RFP Road 23 Paving.doc

DOC document 1 MB Posted

Attached to
RECOVERY ROAD 23 PAVING AND RECONSTRUCTION-OLYMPIC NATIONAL FOREST, WASHINGTON
Solicitation number
AG-0489-S-10-0369
Issued by

About this file

Request For Proposals SF1442 Schedule of Pay Items specifications terms conditions solicitation provisions

View the file

Other files

File Type Posted
Amendment_2.pdf PDF
Amdt2_Continuation.docx DOCX document
Amendment_1.pdf PDF
Drawings1-25.pdf PDF
WA20100001.docx DOCX document
WA MOU Hydraulic Projects.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-0489-S-10-0369

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

X NEGOTIATED (RFP)

3. DATE ISSUED

4/5/10

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

379659

6. PROJECT NO.

7. ISSUED BY

CODE

0489
8. ADDRESS OFFER TO

EROC Northwest Contracting Office @ Umpqua National Forest

2900 NW Stewart Parkway – Room 220

Roseburg, OR 97470

EROC Northwest Contracting Office @ Umpqua National Forest

2900 NW Stewart Parkway – Room 220

Roseburg, OR 97470

9. FOR INFORMATION

CALL:

A. NAME

Rick Greaves/Lupe Cisneros B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 360-956-2288 / 360-956-2353

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

RECOVERY

ROAD 23 PAVING & RECONSTRUCTION

OLYMPIC NATIONAL FOREST

HOOD CANAL RANGER DISTRICT

MASON COUNTY, WASHINGTON

Price Range: The Government’s estimate is between $250,000 and $500,000.

This solicitation is issued under the provisions of the American Recovery and Reinvestment Act of 2009.

TAS::12 1102::TAS RECOVERY

THIS IS A FULL & OPEN COMPETITION

NOTE: Address/Mail/Deliver proposals to BLOCK 8 address. Bid guarantees must be received no later than the specified closing date. Bid Bonds must be originals.

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving

FORMCHECKBOX

award, X notice to proceed. This performance period is FORMCHECKBOX mandatory, X negotiable. (*See Part I Section F.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

X YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

TEN (10)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 8;30 A.M. (hour) local time 05/5/10 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee X is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS: PLACE AMOUNTS IN SECTION B

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

1. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

TABLE OF CONTENTS

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

Schedule of Pay Items

Notes

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1
Scope Of Contract/Description of Work
C-2
Project Location
C-3
Price Range
C-4
FAR 52.236-4Physical Data
C-5
FAR 52.211-3Availability of Specifications or Product Descriptions Not Listed in the GSA Index of Federal Specifications and Standards
C-6
Applicable Specifications And Material Certifications
C-7
AGAR 452.211-73 Attachments To Statement Of Work/Specifications
C-8
Bonding

SECTION D – PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E – INSPECTION AND ACCEPTANCE

E-1
FAR 52.252-2 Clauses Incorporated by Reference
E-2
AGAR 452.246-70 Inspection and Acceptance
E-3
Conformity With Plans and Specifications

SECTION F – DELIVERIES OR PERFORMANCE

F-1
FAR 52. 252-2 Clauses Incorporated by Reference
F-2
FAR 52. 211-10 Commencement, Prosecution, And Completion Of Work
F-3
Suspension of Work For Other Than Government’s Convenience

SECTION G - CONTRACT ADMINISTRATION DATA

G-1
AGAR 452.215-73 Post-Award Conference
G-2
Designation of Contracting Officer’s Representative And Inspectors
G-3
Notification of Subcontracting

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1
Erosion Control Measure
H-2
Landscape Preservation
H-3
Cleaning of Equipment
H-4
Plan For Weather Caused Suspension Of Work
H-5
Industrial Fire Precaution Levels
H-6
Use Of Premises
H-7
Storage And Stockpiling Of Materials
H-8
Local Disposal Sites
H-9
Blasting
H-10
Hazardous Conditions Safety Plan Certification
H-11
Salvage Rights
H-12
Value Engineering
H-13
Final Cleanup
H-14
Costing of Claims or Modifications
H-15
Payment For Incidental Items
H-16
Payment for Materials Delivered Off The Site
H-17
Payment for Performance and Payment Security Expenses
H-18
Release of Performance and Payment Bonds
H-19
Order of Precedence – Construction

SECTION I - CONTRACT CLAUSES

I-1
FAR 52.252-2 Clauses Incorporated By Reference
I-2
FAR 52.503-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
I-3
FAR 52.204-7 Central Contractor Registration
I-4
FAR 52.204-11 American Recovery and Reinvestment Act – Reporting Requirements
I-5
FAR 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees
I-6
FAR 52.222-54 Employment Eligibility Verification
I-7
FAR 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods - Buy American Act - Construction Materials
I-8
FAR 52.228-1 Bid Guarantee
I-9
AGAR 452.228-70 Alternative Forms of Security

SECTION J - LIST OF ATTACHMENTS

J-1
Definitions and Acronyms
J-2
List of Standard Specifications
J-3
Supplemental Specifications
J-4
Fire Plan
J-5
Bid Bond
J-6
QUESTIONNAIRE
J-7
Davis-Bacon Act Wage Decision WA20100001 dated 03/12/2010 [separate Word file]
J-8
Washington State MOU Regarding Hydraulic Projects [separate pdf file]
J-9
Project Drawings [separate pdf file]

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

Note regarding VETS-100

K-1
AGAR 452.219-70 Size Standard and NAICS Code Information
K-2
FAR 52.204-8 Annual Representations And Certifications
K-3
FAR 52.209-5 Certification Regarding Responsibility Matters
K-4
FAR 52.219-28 Post-Award Small Business Program Representation
K-5
FAR 52.223-13 Certification of Toxic Chemical Release Reporting
K-6
Government Employees, Former USDA Employees And USDA Retirees

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L-1
FAR 52.252-1 Solicitation Provisions Incorporated By Reference
L-2
FAR 52.216-1 Type Of Contract
L-3
FAR 52.222-5 Davis Bacon Act – Secondary Site of the Work
L-4
FAR 52.222-23 Notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity for Construction
L-5
FAR 52.225-22 Notice Of Required Use of American iron, Steel, and Other Manufactured Goods - Buy American Act - Construction Materials
L-6
FAR 52.233-2 Service Of Protest
L-7
FAR 52.236-27 Site Visit (Construction)
L-8
Technical and Business Proposal
L-9
AGAR 452.215-72 Amendments to Proposals
L-10
Notice of Required Bid Guarantee
L-11
Facsimile Bid Bonds Not Acceptable
L-12
Proposal Submission Documents

SECTION M – EVALUATION FACTORS FOR AWARD

M-1
Evaluation of Offers
M-2
Award Determination

THIS PAGE INTENTIONALLY BLANK

PART I—THE SCHEDULE

SCHEDULE OF ITEMS

ROAD 23 PAVING & RECONSTRUCTION

OLYMPIC NATIONAL FOREST

HOOD CANAL RANGER DISTRICT

ITEM

NO.

DESCRIPTION
QUANTITY
PAY

UNIT

UNIT

PRICE

AMOUNT

15101
Mobilization
1
Lump Sum
XXXXX
$___________
15201
Construction survey and staking, method I, tolerance B
1
Lump Sum
XXXXX
$___________
15401
Contractor testing
1
Lump Sum
XXXXX
$___________
15713
Soil Erosion and Pollution Control
1
Lump Sum
XXXXX
$___________
20105
Clearing and grubbing,

disposal of tops and limbs g, logs i, stumps j or g

1
Lump Sum
XXXXX
$___________
20304
Removal of existing bituminous road surface
1
Lump Sum
XXXXX
$___________
20401
Roadway excavation, Compaction method c, finishing method A
9609
Cubic Yard
$_________
$___________
25110
Hand-placed riprap
9
Cubic Yard
$_________
$___________
30103
Aggregate base, grading D or E,

Compaction method D

2279
Cubic Yard
$_________
$___________
40301
Hot asphalt concrete pavement class Wash. DOT C1.1/2-inch PG 58-22 for traffic levels <0.3 million ESAL’s
2710
Ton
$_________
$___________
40902
Surface treatment aggregates designation “C”
210
Cubic Yard
$_________
$___________
40904
Emulsified asphalt grade Wash. DOT section 9-02.1(6) A Polymerized Cationic Emulsified Asphalt CRS-2P
37
Ton
$_________
$___________
41101
Prime coat grade CRS-1
35
Ton
$_________
$___________
41201
Tack coat grade CSS-1h
4
Ton
$_________
$___________
60201
24 inch pipe culvert
402
Foot
$_________
$___________
62528
Seeding, Fertilizing, and Mulching, Hydraulic Method
1
Lump Sum
XXXXX
$___________
63301
Sign system
4
Each
$_________
$___________
63406
Pavement markings type A
1
Lump Sum
XXXXX
$___________

TOTAL ALL PAYMENT ITEMS:

Offeror Name:

Mailing Address:

City, State, Zip:

Phone

Phone

Fax

E-Mail:

DUNS NUMBER:

TAX IDENTIFICATION NUMBER (TIN):

NOTES

BID Items: Offerors must bid on all items. If Offeror does not intend to charge for an Item, a price of 0” or “NO COST” should be shown.

Bond Premiums: Bond premiums shall be included under item 15101 Mobilization. See payment terms covered under specification section 151 Mobilization and the standard contract payment clauses.

Proposal Submission Documents: See Section L for a list of required Proposal Submission Documents and other instructions

Central Contractor Registration: Prior to any contract award Contractors must be currently registered in the Central Contractor Registration (CCR) System, which established Electronic Fund Transfer for payment purposed under federal contracts. See Section I (52.204-7).

Ref: http://www.ccr.gov Representation and Certifications: Contractors shall provide Representations and Certifications electronically via the On line Representations and Certifications Application (ORCA). See Section K (52.204-8) for requirements.

Ref: http//orca.bpn.gov Veteran Information: Contractors must register with VETS-100 for contracts awarded in excess of $100,000. See Section K (52.222-38) for requirements.

Ref: http://www.vets100.cudenver.edu

THIS PAGE INTENTIONALLY BLANK

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1
SCOPE OF CONTRACT / DESCRIPTION OF WORK

This project is for the reconstruction and paving of the first 1.1 miles of Road 23 on the Olympic National Forest. The project includes but is not limited to staking, clearing, grubbing, earthwork, base course, paving with hot mix asphalt, chip sealing, installation of culverts, permanent and temporary traffic control, seeding, mulching, and haul of excess and unsuitable material.

C-2
PROJECT LOCATION

This project is located on the Hood Canal Ranger District of the Olympic National Forest, Section 6, Township 21 North, Range 5 West, W.M., and Sections 9, 16, & 28, Township 22 North, Range 5 West, W.M. near Shelton, Washington. It may be reached by traveling north 7 miles from Shelton on U.S. 101 to the Skokomish Valley Road. Turn left on the Skokomish Valley Road and travel 4 miles to Forest Service Road 23. Turn right on to Forest Service Road 23 and travel 100 feet to the beginning of the project.

C-3
PRICE RANGE

The Government’s estimate is in the range between $500,000 and $1,000,000 for the Base Items.

C-4
FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

a) Existing Conditions:

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

b) Weather Conditions:

Weather conditions suitable for ground excavation are normally expected in May through October. Rain, sometimes heavy, is normal throughout the winter, with periods of light to moderate snowfall. Night freezing is common throughout the winter and several periods of weeklong freezes are likely.

Operating Season: Inclusive dates during which operations are permissible.

Activity
Start Date
End Date
Restrictions
Construction Season
07/01
10/30
Hand Tools
07/01
10/30
Power Tools / 2 Chainsaws
07/01
10/30
Machinery / Car Traffic
07/01
10/30
Heavy Machinery
07/01
10/30

Time of Day Restriction

Operations restricted to between 2 hours after sunrise and 2 hours before sunset.

Notes – Noise Limitation:

· Power Tools/2 Chainsaws - any power tools with noise output is no more than two operating chainsaws.

· Machinery/Car Traffic - any machinery with noise output is limited to normal vehicular traffic at site (e.g. small excavator/backhoe).

· Helicopter/Heavy Machinery - any machinery with noise output is greater than normal vehicular traffic at site.

C-5
AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.211-3) (JUN 1988)

The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:

Specification
Address

Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects

FP-03

U.S. Customary Units Superintendent of Documents

U.S. Government Printing Office

Washington, D.C. 20402

866-512-1800 http://bookstore.gpo.gov/ http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm

ASTM Standards
American Society for Testing and Materials

P.O. Box C700

100 Bar Harbor Drive

West Conshohocken, PA 19428-2959

(610) 832-9585 http://www.astm.org

AASHTO Standards
American Association of State

Highway and Transportation Officials

444 North Capitol Street, NW

Suite 249

Washington, D.C., 20001

(206) 624- 5800 http://www.aashto.org

C-6
APPLICABLE SPECIFICATIONS AND MATERIAL CERTIFICATIONS

(a) Applicable Specifications:

References to Standard Specifications in the contract refer to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 U.S. Customary Units.

Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.

The Forest Service Supplemental Specifications to the FP-03 are also given on the Specification List but are physically attached in Section J. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.

(b) Product Substitution:

Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

(c) Shop Drawings Submittals:

The following shop drawings shall be submitted on this project (4 sets unless noted):

Title
Referenced by Specification No.
Time Allowed for Govt. Review After Submittal

N/A

(d) Material Certification, Testing Reports and Submittals:

Brief Title
Basic Reference Specification
Detailed Regulations Specification
Copies To Submit
Time for Government Approval After Total Submittal
Removal of existing bituminous road surface
203
203.05(d)
3
10
Roadway excavation, Compaction
204
204.11(c)

204.15

Table 204-1

3
10
Riprap Commercial Source
251
251.02
3
21
Aggregate base Commercial Source
301
301.01

301.02

3
10
Hot Asphalt Pavement
403
403.01 403.02

403.03

3
21
Asphalt Surface Treatment
409
409.01

409.02

3
21
Asphalt Prime Coat
411
411.01

411.02

3
21
Asphalt Tack Coat
412
412.01

412.02

3
21
Culvert and Drains
602
602.02
3
10
Seed
625
713.03

713.04

713.05

3
10
Straw (Weed Free)
625
713.13
3
10
Permanent Traffic Control
633
633.01

633.02

3
10
Permanent Pavement Marking
634
634.02
3
10
TITLE
Referenced Clause
Government Reviews
Safety Plan, including a Traffic Control Plan and a Blasting Plan where applicable
Accident Prevention (FAR 52.236-13). Requirements in Section H for Traffic Control, Blasting, Hazardous Materials
7 days
Engineered Spill Prevention Plan
Requirements in this section covering Spill hazards for specified volumes
7 days
Fire Plan and Fire Tool Certification
Fire Protection, Precaution, and Prevention requirements in this section or included as an attachment to the contract
N/A
Proposed Progress Schedule
Schedules For Construction Contracts (FAR 52.236-15)
N/A
Designation of Representative
Superintendence By The Contractor (FAR 52.236-6)
N/A
Drug Free Workplace Policy
Drug-Free Workplace (FAR 52.223-6)
N/A
SF1413 Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorships
Subcontracts (Labor Standards) (FAR 52.236-11)
N/A
Payroll Records WH347
Payrolls And Basic Records (FAR 52.222-8)
N/A
ARRA Reports
American Recovery And Reinvestment Act—Reporting Requirements (FAR 52.204-11) – see Section I
N/A

(e) General Guidelines for Submittals:

Submittals are required by their corresponding specifications (basic reference & detailed requirement). Work requiring submittals shall not begin until submittals have been approved.

Submittals shall include the following:

· Date and Revision Dates.

· Project Name and Contract Number.

· Names of Contractor, Subcontractor, Supplier, and Manufacturers.

· Field Dimensions and Relation to Adjacent Structures.

· Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.

Samples:

Physical samples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.

Manufacturer's requirements:

Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.

Approval or Rejection Time Allowance:

Submittals will be reviewed and either approved or rejected within specified calendar days of their receipt by the Contracting Officer or COR.

C-7
ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(AGAR 452.211-73)(FEB 1988)

The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.

C-8
BONDING

See Section I clause (incorporated by reference) FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (JUL 2004) for contract bonding requirements

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E-1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

E-2
AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)

(a) The Contracting Officer or the Contracting Officer’s duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed on the project unless otherwise agreed to.

E-3
CONFORMITY WITH PLANS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.

SECTION F--DELIVERIES OR PERFORMANCE

F-1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F-2
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) Alternate I(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 (ten) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 30, 2010. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by June 15, 2010. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

F-3
SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.

SECTION G--CONTRACT ADMINISTRATION DATA

G-1
POST AWARD CONFERENCE (AGAR 452.215-73) (Nov 1996)

A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at a mutually agreed location.

G-2
DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE AND INSPECTORS

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

The COR may designate project inspectors to secure compliance with the terms and conditions of the contract.

G-3
NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:

a. The name, address and telephone number of the subcontractor.

b. The date upon which the subcontract was entered into and its duration.

c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

d. Documentation of the subcontractor's representative authority. Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H-1
EROSION CONTROL MEASURES

a. Contractor shall minimize sediment laden water from entering the stream. Install check dams and sediment fences as necessary to minimize the entry of silt-laden water into streams or other water bodies.

b. Dewater any live streams prior to culvert removal or other in stream work.

c. Seed and mulch all disturbed areas within 7 days of completing the project.

H-2
LANDSCAPE PRESERVATION

a. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.

b. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

c. Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live steams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

d. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

e. Prevention of Oil Spills – If the Contractor maintains storage facilities for oil or oil products on project Area, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

f. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

H-3
CLEANING OF EQUIPMENT

Cleaning of Off-Road Equipment used by the Contractor for contract work shall be conducted outside the boundary of any National Forest Service land prior to moving each piece of equipment onto the project. The Contractor shall notify the Forest Service prior to moving each piece of equipment onto the project. Upon request from the Forest Service, arrangement will be made for Forest Service to inspect each piece of equipment prior to it being placed into service. The Contractor shall use cleaning methods necessary to ensure equipment is free of all attached mud, dirt, and plant parts. If noxious weeds are present at a project site, cleaning may also be required before moving between locations within the same project. These measures will assist to prevent the introduction/spread of the seeds of noxious weeds onto National Forest land. The Contractor shall certify in writing, compliance with the above requirements.

“Off-road Equipment” includes all machinery other than log truck, chip vans, pickup trucks or vehicles used to transport personnel on a daily basis.

H-4
PLAN FOR WEATHER-CAUSED SUSPENSIONS OF WORK

The Contractor shall prepare a plan for weather-caused suspensions of work to ensure preservation of resources affected on the work site or sites. The plans shall be consistent with the requirements in the LANDSCAPE PRESERVATION clause contained in this contract. The plan shall be submitted in writing to the Contracting Officer for review and, if acceptable, approval not later than two weeks prior to start of work. The plan shall distinguish between short-term shut-downs caused by intermittent weather activity and longer-term shut-downs associated with the advent of winter. If rejected by the Contracting Officer, the Contractor shall revise the plan and re-submit it for consideration within three working days of verbal or written notification by the Contracting Officer. The Contractor shall take action consistent with the plan before suspending activity on the site(s). Acceptance of the plan by the Contracting Officer in no way waives any of the requirements of the LANDSCAPE PRESERVATION clause.

H-5
INDUSTRIAL FIRE PRECAUTION LEVELS

The Contractor shall comply with the operations restrictions in accordance with the Washington State Industrial Fire Precaution Level (IFPL) system. The IFPL system is used to help prevent wildfires by regulating work in the woods during the summer fire season.

The US Forest Service and the Washington DNR use the four-level industrial regulation system.

The Precaution Levels are:

Level I
Closed Fire Season
Fire equipment and fire watch service is required.
Level II
Partial Hoot Owl
Limits certain activities to between the hours of 8 p.m. and 1 p.m.
Level III
Partial Shutdown
Prohibits some activities altogether and limits other activities to between the hours of 8 p.m. and 1 p.m.
Level IV
General Shutdown
All operations prohibited

Operation: Power Saws

Precaution Level
Landing
Tractor/Skidder
Other Woods Saws
I. Closed Season
Fire Watch
Fire Watch
Fire Watch
II. Partial Hoot Owl
Fire Watch
Hoot Owl
Hoot Owl
III. Partial Shutdown
Hoot Owl
Hoot Owl
Prohibited
IV. General Shutdown
Prohibited
Prohibited
Prohibited

Other Operations

Precaution Level
Loading
Blasting
Welding
I. Closed Season
Fire Watch
Fire Watch
Fire Watch
II. Partial Hoot Owl
Fire Watch
Hoot Owl
Hoot Owl
III. Partial Shutdown
Hoot Owl
Hoot Owl
Hoot Owl
IV. General Shutdown
Prohibited
Prohibited
Prohibited

This project is located in one of the following zones:

652NE

Northern portion of the Hood Canal RD

652SE

Southern portion of the Hood Canal RD

652NW

Northern portion of the Pacific RD

652SW

Southern portion of the Pacific RD

The Fire Precaution Class can be found at: http://www2.wadnr.gov/IFPL/ifpltoday.html or by calling 1-800-527-3305.

H-6
USE OF PREMISES

(a) Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman. Prior approved by Forest Service and Land owner required prior to any camping.

(b) A storage site will be permitted at a designated site within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract. Prior approval of land owner and Forest Service required.

(c) When the Contractor’s operations require a temporary electrical power distribution system, the system shall comply with the National Electrical Code, applicable local codes and utility regulations. The Contractor shall make all arrangements with the serving utility for temporary power and shall pay the serving utility for all applicable fees and power consumed.

(d) Potable water and sanitary facilities are not available for use during construction.

(e) The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads designated below for performance of work under this contract.

Road No.
Road Termini
Authorizations, Restrictions or Requirements
Maintenance Required
2300000
Beginning to M.P 4.3
None
None

Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained from the Hood Canal District Ranger.

H-7
STORAGE AND STOCKPILING OF MATERIALS

Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land (identified elsewhere herein, if any) approved by the Forest Service, may be used for storage purposes and for the placing of Contractor’s equipment. All storage sites provided by the Forest Service shall be restored at the Contractor’s expense. The Contractor is responsible for making any arrangements for storage off Forest Service administered lands.

H-8
LOCAL DISPOSAL SITES

Debris encountered in the construction (metals, cardboard, wood, plastic, etc.) and other waste materials generated in the construction shall be removed and disposed off of National Forest administered lands, unless other disposal means are authorized under the terms of the contract.

H-9
BLASTING

The Contractor shall comply with State and Federal laws in regards to transportation, storage and use of explosives. The Contractor shall post watchpersons at a safe distance on all approaches to a blasting area on all approaching roads, trails or waterways.

H-10
HAZARDOUS CONDITIONS SAFETY PLAN CERTIFICATION

The following conditions have been identified as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The Contractor shall certify that his/her Safety Plan conforms to the requirements of OSHA. The Safety Plan certification shall be submitted prior to commencing work on the project. Appropri ate actions shall be taken by the Contractor to implement this plan during performance and to take any and all necessary steps to mitigate the dangers from hazards.

Heavy equipment operation

Suspended loads

Mechanical hazards such as pulleys, cables, etc.

Chain saw operation (minor clearing and tree felling)

Traffic control on limited visibility roads

Narrow, locally unstable roadways

Temporary excavation/deep trenching/slope stability

Fall hazard from work heights exceeding six feet

Hazardous materials handling

Hydraulic and/or pneumatic and/or other high pressure hazards

H-11
SALVAGE RIGHTS

No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

H-12
VALUE ENGINEERING

Value engineering change proposals which change the service or function of a facility or produce irreconcilable conflicts with management objectives will not be considered.

The following work is excluded from consideration under the Value Engineering clause:

NONE

H-13
FINAL CLEANUP

Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to camp refuse such as tin cans, aluminum foil, glass, paper, garbage, used engine oil, oil filters, oil cans, grease cartridges, etc. The Contractor shall also remove and dispose of upon completion of construction, all stakes, old culverts, guardrail, flagging, and similar debris within the project area. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed off National Forest Land and in accordance with State and Local disposal requirements.

H-14
COSTING OF CLAIMS OR MODIFICATIONS

The cost principles and procedures in Subpart 31.2 of the Federal Acquisition Regulations shall be used in the pricing of contract claims and modifications, and for determining costs under terminated contracts, except, where actual costs cannot be determined from the Contractor's accounting records. Allowable ownership and operating costs for owned or rented equipment shall be determined from "The Construction Equipment Ownership and Operating Expense Schedule," U.S. Army Corps of Engineers Publication EP 1110-1-8, published by the U.S. Government Printing Office, to the extent that this publication contains a listing of the equipment being cost, or of similar equipment. Comparable equipment rate publications may be used as mutually agreed. During periods of suspension of work pursuant to a contract clause, the allowance for equipment ownership shall not exceed the amount for standby cost as determined by this schedule.

H-15
PAYMENT FOR INCIDENTAL ITEMS

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies and perform all work required to complete the project in accordance with all terms and conditions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other services and materials will be considered incidental to and included in the payment for items shown.

H-16
PAYMENT FOR MATERIALS DELIVERED OFF THE SITE

As provided in FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, material acquired for incorporation into the project, and stored off site by the Contractor, may, at the option of the Contracting Officer, be included in progress payments. Prior to payment, such material will be subject to Government inspection and must be stored separately from other materials, and be identified as, "PROPERTY OF THE UNITED STATES, Project Name and Contract Number." In addition, the Contractor shall furnish the Government with a right of ingress and egress to the property together with right of removal.

H-17
PAYMENT FOR PERFORMANCE AND PAYMENT SECURITY EXPENSES

It is mutually agreed that the premium costs for performance bonds, payment bonds and alternative payment protections furnished for this contract are included in the total amount bid for other items and that any payment to the Contractor for the cost of bonds made in accordance with FAR 52.232-5 refers only to corporate sureties listed in the current Department of Treasury Circular 570 and no advance payment will be made for bond premiums where other than corporate surety bonds are furnished. Bond premiums as used in this paragraph and FAR 52.232-5 shall include any Small Business Administration fees paid in connection with SBA guaranteed corporate surety bonds.

H-18
RELEASE OF PERFORMANCE AND PAYMENT BONDS

Performance and payment security furnished under this contract must be retained by the Government for a minimum of one year after acceptance of all work under the contract including any applicable warranty period. Performance and payment security other than corporate or individual surety bonds will be returned to the Contractor one year after completion of work if no claims against these bonds have been filed at that time.

H-19
ORDER OF PRECEDENCE--CONSTRUCTION

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions (Sections K, L & M) (3) Special Contract Requirements (Section H) (4) Contract Clauses (excluding the specifications and drawings)(i.e. Section I) (5) Supplemental Specifications (6) Standard Specifications

(7) Drawings, figured dimensions over scaled dimensions

(8) Drawings, large scale over small scale

(9) Drawings – Schedules on drawings over notations on drawings

(10) Shop Drawings

(11) Other Documents, Exhibits, and Attachments

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (JUL 2004)

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)

52.203-7 Anti-Kickback Procedures (JUL 1995)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007)

52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.215-2 Audit and Records -- Negotiation (MAR 2009) Alt I (MAR 2009) 52.219-8 Utilization of Small Business Concerns (MAY 2004) 52.222-3 Convict Labor (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (DEVIATION - JAN 2010)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-21 Prohibition of Segregated Facilities (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998)

52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-50 Combating Trafficking in Persons (SEP 2007)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-14 Toxic Chemical Release Reporting (AUG 2003)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997)

52.228-11 Pledges of Assets (FEB 1992)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.228-15 Performance and Payment Bonds – Construction (NOV 2006)

52.229-3 Federal, State, and Local Taxes (APR 2003)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-17 Interest (OCT 2008)

52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

52.233-1 Disputes (JULY 2002)

52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by The Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984)

52.236-26 Preconstruction Conference (FEB 1995)

52.242-13 Bankruptcy (JUL 1995)

52.243-4 Changes (AUG 1987)

52.244-6 Subcontracts for Commercial Items (MAR 2009)

52.245-1 Property Records (JUN 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.248-3 Value Engineering – Construction (SEP 2006)

52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction) (APR 1984)

52.252-6 Authorized Deviations in Clauses (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

I-2
52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAR 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111–5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

I-3
52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .