12.AdditionalFireCommunications.doc

DOC document 22 KB Posted

Attached to
RECOVERY-Elkhorn Drive Anthony Lake Road 73 Reconstruction Project, Wallowa-Whitman National Forest
Solicitation number
AG-0489-S-10-0345
Issued by

About this file

Additional Fire Communications

View the file

Other files

File Type Posted
Amendment2.rtf RTF text file
Amendment 1.doc DOC document
Excavation_Baker_Valley_View.pdf PDF
X_sections_Baker_Valley_View.pdf PDF
6.A_ARRA_Sign_Details_73_2apr09.pdf PDF
7.B_Utilities_Map_Location_73.pdf PDF
2.OfferorsPacket.doc DOC document
8.C_Water_Map_Location_73.pdf PDF
11.AdditionalFireTankTruckR6_6300_53.doc DOC document
10.FireProtectionandSuppressionr6_fS_6300_52.doc DOC document
4.73_Specs_FP-03.doc DOC document
9.DavisBaconWage.txt TXT text file
1.SOLICITATIONAG-0489-S-10-0345.doc DOC document
3.73_Spec_List.doc DOC document
5.Elkhorn_Dr_Revised_4_8_10.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service - Pacific Northwest Region

Fire Protection and Suppression

Additional Fire Precautionary Measure 2 - Communications

The Contractor shall provide adequate two-way communication facilities to report a fire to the Forest Service within 15 minutes of detection. FCC regulations prohibit commercial use of Citizen Band (CB) radios. CB's are not considered adequate two-way communications.

Such communications shall be operable during periods of operation of power driven equipment, including the time fire security is required.

R6-FS-6300-54

File details come from the government source that posted it. Updated .