About this file

BOTANY SPREADSHEET

View the file

Other files

File Type Posted
unit_26.pdf PDF
unit_19.pdf PDF
south_half.pdf PDF
unit_23.pdf PDF
unit_25.pdf PDF
unit_11.pdf PDF
unit_14.pdf PDF
unit_27.pdf PDF
unit_21.pdf PDF
unit_28.pdf PDF
unit_22.pdf PDF
unit_30.pdf PDF
unit_17.pdf PDF
unit_12.pdf PDF
FINALBotany_solicitation.doc DOC document
unit_9.pdf PDF
unit_20.pdf PDF
north_half.pdf PDF
unit_18.pdf PDF
unit_32.pdf PDF
unit_31.pdf PDF
unit_10.pdf PDF
unit_13.pdf PDF
unit_33.pdf PDF
Botany Enhancement RX_draft_01.13.10.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bot. Stim. for Contracting

FY2010 Terrestrial Special Botanical Habitat Restoration
ARRA (Stimulus) Contract
1/13/10
Unit No.AcresSpeciesNRIS Site IDNEPALegalLatitudeLongitude5th Field WatershedSlopeAspectElev.Cut all brush & trees except those specified as "No Cut" 1Species Not to Cut1Max Cut DBH Conifers and HardwoodsMinimum Height to CutPile SizeWildlife Restrictions3/4/5POC Management Restrictions Apply6/7Unit No.Spotted Owl Restriction Required 3/Marbled Murrelet Restriction ZONE A 4/Marbled Murrelet - Restriction ZONE B 5/
90.6Lilium kelloggiiProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200741S12W1741 59' 59"124 8' 13"Winchuk River10%1901100YESPILA, PIMO, QUGA4, QUKE10"12"6x4NO9NoNoNo
100.96Lilium kelloggiiProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200741S12W1742 00' 02"124 09' 03"Winchuk River5%2701150YESPILA, PIMO, QUGA4, QUKE10"12"6x44NO10NoYesNo
113.41Lilium kelloggiiProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200741S12W1342 00' 03"124 03' 57"Winchuk River10%280800YESPILA, PIMO, QUGA4, QUKE10"12"6x44NO11NoYesNo
120.46Lilium kelloggiiProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200741S12W1342 00' 12"124 03' 54"Winchuk River5%10900YESPILA, PIMO, QUGA4, QUKE10"12"6x4NO12NoNoNo
132.06Sidalcea malachroidesProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200737S13W3542 19' 29"124 12' 49"Pistol River30%2601000YESPILA, PIMO, QUGA4, QUKE10"12"6x44NO13NoYesNo
141.71Sidalcea malachroidesProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200738S13W0242 18' 42"124 13' 11"Pistol River40%2701600YESPILA, PIMO, QUGA4, QUKE10"12"6x44NO14NoYesNo
170.83Ericameria arborescens061126_ERAR27-0001Botanical Restoration Project CE, Dec. 200939S12W2342 9' 20"124 5' 42"Lower Chetco40%1701900YESERAR27, PILA, PIMO, QUGA4, QUKE10"12"6x4NO17NoNoNo
180.38Ericameria arborescens061126_ERAR27-0002Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200739S12W2942 8' 35"124 8' 19"Lower Chetco5%190950YESERAR27, PILA, PIMO, QUGA4, QUKE10"12"6x4NO18NoNoNo
190.23Ericameria arborescens and Arctostaphylos hispidula061126_ERAR27_0005 & 061126_ARHI5_0031Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200739S11W0642 11' 58"124 3' 19"Lower Chetco5%2002500YESERAR27, ARHI5, PILA, PIMO, QUGA4, QUKE10"12"6x44NO19NoYesNo
201.4Illiamna latibracteata061126_ILLA2_0012Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200736S12.5W2442 26' 41"124 10' 47"Lower Rogue30%2802500YESILLA2,PILA, PIMO, QUGA4, QUKE10"12"6x44YES720NoYesNo
210.82Illiamna latibracteata061126_ILLA2_0013Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200734S11W2342 37' 26"123 59' 28"Lower Rogue5%3603500YESILLA2,PILA, PIMO, QUGA4, QUKE10"12"6x4NO21NoNoYes
224.16Illiamna latibracteata061126_ILLA2_0001Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200734S10W3142 33' 56"123 55' 56"Indigo Creek20%2003900YESILLA2,PILA, PIMO, QUGA4, QUKE10"12"6x4NO22NoNoNo
231.26Illiamna latibracteata061126_ILLA2_0016Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200735S10.5W0642 34' 17"123 56' 37"Rogue River/Illahe Creek20%2803800YESILLA2,PILA, PIMO, QUGA4, QUKE10"12"6x44NO23NoYesYes
244.04Illiamna latibracteata061128_ILLA2_0001Botanical Restoration Project CE, Dec. 200932S11W1742 47' 22"124 0' 15"Upper S. Fork Coquille40%2002200YESILLA2,PILA, PIMO, QUGA4, QUKE10"12"6x44YES724NoYesNo
251.63Arctostaphylos hispidula061126_ARHI5_0022Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200733S12W3642 40' 36"124 4' 55"Rogue River/Illahe Creek20%1703000YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x45YES725NoNoYes
262.85Arctostaphylos hispidula061126_ARHI5_0024Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200734S12W0842 38' 53"124 9' 26"Lobster Creek5%1502800YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x44YES726NoYesNo
276.74Arctostaphylos hispidula061126_ARHI5_0026Botanical Restoration Project CE, Dec. 200937S13W1842 22' 29"124 17' 20"Hunter Creek5%2802200YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES27NoNoNo
282.89Arctostaphylos hispidula061126_ARHI5_0029Botanical Restoration Project CE, Dec. 200938S13W2642 15' 35"124 12' 25"Lower Chetco/Pistol River15%1902400YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x44NO28NoYesNo
3010.97Arctostaphylos hispidula061126_ARHI5_0021Botanical Restoration Project CE, Dec. 200937S13W5&642 24' 22"124 17' 9"Hunter Creek10%1703000YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES730NoNoNo
3125.86Arctostaphylos hispidula061126_ARHI5_0021Botanical Restoration Project CE, Dec. 200937S13W0642 24' 01"124 17' 57"Hunter Creek15%1902700YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES31NoNoNo
324.75Arctostaphylos hispidula061126_ARHI5_0011Botanical Restoration Project CE, Dec. 200937S13W0842 23' 19"124 16' 21"Hunter Creek15%1802300YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES32NoNoNo
334.73Arctostaphylos hispidula061126_ARHI5_0023Botanical Restoration Project CE, Dec. 200934S12W1542 38' 02"124 07' 04"Lobster Creek10%1803200YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES33NoNoNo
Total82.74
1/ Cut all brush and tree species within specified units except the following species: California globe mallow (Illiamna latibracteata-ILLA2), goldenfleece (Ericameria arborescens-ERAR27), Umpqua swertia (Frasera umpquaensis-FRUM), Gasquet manzanita (Arctostaphylos hispidula-ARHI5), western white pine (Pinus monticola-PIMO), and sugar pine (Pinus lambertiana-PILA), Oregon white oak (Quercus garryana- QUGA4), California black oak (Quercus kelloggii-QUKE)
2/ Roadside Pull Back - All slash within 30 feet slope distance of designated roads will be pulled back into the subitem.
3/ SRSO - Seasonal Restriction Spotted Owl- No saw operations may occur between March 1st and June 30.
4/ SRMM - Seasonal Restriction Marbled Murrelet- No saw operations may occur between April 1st and August 5th. During the period August 6th through September 15th, chainsaw operations may begin no earlier than 2 hours after official sunrise and must end 2 hours before official sunset. Sunset and sunrise information will be provide by the Government.
5/ SRMM - Seasonal Restriction Marbled Murrelet- During the period April 1st through September 15th, chainsaw operations may begin no earlier than 2 hours after official sunrise and must end 2 hours before official sunset. Sunset and sunrise information will be provide by the Government.
6/ Port-Orford-Cedar. – Follow POC Management Practices in units specified in table above.
7/ Port-Orford-Cedar - Units infested with POC Root Disease. Treat infested units after treating disease-free units according to POC Management Practices.
Not In Contract-Shelf Stock
Shelf Stock-NOT IN CONTRACT
151.12Sidalcea malachroidesProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200738S13W1942 15' 57"124 17' 5"Pistol River35%15400YESPILA, PIMO, QUGA4, QUKE10"12"6x4NO
160.4Sidalcea malachroidesProposed New SitePlantation Thin EA, Jun. 2002 w/reconsideration Dec. 200738S13W1942 16' 5"124 16' 57"Pistol River20%140400YESPILA, PIMO, QUGA4, QUKE10"12"6x4NO
351.58Arctostaphylos hispidula061126_ARHI5_0003Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200735S11W2842 31' 23"124 01' 16"Illinois River/Lawson Creek10%2301550YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4NO35NoNoYes
364.48Arctostaphylos hispidula061126_ARHI5_0008Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200736S13W1942 26' 47"124 17' 27"Lower Rogue15%1202900YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES36NoNoNo
372.63Arctostaphylos hispidula061126_ARHI5_0006Botanical Restoration Project CE, Dec. 200936S13W2842 25' 45"124 15' 15"Lower Rogue20%901800YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES37NoNoNo
382.4Arctostaphylos hispidula061126_ARHI5_0028Botanical Restoration Project CE, Dec. 200936S13W3442 24' 48"124 13' 37"Lower Rogue25%1803100YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4NO38NoNoNo
393.43Arctostaphylos hispidula061126_ARHI5_0002Botanical Restoration Project CE, Dec. 200940S12W0842 06' 08"124 09' 11"Lower Chetco/Winchuk River5%1902700YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4NO39NoNoNo
404.66Arctostaphylos hispidula061126_ARHI5_0004Botanical Restoration Project CE, Dec. 200938S12W1142 16' 30"124 05' 03"Lower Chetco25%190750YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4NO40NoNoNo
419.84Arctostaphylos hispidula061126_ARHI5_0017Botanical Restoration Project CE, Dec. 200934S12W5&642 39' 41"124 10' 02"Lobster Creek30%1302600YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES741NoNoNo
420.62Arctostaphylos hispidula061126_ARHI5_0027Botanical Restoration Project CE, Dec. 200934S12W2242 37' 13"124 07' 32"Lobster Creek20%1002600YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES742NoNoNo
442.43Arctostaphylos hispidula061126_ARHI5_0017Botanical Restoration Project CE, Dec. 200934S12W0642 40' 1"124 10' 11"Lobster Creek25%2802400YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4YES744NoNoNo
454.96Arctostaphylos hispidula061126_ARHI5_0020Botanical Restoration Project CE, Dec. 200934S11W2642 36' 31"123 59' 00"Rogue River/Illahe Creek15%1702600YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4NO45NoNoYes
482.72Arctostaphylos hispidula?Plantation Thin EA, Jun. 2002 w/reconsideration Dec. 200738S12W0342 17' 25"124 06' 58"Lower Chetco5%1802650YESPILA, PIMO ARHI5, QUGA4, QUKE10"12"6x4NO48NoYesNo

Restrictions

Unit No. Spotted Owl Restriction Required 3/ Marbled Murrelet Restriction ZONE A 4/ Marbled Murrelet - Restriction ZONE B 5/ POC Management Restrictions Apply 6/ 7/

9NoNoNoNO
10NoYesNoNO
11NoYesNoNO
12NoNoNoNO
13NoYesNoNO
14NoYesNoNO
17NoNoNoNO
18NoNoNoNO
19NoYesNoNO
20NoYesNoYES7
21NoNoYesNO
22NoNoNoNO
23NoYesYesNO
24NoYesNoYES7
25NoYesYesYES7
26NoYesNoYES7
27NoNoNoYES
28NoYesNoNO
30NoNoNoYES7
31NoNoNoYES
32NoNoNoYES
33NoNoNoYES
35NoNoYesNO
36NoNoNoYES
37NoNoNoYES
38NoNoNoNO
39NoNoNoNO
40NoNoNoNO
41NoNoNoYES7
42NoNoNoYES7
44NoNoNoYES7
45NoNoYesNO
48NoYesNoNO
1/ Cut all brush and tree species within specified units except the following species: California globe mallow (Illiamna latibracteata-ILLA2), goldenfleece (Ericameria arborescens-ERAR27), Umpqua swertia (Frasera umpquaensis-FRUM), Gasquet manzanita (Arctostaphylos hispidula-ARHI5), western white pine (Pinus monticola-PIMO), and sugar pine (Pinus lambertiana-PILA), Oregon white oak (Quercus garryana- QUGA4), California black oak (Quercus kelloggii-QUKE)
2/ Roadside Pull Back - All slash within 30 feet slope distance of designated roads will be pulled back into the subitem.
3/ SRSO - Seasonal Restriction Spotted Owl- No saw operations may occur between March 1st and June 30.
4/ SRMM - Seasonal Restriction Marbled Murrelet- No saw operations may occur between April 1st and August 5. During the period August 6 through September 15, chainsaw operations may begin no earlier than 2 hours after official sunrise and must end 2 hours before official sunset. Sunset and sunrise information will be provide by the Government.
5/ SRMM - Seasonal Restriction Marbled Murrelet- During the period April 1through September 15, chainsaw operations may begin no earlier than 2 hours after official sunrise and must end 2 hours before official sunset. Sunset and sunrise information will be provide by the Government.
6/ Port-Orford-Cedar. – Follow POC Management Practices in units specified in table above.
7/ Port-Orford-Cedar - Units infested with POC Root Disease. Treat infested units after treating disease-free units according to POC Management Practices.

File details come from the government source that posted it. Updated .