Text version

General Decision Number: OR080041 01/08/2010 OR41

State: Oregon

Construction Type: Building

County: Lane County in Oregon.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 12/18/2009 1 01/01/2010 2 01/08/2010

BROR0001-018 06/01/2009

Rates Fringes

BRICKLAYER.......................$ 31.07 13.70

TILE FINISHER....................$ 21.11 9.50

TILE SETTER......................$ 27.80 12.90

CARP0001-024 06/01/2007

Rates Fringes

Carpenters:

Excluding Form Work.........$ 27.56 13.30

* ELEC0280-013 01/01/2010

LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST

CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)

Rates Fringes

ELECTRICIAN (Electrical Low Voltage Wiring Installer and HVAC Temperature Control Installation only.)..............$ 26.04 3%+$10.65

* ELEC0280-014 01/01/2010

LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST

CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)

ELECTRICIAN......................$ 34.05 3%+14.43

ELEC0932-010 01/01/2009

LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE

N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)

ELECTRICIAN......................$ 31.97 3%+12.40

ELEC0932-011 01/01/2009

AG-0489-S-10-0253

ODNRA Restroom Doors

LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE

N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)

ELECTRICIAN (ELECTRICAL LOW

VOLTAGE WIRING INSTALLER AND

HVAC CONTROL INSTALLATION

ONLY)............................$ 23.08 11.40

ENGI0701-020 01/01/2010

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.27 11.50

GROUP 1A....................$ 39.13 11.50

GROUP 1B....................$ 41.00 11.50

GROUP 2.....................$ 35.64 11.50

GROUP 3.....................$ 34.65 11.50

GROUP 4.....................$ 33.71 11.50

GROUP 5.....................$ 32.60 11.50

GROUP 6.....................$ 29.61 11.50

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units.

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade operator; Tractor operator with boom attachment; DRILLING:

Churm Drill and Earth Boring Machine Operator; Directional

AG-0489-S-10-0253

Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES: Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Asphalt Paver;

Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Trenching Machine, digging capacity over 3 ft Depth.

GROUP 5: TRACKHOE-HYDRAULIC: up to and including 20,000 lbs.;

Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; HYDRAULIC HOES: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type);

Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor

GROUP 6: LOADERS: (less than 1 cu yd.); Roller (Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;

Crane oiler; Drill Assistant

IRON0029-011 07/01/2009

Rates Fringes

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.12 17.40

LABO0001-030 06/01/2008

Rates Fringes

Laborers: (Mason Tender-Cement/Concrete)..........$ 25.75 11.25

LABO0001-031 06/01/2008

Rates Fringes

Laborers: (Mason Tender-Brick)...$ 25.75 11.25

LABO0001-032 06/01/2008

Rates Fringes

Laborers: (Mason Tender-Stone)...$ 25.75 11.25

LABO0003-008 06/01/2008

Rates Fringes

Laborers:

GROUP 1.....................$ 24.66 11.25

GROUP 2.....................$ 25.29 11.25

GROUP 3.....................$ 25.75 11.25

GROUP 4.....................$ 26.15 11.25

LABORER CLASSIFICATIONS

GROUP 1: Form-Stripping

GROUP 2: Power Tool Operator

GROUP 3: Vibrating Plate

GROUP 4: Grade Checker, Pipelayer

AG-0489-S-10-0253

PAIN0055-023 07/01/2009

Rates Fringes

Painters:

Brush, Roller and Spray.....$ 18.59 7.24

PAIN0055-024 07/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 26.31 10.63

PAIN0740-002 07/01/2009

Rates Fringes

GLAZIER..........................$ 33.60 12.89

PLAS0082-003 06/01/2008

Rates Fringes

PLASTERER........................$ 28.46 11.61

PLAS0555-006 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.87 15.59

PLUM0290-008 04/01/2009

Rates Fringes

Plumbers and Pipefitters.........$ 35.69 18.59

ROOF0156-003 06/01/2009

Rates Fringes

Roofers:

Excluding Metal Roof........$ 21.29 9.90

SUOR2009-025 11/09/2009

Rates Fringes

CARPENTER (Form Work Only).......$ 21.07 7.43

LABORER: Common or General......$ 19.03 6.96

LABORER: Landscape..............$ 14.02 2.63

OPERATOR: Excavator.............$ 22.61 6.32

OPERATOR: Forklift..............$ 20.28 8.18

SHEETMETAL WORKER................$ 33.23 2.73

SPRINKLER FITTER (Fire Sprinklers)......................$ 29.38 5.49

TRUCK DRIVER: Dump Truck........$ 15.50 9.05

AG-0489-S-10-0253

TRUCK DRIVER: Water Truck.......$ 18.40 5.33

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION