SPECS.pdf
PDF 199 KB Posted
- Solicitation number
- AG-0489-S-10-0298
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Road Rules 6_09.pdf | ||
| ATTACHMENTS.doc | DOC document | |
| BIDPKT.doc | DOC document | |
| AG-0489-S-10-0298.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
Table of Contents Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
153 - Contractor Quality Control
153.02 Contractor Quality Control Plan
153.04 Records
154 - Contractor Sampling and Testing 155 - Schedules for Construction Contracts
155 Delete 156 - Public Traffic
156.03 Accommodating Traffic During Work
156.04 Maintaining Roadways During Work
156.08 Traffic and Safety Supervisor
170 - Develop Water Supply and Watering 171 - Weed and Disease Prevention 409 - Asphalt Surface Treatment
409.02 Material
409.06 Weather
409.06 Date & Time
409.08 Asphalt Application
409.10 Fog Seal
409.11 Single Course Surface Treatments
Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment .. 16 Table 409-2 Approximate Quantities of Material – Double Course Surface Treatments Table 409-3 Approximate Quantities of Material – Triple Course Surface Treatments
409.13 Acceptance
Table 409-4 Sampling and Testing Requirements
635 - Temporary Traffic Control
635.03 General
703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate
703.10(e) Flakiness Index 703.10(i) Adherent Coating Table 703-2 Correction Table 703-2 Correction Table 703-7 Target Value Ranges
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
7/77
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
153 - Contractor Quality Control
153.02_nat_us_02_17_2005
153.02 Contractor Quality Control Plan.
Add the following:
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.04_nat_us_10_24_2007
153.04 Records.
Delete all but the first sentence
154 - Contractor Sampling and Testing
154.01_nat_us_05_24_2005
154.01 Description
Delete the last sentence of the first paragraph.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 - Public Traffic
156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633 Retro-reflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed ___ minutes at any one time followed by an open period of no less than ___ minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1.
The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1 Temporary Road Closures
Road
Number From
Terminus To
Terminus Maximum
Consecutive Days of Closure
Minimum Consecutive Days Open
None (N/A)
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
156.03_nat_us_02_24_2005
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
according to Subsection 106.07(b)
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
170 - Develop Water Supply and Watering
170.00_0604_us_03_26_2009
1. DESCRIPTION
170.01 This work consists of providing facilities to furnish an adequate water supply, hauling, and applying water for surface blading and shaping, dust abatement, and surfacing of roads as necessary to provide safe travel for low and/or high clearance vehicles; to protect adjacent resource values and road investments; and to prevent damage to roads during use by Contractor.
2. MATERIALS
170.02 Suitable and adequate water sources and use restrictions are shown on the Vicinity Map with a W. If the Contractor elects to provide water from other than the designated source, Contractor shall be responsible to obtain the right to use the water and pay any royalty involved. Forest Service shall be furnished a copy of any agreement obtained by the Contractor.
3. EQUIPMENT
170.03
a. Mobile watering equipment shall have water tight tanks of known capacity when used for mixing dust abatement materials. The tank capacity shall be measured prior to use.
b. An air gap, or positive anti-siphon device, shall be provided between the water source and the vehicle being loaded if: (1) the vehicle has been used for other than water haul, (2) the source is a domestic potable water supply, (3) or the water is used for tank mixing with any other materials.
c. Designated water sources may require some work prior to their use. Such work may include cleaning ponding areas, installing temporary weirs or sandbags, pipe repair, pump installation or other items appropriate to Contractor's operation.
Flowing streams may be sandbagged on a temporary basis or a weir placed to pond the water. Water draw shall not be more than 1/3 of the stream flow. Pumping shall not result in no or negligible stream flow below site. Work within flowing streams will require review and approval by a Forest Service Fish or Hydrology Specialist.
d. Foot valves on pumps will be screened with screens that meet National Marine Fishery Services standards. NMFS developed criteria for pump intake screens will be used on all water pump intakes as described in the “Addendum, Juvenile Fish Screen Criteria For Pump Intakes” (NMFS, May 9, 1996).
Intake hose screen mesh openings shall not exceed 3/32 inch (2.29mm) woven wire or perforated plate screens, or 0.0689 inch (1.75mm) for profile wire screens, with a minimum 27% open area. If fry size salmonids are never present at the site, screen size opening shall not exceed ¼ inch (6.35mm) for woven wire, perforated plate screens, or profile wire screens, with a minimum of 40% open area.
Trucks will be maintained to prevent oil leaks. Loading is done in a manner to prevent overflowing and discharge of wash into stream.
Standard operating practice shall be to protect the stream bank, riparian area, and provide maintenance for the access road.
171 - Weed and Disease Prevention
171.00_nat_us_03_30_2005
Description
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.
Material
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner.
Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.
409 - Asphalt Surface Treatment
409.02_nat_us_05_12_2004
409.02 Material.
When designated, conform to applicable State department of transportation asphalt cement or emulsified asphalt requirements.
409.06_nat_us_05_12_2004
409.06 Weather.
Delete the first paragraph and replace with the following:
Apply surface treatments with aggregate only when ambient air and surface temperatures are above 60 °F and rising in the shade, when the weather is not foggy or rainy, and when rain is not forecast for at least 24 hours after application.
409.06 Date & Time.
Add the following.
Construct fog seal and single-course surface treatments between _____ (dates) and ______ and multiple-course surface treatments between ______ and ______.
409.08_nat_us_06_21_2005
409.08 Asphalt Application.
Add the following to the 3rd paragraph:
Ensure the length of spread is no more than what can be covered with aggregate within 1 minute of the asphalt application.
409.10 Fog Seal.
Add the following to the first paragraph:
Dilute by adding an equal amount of water to the emulsified asphalt. Do not cut the emulsified asphalt more than once.
409.11 Single Course Surface Treatments.
Do not permit traffic to travel over any Asphalt Surface Treatment until completion of rolling.
409.10_nat_us_08_12_2004
Delete Table 409-1 and substitute the following:
Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment
Table 409-1 Approximate Quantities of Material for
Single-Course Surface Treatment
D es ig n at io n Nominal Maximum
Size of Aggregate
Aggregate Gradation (1)
Estimated Quantity of Aggregate (2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of
Asphalt Binder (3) gallons/yd2
1A 3/4 inch B 40 – 49 0.40 – 0.55 0.27 – 0.38
1B 1/2 inch C 26 – 29 0.31 – 0.44 0.20 – 0.31
1C 3/8 inch D 20 – 26 0.20 – 0.35 0.13 – 0.24
1D No. 4 E 15 – 20 0.15 – 0.22 0.11 – 0.18
1E Sand F 9 – 15 0.11 – 0.18 0.09 – 0.15
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.
(3) Adjust the asphalt content for the condition of the road.
409.11_nat_us_12_18_2004
Table 409-2 Approximate Quantities of Material – Double Course Surface Treatments
Delete Tables 409-2 and substitute the following:
Table 409-2
Approximate Quantities of Material for Double Course Surface Treatments
Designation (Thickness)
Nominal Maximum
Size of Aggregate
Aggregate Gradation(1)
Estimated Quantity of Aggregate(2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of Asphalt Binder (3) gallons/yd2
2A (1/2 inch)
1st Application 3/8 inch D 26 – 35 0.20 – 0.31 0.11 – 0.22
2nd Application No. 4 E 9 – 15 0.31 – 0.40 0.18 – 0.29
2B (5/8 inch)
1st Application 1/2 inch C 29 – 40 0.31 – 0.40 0.18 – 0.29
2nd Application No. 4 E 14 – 20 0.40 – 0.51 0.24 – 0.33
2C (3/4 inch)
1st Application 3/4 inch B 40 – 49 0.35 – 0.51 0.22 – 0.33
2nd Application 3/8 inch D 20 – 26 0.51 – 0.60 0.33 – 0.42
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific
(3) Adjust the asphalt content of the first application for the condition of the road.
409.12_nat_us_08_12_2004
Delete Tables 409-2 and substitute the following:
Table 409-3 Approximate Quantities of Material – Triple Course Surface Treatments
Table 409-3 Approximate Quantities of Material for
Triple Course Surface Treatments
Designation (Thickness)
Nominal Maximum
Size of Aggregate
Aggregate Gradation(1)
Estimated Quantity of Aggregate(2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of
Asphalt Binder(3) gallons/yd2
3A (1/2 inch)
1st Application 3/8 inch D 26 – 35 0.20 – 0.31 0.11 – 0.22
2nd Application No. 4 E 9 – 15 0.24 – 0.35 0.15 – 0.27
3rd Application Sand F 9 – 15 0.20 – 0.31 0.11 – 0.22
3B (5/8 inch)
1st Application 1/2 inch C 29 – 40 0.20 – 0.31 0.11 – 0.22
2nd Application 3/8 inch D 15 – 20 0.31 – 0.40 0.18 – 0.29
3rd Application No. 4 E 9 – 15 0.20 – 0.31 0.11 – 0.22
3C (3/4 inch)
1st Application 3/4 inch B 35 – 46 0.24 – 0.35 0.15 – 0.27
2nd Application 3/8 inch D 20 – 26 0.31 – 0.40 0.18 – 0.29
3rd Application No. 4 E 9 – 15 0.24 – 0.35 0.15 – 0.27
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65 as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific
(3) Adjust the asphalt content of the first application for the condition of the road.
409.13_nat_us_05_13_2004
409.13 Acceptance.
Delete the 2nd paragraph and replace with the following:
Aggregate gradation for asphalt surface treatment will be evaluated under Subsection 106.04.
Table 409-4 Sampling and Testing Requirements.
Delete the last cell (4th) under Sampling Frequency and replace with the following:
1 per tanker truck and 1 per trailer
Delete the 2nd and 3rd cell under Type of Acceptance and replace with the following:
Measured and tested for conformance (106.04)
635 - Temporary Traffic Control
635.03_nat_us_05_13_2004
635.03 General.
Add the following:
Install temporary traffic control signs to temporary posts or approved temporary sign mounts.
703 - Aggregate
703.05_nat_us_12_07_2006
Delete 703.05 and replace with the following:
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-2
(2) Liquid limit, AASHTO T 89 25 max.
(3) Plastic limit, AASHTO T 90 Nonplastic
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-3
(2) Liquid limit, AASHTO T 89 35 max.
(3) Plastic Index, AASHTO T 90
a) If the percent passing the No. 200 sieve is less than 12% 2 to 9
b) If the percent passing the No. 200 sieve is greater than 12% Less than 2
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 75% min.
(9) Free from organic matter and lumps or balls of clay
Do not furnish material that contains asbestos fibers.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
(1) Gradtion Table 703-16
(2) Plastic Index, AASHTO T 90 Less than 9
(3) Los Angeles abrasion, AASHTO T 96 55% max.
(4) Free from organic matter and lumps or balls of clay.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Delete Table 703-2 and replace with the following:
E
B as e)
(6
(6
(4
4.
7.
(3
D
B
6)
(6
(6
(4
4.
7.
(3
C
B
6)
(6
(6
4.
–7 .0
3)
B
S ub ba se
(8
.0
4)
P er ce n t b y M as s
P as si n g D es ig n at ed S ie ve
A
A S
H T
O T an d
T
1)
G ra d in g D es ig na ti on
A
S u bb
(7
(6
8.
(3
T ab le
-2
T ar ge t V al u e R an ge s fo r S ub b as e an d
B as e G ra d at io n
S ie ve S iz e
2½ in ch
1½
3/
1/
N o.
N o.
T he v al ue in th e pa re nt he se s is th e al lo w ab le d ev ia ti on f ro m th e ta rg et v al ue s.
Delete Table 703-3 and replace with the following:
U
(6
(7
(5
8.
.0
(7
(5
8.
.0
(6
(7
(5
8.
.0
H
(6
(6
(5
9.
.0
(6
(6
(5
.0
6.
(4
P er ce n t b y M as s
P as si n g D es ig n at ed S ie ve
A
A S
H T
O T an d
T
1) ra d in g D es ig na ti on
F
0(
-1
-8
-6
(6
-5
-3
(6
-2
(5
.0
-1 6.
(4
T ab le
-3 ar ge t V al u e R an ge s fo r S u rf ac e
G ra d at io n ie ve S iz e
1/
1/
N o.
N o.
T he v al ue in th e pa re nt he se s is th e al lo w ab le d ev ia ti on f ro m th e ta rg et v al ue s.
I f th e pl as ti ci ty in de x (P
I) is g re at er th an
, t he T
V r an ge f or th e
N o.
s ie ve s iz e is
-1
(4
Add Table 703-16:
Table 703-16
Gradation Requirements for Screened Aggregate
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation Sieve Size
L M N O P Q R
6 inch 100 100
4 inch 100 100
3 inch 100 100
2 inch 100
No. 4 15-45 15-45 15-45
703.06_nat_us_03_02_2005
703.10(e) Flakiness Index.
Delete and replace with the following:
Flakiness Index, FLH T 508 30% max.
703.10(i) Adherent Coating.
Adherent coating on the aggregate, FLH T 512 0.5% max.
703.07_nat_us_03_02_2005
Table 703-2 Correction
Include the following substitution
In Table 703-2, delete the “436 – 74 (6)” percent by mass passing for grading E (base) No. 4 sieve size and substitute “36 – 74 (6).”
Table 703-2 Correction
Include the following substitution
In Table 703-2, delete the “436 – 74 (6)” percent by mass passing for grading E (base) No. 4 sieve size and substitute “36 – 74 (6).”
703.10_nat_us_03_02_2005
Delete Table 703-7 and substitute the following:
Table 703-7 Target Value Ranges
Table 703-7
Target Value Ranges for Single and Multiple Course Surface Treatment Aggregate Gradation
Sieve
Percent by Mass Passing Designated Sieve
(AASHTO T 27 & T 11)
Grading Designation Size A B C D E F
1½ inch 100(1)
1 inch 90-100(3) 100(1)
¾ inch 0-35(5) 90-100(3) 100(1)
½ inch 0-8(3) 0-35(5) 90-100(3) 100(1)
⅜ inch — 0-12(3) 0-35(5) 85-100(3) 100(1) 100(1)
No. 4 — — 0-12(3) 0-35(5) 85-100(3) 85-100(1)
No. 8 — — — 0-8(3) 0-23(4) —
No. 200 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-10(1)
(1) Statistical procedures do not apply.
( ) The value in the parentheses is the allowable deviation () from the target values.
718 - Traffic Signing and Marking Material
718.05_nat_us_08_05_2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.