About this file

Plan sheet 3

View the file

Other files

File Type Posted
SF 30 -0277 amendment 3.pdf PDF
SF 30 0277amend2.pdf PDF
Mailing list 0277.xls XLS spreadsheet
SF 30 0277.pdf PDF
FS ARRA SIGN DETAILS 2apr09.pdf PDF
23 rd plan sheet 2.pdf PDF
23 rd plan sheet 1.pdf PDF
AG-0489-S-10-0277.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK LIST

Mile Post Work Item

32.05 Begin item 30322 - roadbed reconditioning (see note 4). Blade and shape road bed and ditch - ditch depth to be minimum 12" with slope of 2:1 or flatter. Clean culvert catch basins and inlets. Fall approximately 5 hazard trees adjacent to 23 road and haul routes (see note 2) - trees to be marked in advance of felling by FS.

33.5

(approx.) Begin item 32203 - Aggregate Base. Obtain approval prior to placement of aggregate. Begin placement of aggregate - depth 4" unless otherwise noted or directed by C.O. Measurement of aggregate quantity will be by square yard. Forest Service to mark aggregate width at minimum of 100 ft intervals.

Contractor will be responsible for maintaining control established by Forest

Service. The width marked by Forest Service will be used for final quantity calculations. The beginning mile post (33.5) may shift ahead or back depending on field calculated quantities. Boulders and rocks dislodged through work process are to be placed below shoulder on fill side of road.

33.68 Begin asphalt apron at bridge - no work between here and mp 33.8 except for removal of loose material from road surface.

33.8 End asphalt at bridge - continue item 32203.

35.65 End work items at asphalt apron.

NOTES

1 Water source is Big Spring Cr. - See Specification 107.02 for WA. State /

FS MOU regarding hydraulic projects for requirements of water withdrawal.

2 Hazard tree removal will consist of falling designated trees. Use controlled felling to ensure the direction of fall and prevent damage to roadway, residual trees and traffic. Felled trees are to be left in a stable condition.

Remove any resulting debris from roadway and drainage structures. Hazard tree removal is incidental to other work items.

3 Source for aggregate is stockpile located in Baby Show Quarry - see vicinity map for location.

4 Standard and timing of haul route maintenance to be agreed to between

Forest Service and Contractor. Item 30322 Road reconditioning, compaction method B (junction of 23 and 2300335 to the asphalt apron at junction of 23 and 90 roads) will be measured as follows - For areas receiving aggregate it will be considered complete when subgrade approval is granted for placement of aggregate. For areas not receiving aggregate it will be it will be considered complete when Forest Service approves final blading, watering and compaction of haul route upon completion of haul.

5 See Section C for "ARRA" signage requirements.

23 Road Resurface Sheet 3 of 3 of plans