Upper Grande Ronde Phase I and II Fly Creek and Scout Creek Restoration PAGE 2
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B-1 SCHEDULE OF ITEMS
Unit
| Estimated Quantity |
| Unit Price |
| Total |
| 1 |
| UPPER GRANDE RONDE PHASE I & II, FLY CREEK, AND SCOUT CREEK RESTORATION PROJECT: Excavator - Equipment rental(s) with Operator on the Wallowa-Whitman National Forest |
| 1.1 |
| Equipment rental with Operator: 2 tracked excavators - Service work activities (minimum of 115 hp (fly wheel power) and 35,000 lbs. operating weight with thumb) starting 9/15/10 – 9/30/10. This portion of the project is located on Fly Creek. |
| Hour |
| 200 |
| 1.2 |
| Equipment rental with Operator: 1 tracked excavator - Service work activities (minimum of 115 hp (fly wheel power) and 35,000 lbs. operating weight with thumb) starting 6/14/10 – 7/23/10. The excavator also needs to come with a ripper with a quick attach that is capable of ripping roads 3’ deep. This portion of the project is located on the Upper Grande Ronde River. |
| Hour |
| 230 |
| 1.3 |
| Equipment rental with Operator: 1 tracked log loader or excavator with rotating clam or thumb - Service work activities (minimum of 115 hp (fly wheel power) and 35,000 lbs. operating weight starting on 6/28/10 – 7/23/10. This portion of the project is located on the Upper Grande Ronde River. |
| Hour |
| 200 |
| 1.4 |
| Equipment rental with Operator: 1 skidder with log grapple – Service work activities (minimum of 180 hp (fly wheel power and 39,000 lbs. operating weight starting 6/21/10 – 7/2/10. This portion of the project is located on the Upper Grande Ronde River. |
| Hour |
| 50 |
| 1.5 |
| Equipment rental with operator: 1 tracked small excavator with a 6” diameter rock auger capable of drilling 5 ’deep and a grapple or bucket with thumb attachment – Service work activities (minimum of 50 hp (fly wheel power) and 12,000 lbs. operating weight starting 4/26/10 – 5/15/10. This portion of the project is located on the Upper Grande Ronde River. |
| Hour |
| 80 |
| 1.6 |
| Equipment rental with Operator: 1 tracked log loader or excavator with rotating clam or thumb- Service work activities (minimum of 80 hp (fly wheel power) and 25,000 lbs. operating weight starting on 8/9/10 – 8/13/10 and 9/1/10 – 9/15/10. This portion of the project is located @ Scout Creek, Upper Grande Ronde River (Camp Carson) and Bear Creek. |
| Hour |
| 150 |
TOTAL
Duns#