ADDITIONAL SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WAGNER.doc | DOC document | |
| Wagner Gap Meadow Restoration Dwgs.pdf | ||
| WAGNER.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wagner Gap Meadow Restoration – Supplemental Specifications Page 1 of 20
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress
108 Delete
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions
Wagner Gap Meadow Restoration – Supplemental Specifications Page 2 of 20
155 - Schedules for Construction Contracts
155 Delete
650 - Road Closure Devices
650.02 Requirements
650.03 Performance
650.04 Acceptance
650.05
650.06
652 – Meadow Restoration
652.01
652.02
652.03 General
652.04 Burn Piles
652.05 Acceptance
652.06
652.07
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Wagner Gap Meadow Restoration – Supplemental Specifications Page 3 of 20
Preface
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 4 of 20
101 - Terms, Format, and Definitions
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 5 of 20
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Wagner Gap Meadow Restoration – Supplemental Specifications Page 6 of 20
Figure 101-1—Illustration of road structure terms.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 7 of 20
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 8 of 20
103 - Scope of Work
Deletions
Delete all but subsection 103.01 Intent of Contract.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 9 of 20
104 - Control of Work
Deletions
Delete Sections 104.01, 104.02, and 104.04.
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 10 of 20
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 11 of 20
106 - Acceptance of Work
106.07 Delete
Delete subsection 106.07.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 12 of 20
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10 Environmental Protection.
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 13 of 20
108 - Prosecution and Progress
108 Delete.
Delete Section 108 in its entirety.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 14 of 20
109 - Measurement and Payment
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 15 of 20
155 - Schedules for Construction Contracts
155 Delete.
Delete Section 155 in its entirety.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 16 of 20
650 - Road Closure Devices
Description
650.01 Work. Furnish and install, or install only, road closure devices using fabricated gates and accessories, combination post and rail barriers, concrete barriers, earth mound barriers, and other devices.
Materials
650.02 Requirements. Furnish materials to be used in fabricating gates and barriers. Ensure that all hardware is galvanized in accordance with AASHTO M 232 and meets the requirements of ASTM A 307. Furnish plain or cut washers that are American Standard Washers.
Furnish timber posts, rails, and lumber that meet the requirements of AASHTO M 168. Provide timber of the species and type, and rate of preservative treatment.
Furnish concrete that meets the requirements of Subsection 601.03, method B or C.
Construct earth mound barriers from excavated material adjacent to the barrier location, or from other designated locations.
Construction
650.03 Performance. Place road closure devices at designated locations. Construct all devices to the required dimensions. In assembling gates, perform required welding in accordance with the best modern practice and the applicable requirements of AWS D1.1.
After assembly, clean non-galvanized steel pipe gates and paint them with one coat of zinc-rich primer and two coats of exterior enamel of the required type and color.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 17 of 20
Set all posts vertically and embed them to the required depth. Place concrete for embedment against undisturbed earth within an excavation sized to achieve the embedment dimensions.
Compact the backfill in 6 inch layers to finished grade.
Furnish and install all signs and/or reflective warning markers accessory to the road closure device.
650.04 Acceptance. Construction of road closure devices will be evaluated under Subsections
106.02 and 106.04.
Measurement
650.05 Measure the items listed in the bid schedule according to Subsection 109.02.
Payment
650.06 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 650 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 18 of 20
652 – Meadow Restoration
Description
652.01 This work consists of cutting small trees and brush by use of hand tools such as chainsaws to restore habitat meadows. Use of equipment is strictly prohibited. Cut material shall be hand piled and covered for future burning.
Materials
652.02 Furnish 4-mil, black, polyethylene plastic (no substitutes) to cover burn piles.
Construction
652.03 General. In area marked and flagged by Contracting Officer all trees 6” DBH or smaller shall be cut and hand piled. All previous cut branches and down debris less than 6” diameter within the flagged boundary shall also be gathered and incorporated into the hand piles.
652.04 Burn Piles. Burn piles shall be constructed compactly by aligning individual pieces in the same direction and placing the heavier slash on top. Piles shall have a stable base to prevent toppling. The long axis of the individual pieces shall be oriented up and down slope. Protruding pieces shall be trimmed to allow covering in a manner that permits the piles to shed water. Each pile shall have a minimum of 10-15% by volume of small sized slash (small branches less than ½ inch in diameter and, or small branches with needles or leaves attached) placed in the lower, center of the pile to provide ‘kindling’ for prompt ignition and to aid in the combustion of larger slash. Material projecting more than 2 feet from the general pile perimeter shall be cut off and re-piled. Piles shall be no smaller than 6 feet in diameter and 5 feet tall or greater than 7 feet in diameter and 6 feet tall.
Polyethylene plastic shall be placed on all piles so that a minimum of 70% of the horizontal and vertical surface area is covered. Minimum size of the polyethylene plastic sheet shall be six foot square. Plastic shall be secured on the pile by placing 20% of the total material piled on top of the plastic as to provide protection from rain, snow and sunlight.
Unless specifically approved by the Contracting Officer, piles shall be located so that later burning will not damage standing green trees. Piles shall be at least 15 feet apart. Piles shall not be placed on or adjacent to tree stumps, snags, or within eight feet of down logs. Piles shall not be placed under overhanging limbs. Piles shall not be located on road surfaces, in ditches and channel bottoms. Slash maybe required to be carried more than 30 feet to ensure protection of standing green trees. This may result in locating piles beyond the area in which slash was previously located.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 19 of 20
652.05 Acceptance. Construction of burn piles will be evaluated under Subsections 106.02.
Measurement
652.06 Measure the items listed in the bid schedule according to Subsection 109.02.
Payment
652.07 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 652 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Wagner Gap Meadow Restoration – Supplemental Specifications Page 20 of 20
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.