New Road Listing 2010 BRUSH 3-25-10 .pdf
PDF 26 KB Posted
- Solicitation number
- AG-0489-S-10-0363
About this file
New Road Listing 2010 Brush - 3/25/2010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Page 1 of 3 map 3-25-10.jpg | JPG image | |
| Page 3 map 3-25-2010.jpg | JPG image | |
| AMENDMENT 1_MtAdamsBrushing SF30.pdf | ||
| Page 2 map 3-25-2010.jpg | JPG image | |
| MtAdams Brush Cutting Solicitation and Attachments 1 and 2.pdf | ||
| MtAdams Brush Cutting Attachment 3 Bid Package - Fill-In.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE A - RECOVERY FUNDING
ROAD BMP EMP MILES ML
DITCH
SIDE
FILL
SIDE
VERTICAL
CLEARANCE
MAX.
HGT.FROM
GROUND
DIAMETER OF
TREE SIZE TO
REMAIN
86 4 16 12 2 5' 0 10' 6" 4"
6035 0 5 5 2 5' 0 10' 6" 4"
2360 0 3 3 2 5' 0 10' 6" 4"
67 0 0.9 0.9 2 5' 0 10' 6" 4"
6701 0 0.8 0.8 2 5' 0 10' 6" 4"
6610 0 5.9 5.9 2 5' 0 10' 6" 4"
6808 3.8 10.7 3.9 2 5' 0 10' 6" 4"
8620061 0 1.3 1.3 2 5' 0 10' 6" 4"
8620 3.4 4.2 0.8 2 5' 0 10' 6" 4" 58 0 4 4 2 5' 0 10' 6" 4"
2400031 0 0.5 0.5 2 5' 0 10' 6" 4" 2400041 0 1.4 1.4 2 5' 0 10' 6" 4"
TOTAL 39.5
90 0 15.5 15.5 4 12' 12' 14' 6" 4" 23 43.5 55 11.5 3 12' 12' 14' 6" 4"
23 32.9 35.9 3 3 12' 12' 14' 6" 4"
6507 0 4 4 2 5' 0 10' 6" 4"
6615 0 3.2 3.2 2 5' 0 10' 6" 4"
6621 0 1.5 1.5 2 5' 0 10' 6" 4"
31 0 5.1 5.1 2 5 0 10' 6" 4"
32 * 12 21.8 9.8 2 5' 0 10' 6" 4" **
3211 * 0 6.4 6.4 2 5' 0 10' 6" 4" **
TOTAL 60
WORK IS TO BE PERFORMED WITH A TRACTOR MOUNTED
ROTARY BRUSH CUTTER. MINOR AMOUNTS OF HAND
CUTTING MAY BE REQUIRED NEAR GUARDRAILS OR OTHER
AREAS UNABLE TO BE REACHED BY CUTTER HEAD.
ON MAINTENANCE LEVEL 2 ROADS THE FOLLOWING APPLIES.
DITCH SIDE CLEARING WILL BE 5 FEET FROM THE EDGE OF
THE SHOULDER OR 2 FEET BEYOND THE BOTTOM OF THE
DITCHLINE, WHICHEVER IS GREATER.
* INDICATES THE ROADS WHICH THE CONTRACTOR MAY USE
AN EXCAVATOR ON RATHER THAN A BRUSH CUTTER TO MEET
THE REQURIED SPECIFICATIONS.
** TREES 4 INCHES TO 8 INCHES MAY BE REMOVED TO FACILITATE
OPERATIONS. IF EXCAVATOR OPERATIONS DISTURB DRAINAGE
FLOW, DITCH FLOW MUST BE RE-ESTABLISHED.
SHEET 7 OF 8
ROAD LISTING dated 3/25/2010