inches.
Loam or excavated topsoil with no rocks larger than 2 inches in greatest dimension.
PART 3 – EXECUTION
3.01 CONSTRUCTION
A. Excavation
1. Excavation shall not begin until all clearing and grubbing work has been completed except for final debris disposal. Operations shall be in compliance with the requirements and restrictions of OSHA, and the Oregon Occupational Safety and Health Code.
2. All trenches shall be excavated in reasonably close conformity with the Drawings. Any shifting or change from the Drawings must receive prior approval by the CO in writing.
3. Lay utilities in continuous open trench.
4. Trim roots flush with trench wall.
B. Over-excavation.
1. Restore to grade any over-excavation by backfilling with select material.
C. Salvage of Topsoil.
1. Excavate top 6 inches of surface material and stockpile separately for use as topsoil backfill material.
D. Wet Excavation.
1. If water is encountered during trench excavation, provide adequate pumping equipment and piping to keep trench free from water and dispose of the water without damage to adjacent property. Separate payment will not be made for pumping of water from trenches or for excavation of material rendered unsuitable as a result of water encountered.
A. Unsuitable Material.
1. Where unsuitable material is encountered in the trench bottom, as determined by the CO, excavate the trench below grade to the depth specified by the CO.
B. Back-sloping, Sheeting and Shoring.
1. Back-sloping of trench walls will be allowed only upon prior written approval of the CO.
2. Remove all shoring and sheeting when construction is completed.
Withdraw to prevent trench wall caving while backfilling.
C. Excavated Material.
1. Pile excavated material at the side of the trench where it will give the best protection for the work.
2. Leave adequate space between the toe of the spoil pile and edge of trench to prevent material from falling into the trench.
D. Backfill.
1. Do not place backfill until installation of sewer lines/pipes have been approved by the CO.
2. Before compacting backfill other than rock or sand, prepare material to a water content that will permit proper compaction by either aerating the material if it is too wet, or spraying the material with water if it is too dry.
3. Thoroughly mix each lift before compaction to assure uniform distribution of water content.
4. Do not compact material above pipe until there are 6 inches of cover over the pipe.
5. Compact each lift with the required number of passes of a mechanical vibrating tamper over the entire layer.
1. Select Material.
1) Place in 6 inches lifts or less and compact with a minimum of 3 passes over the entire lift surface.
2. Bedding Material.
1) Place in lifts 4 inches or less in thickness and compact with a minimum of 3 passes over the entire lift surface.
Compact around pipe barrel and bells by hand tamping.
3. Select Excavated Material.
1) Distribute large rocks so they are individually surrounded by fine materials. Place select excavated material as follows where backfill classes are indicated on Drawings.
a) Class B: Place in l2 inch lifts or less and compact each lift with 3 passes of tamper.
3.02 REPAIR/RESTORATION
E. Contractor shall be responsible for locating and protecting all existing underground utilities to remain.
F. Damage to existing underground utilities. Stop all work associated with damage to existing utilities, and notify the CO. Repair at Contractor's expense.
G. Surface Restoration. Restore all surfaces in kind and mound final un-compacted lift above finished grade.
H. Final Finish. After the utility installation and backfill has been completed, finish all disturbed areas, except trench area required to be mounded, to a smooth, uniform grade and texture, well blended to the original contours, showing minimum evidence of construction activity.
3.03 CLEANING
A. Disposal of Excess of Excavation and Unsuitable Material. Spread excess excavation materials, without mounding, within the clearing limits as designated by the CO.
B. Remove all unsuitable material from the work area (except boulders), and legally dispose off of government property.
3.04 SCHEDULES
A. Backfill and restore surface materials of utility line trenches located in existing roadways, parking areas, and driveways, within 7 days after approval to place backfill by CO.
PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION 02318
SECTION 02530
SANITARY SEWAGE
1.01 SUMMARY
A. This section specifies construction of gravity and pressurized distribution sanitary sewer lines.
1.02 RELATED SECTIONS
A. 02080 - Utility Materials.
B. 02230 - Clearing and Grubbing.
C. 02318 - Excavation and Backfill for Utilities.
1.03 QUALITY ASSURANCE
A. Installation of sanitary sewer system shall be done by a Licensed, Oregon
Department of Environmental Quality (ODEQ), State Certified Installer.
B. Work and materials shall meet the Oregon Administrative Rules (OAR) for
Onsite Wastewater Treatment Systems, OARs 340-052, 340-071, and 340- 073.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Marking Tape.
1. Plastic marking tape, printed with the words "Buried Sewer" or similar. Terra-Tape, or approved equal.
B. Pressurized Distribution Systems.
1. Pressurized Distribution Systems. Pressurized Distribution Systems shall satisfy the requirements in OAR 340-071-0275 and OAR 340-073-0060
a. Polyvinyl Chloride (PVC), schedule 40.
C. Sewer Pipe and Fittings.
1. Gravity sewer pipe and fittings shall satisfy the requirements in
OAR 340-073-0060
a) Polyvinyl Chloride (PVC), schedule 40.
D. Sewer System Clean-outs.
1. Install cleanout(s) at the end of each pressurized sewer line.
Cleanouts shall satisfy the requirements in OAR 340-052, Appendix A.
E. Filter fabric.
1. Filter fabric shall satisfy the requirements in OAR 340-073-0041.
3. PART 3 - EXECUTION
3.01 PREPARATION
A. Fine Grading of Bedding Material.
1. Fine grade the pipe bedding with hand tools, using lines, straight edges, and templates. Provide support for pipe on at least the bottom quarter of the circumference and throughout its length. Tool bell holes no larger than necessary to permit making the joint.
3.02 INSTALLATION
A. Sewer-line Trench.
1. Sewer lines will be staked in the field by the CO.
2. Install sewer line trench according to State regulations, Oregon OSHA, and OARs 340-052, 071, and 073
B. Placement of Pipe.
1. Sewer lines will be staked in the field by the CO.
2. Lower pipe lengths carefully into the trench. Do not drop pipe during unloading or placement. Dropped pipe sections will be subject to rejection by the CO.
3. Insert spigot end to the depth mark. Support pipe to insure true alignment and an invert which is smooth and free from roughness or irregularity. When the pipe is in place, support pipe barrel by placing and tamping sufficient pipe bedding along side of pipe to prevent movement.
C. Protection and Cleaning of Pipe Interior.
1. Close the pipe end with a watertight stopper at the end of each day work. Clean sewer lines of all rocks, sticks, and other debris at the completion of construction.
D. Approval.
1. Do not begin backfill until pipeline installation is accepted, in writing, by the CO.
E. Clean-outs. Install clean-outs according to manufacturer’s instructions and requirements in OAR 340-052, Appendix A.
F. MISCELANEOUS APPURTENANCES
1. Pipe Anchors. Place concrete pipe anchors against undisturbed soil.
2. Marking Tape. Place metallic core marking tape vertically, two feet, above all buried sewer lines during backfilling.
3. Filter fabric. Install filter fabric according to manufacturer’s instructions.
3.03 FIELD QUALITY CONTROL
A. Testing - Low Pressure Air Test.
1. Test all sections of the gravity sewer line, using low pressure air test.
2. Perform test in the presence of the CO.
3. Test sections from manhole to manhole, or manhole to cleanout for line ends.
B. Equipment.
1. Supply all test equipment required including air test stand, test plugs, stop watch, calibrated test gauge reading 0 to 15 psi maximum with 1/4 or 1/2 psi divisions, hoses and air compressor.