24 Feb 10 Sol AG-0489-S-10-0200.pdf
PDF 1 MB Posted
- Solicitation number
- AG-0489-S-10-0200
About this file
Solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 DBAwagesWA1_dvb.htm | HTM file | |
| Attachment 5 Past Performance.docx | DOCX document | |
| Attachment 4 R-6 Fire Plan Template.docx | DOCX document | |
| Attachment 3 Fire Protection.pdf | ||
| Attachment 1 District Location Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL NO AG-0489-S-10-0200
Gifford Pinchot National Forest
Cowlitz Valley Road Maintenance
NORTH FORK PLANNING AREA ROAD MAINTENANCE
GIFFORD PINCHOT NATIONAL FOREST
REQUEST FOR PROPOSAL
SOLICITATION NUMBER AG-0489-S-10-0200
U.S. Department of Agriculture
EROC-NW CONTRACTING OFFICE
16400 CHAMPION WAY
SANDY, OR 97055
NOTICE TO OFFEROR:
This notice is full and open competition under the small business competitive demonstration program.
PROPOSAL BOOKLET:
Offeror is responsible to verify the proposal booklet is complete. Offeror is also responsible for submitting all required forms and documents with their offer.
Applicable FAR provisions and clauses in this RFP are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at www.arnet.gov/far/. Offerors are strongly encouraged to review provisions and clauses referenced in this document before submitting a proposal.
CENTRAL CONTRACTOR REGISTRATION:
You must register in the Central Contract Registration (CCR) prior to award of this contract. Failure to register prior to contract award will require award to be offered to the next successful registered offeror. See FAR
Subpart 4.1103©. Register online at www.ccr.gov or call toll free: (888) 227-2423.
INSTRUCTIONS TO OFFERORS
GENERAL:
By submission of its offer in accordance with the instructions provided in this Section, the offeror unconditionally assents to the terms and conditions in this solicitation document and in any attachments hereto.
DISCREPANCIES:
If an offeror believes the requirements in this solicitation contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting officer (CO) in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.
SUBMISSION OF OFFERS:
Offerors shall submit the following information by 4:00p.m. Pacific Time, March 29, 2010:
Cost Proposal Instructions. All entries must be made in ink.
(1) Section A - Complete blocks 14, 15, 16, 17, 19, 20a, 20b, and 20c, of the RFP Section A, Standard Form
1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP. These sections constitute the model contract.
(2) Block Section B – Supplies or Services and Prices/Costs, for all items. Any corrections, erasures, whiteout or other changes to your prices must be initialed by the offeror. Contractor must submit an offer on all items to be considered responsive.
(3) Section J – Relevant Past Performance Questionnaire.
(4) Section K - Complete the necessary fill-ins and certifications in the Representations and Certifications. The offeror shall submit only those pages that require a fill-in in the remaining solicitation package.
(5) Bid Bond is required. Reference FAR Provision 52.228-1 for bid bond amount.
The packaging used in submitting the proposal must clearly identify the solicitation number and the date and local time specified in the solicitation for receipt of proposals. Offerors using commercial carriers should ensure that this information is marked on the outermost wrapper. Proposals should be submitted to the following address:
EROC-NW, CONTRACTING OFFICE
ATTN: AG-0489-S-10-0128
16400 CHAMPION WAY
SANDY, OR 97055
http://www.arnet.gov/far/ http://www.ccr.gov/
PART I— SCHEDULE OF ITEMS
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
ITEM 1 - BRUSHING- COWLITZ VALLEY RANGER DISTRICT
SUB-ITEM
NO.
Description Estimated
Quantity Unit Unit Price TOTAL PRICE
842(1)a Cutting Road Side Vegetation
Level 4 & 5 Roads
Mi $____________ $_____ ____
842(2)b Cutting Road Side Vegetation
Level 3 Roads
Mi $_______________ $______ ___
842(3)c Cutting Road Side Vegetation
Level 2 Road
Mi $_______ _____ $_____ ____
851(4)a Danger Tree Removal
(not to exceed 8 inches dbh)
EA $________________ $_____ ____
851(4)b Danger Tree Removal
(not to exceed 24 inches dbh)
EA $______________ $______ ___
851(4)c Danger Tree Removal
(exceeding 24 inches dbh)
EA $______ _____ $______ ____
881(1) Mobilization / Equipment
Moving
LS $______ ______ $______ ____
TOTAL PRICE
ITEM 1
UNIT MEASUREMENTS:
SLM = Single-Lane Mile; DLM = Double Lane Mile, DM = Ditch Mile
Mi = Mile, CY = Cubic Yard; CY/M = Cubic Yard per Mile
EA = Each; LS = Lump Sum;
ITEM 2 – Road and Drainage Maintenance - COWLITZ VALLEY RANGER DISTRICT
SUB-ITEM NO. Description Estimated
807 Equipment rental
807(1) Excavator 40 HOUR $_____________ $_____________
807(2) Backhoe 10 HOUR $_____________ $_____________
807(3) Grader 10 HOUR $_____________ $_____________
807(4) Crawler Tractor 10 HOUR $_____________ $_____________
807(5) Dump Truck 40 HOUR $_____________ $_____________
807(6) Front End Loader 10 HOUR $_____________ $_____________
807(7) Laborer 40 HOUR $_____________ $_____________
811(3) Surface Maintenance
(Level 3 Roads)
SLM $_____ _______ $______ _____
811(4)
Surface Maintenance
(Level 3 Roads)
DLM $_____________ $_____ _____
811(5)
(Level 2 Roads)
SLM $_____________ $____ _____
811(6)
(Level 2 Roads)
DLM $_____ ______ $____ ____
811(7) Shoulder Maintenance 1 RM $_____________ $_____ _____
832(01) Furnish, Load, Haul and place material
832(01)(A) Transport distance 0-5 miles 0 CY $_____________ $____ _____
832(01)(B) Transport distance 5-10 miles 500 CY $_____________ $____ _____
832(01)(C) Transport distance 10-20 miles 4,000 CY $_____________ $____ _____
833(01)(A) Furnish and install 24 inch diameter culvert, 0.064 inch thick for steel and
0.060 inch thick for aluminum
LF
833(01)(B) Furnish and install 36 inch diameter culvert, , 0.064 inch thick for steel and
0.060 inch thick for aluminum
LF
833(02) Culvert Removal 16 EA $_____________ $_____________
833(3) Water Bar Installation 5 EA $_____________ $_____________
833(6)
Cross Ditch Installation
EA $_____________ $______ ____
ITEM 2 – Road and Drainage Maintenance - COWLITZ VALLEY RANGER DISTRICT
(continued)
SUB-ITEM NO. Description Estimated
834(2)
Clean & Recondition Culverts
(18 – 48 inches in diameter )
EA $_____________ $____ _______
834(3)
Clean & Recondition Culverts
(Over 48 inch in diameter)
EA $_____________ $___________
834(4)
Clean Ditches
Mi $_____________ $______ ____
834(6) Clean Drainage Structures 1 Mi $_____________ $___________
861(4) Recondition /Clean traffic gate 2 EA $____________ $____________
881(1) Mobilization / Equipment Moving
LS $____________ $_____ _____
TOTAL PRICE
ITEM 2
UNIT MEASUREMENTS:
SLM = Single-Lane Mile; DLM = Double Lane Mile, Mi = Mile;
RM = Road Mile; DM = Ditch Mile; CY = Cubic Yard; CY/M = Cubic Yard per Mile
EA = Each; LS = Lump Sum;
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under
Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 Scope of Contract
A. Recovery – The intent of this performance based service contract is to provide for roadside brushing and road maintenance of forest roads 2203 (3.5mi), 2208 (5.0mi), 2801 (9.9mi), 2904 (4.2mi), 5500128 (3.1mi), 7802 (7.1mi), and 7802040 (1.8mi) on the Cowlitz Valley Ranger District, Gifford
Pinchot National Forest.
B. The Contractor shall furnish the necessary personnel, material, equipment, services and facilities
(except as otherwise specified), to perform the Statement of Work/Specifications referenced in
Section C.
C. The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.
C-2 Project Location
Cowlitz Valley Ranger District office is located 1 mile East of Randle, WA at milepost 116.1 on U.S. HWY
12 in the Gifford Pinchot National Forest. Roads for maintenance are as follows:
ROAD NUMBER BEGINNING MILEPOST ENDING MILEPOST TOTAL LENGTH
2203 0.0 3.5 3.5
2208 0.0 5.0 5.0
2801 0.0 9.9 9.9
2904 0.0 4.2 4.2
5500128 0.0 3.1 3.1
7802 0.0 7.1 7.1
7802040 0.0 1.8 1.8
TOTAL LENGTH 34.6
C-3 AGAR 452.211-73 Attachments to Statement Of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-4 COORDINATION OF SPECIFICATIONS
A. Relationship Between the Supplemental Specifications and Region Six Standard Specifications
The Supplemental Specifications for this project refine, revise, and add to the requirements stated in the
Region Six Standard Specifications for Maintenance of Roads contained in the contract. The
Supplemental Specifications and the Standard Specifications must be read as a whole to gain a full understanding of the work required. In the case of discrepancies, however, between these specifications, the Supplemental Specifications will take precedence over the Standard Specifications.
C.5 SUPPLEMENTAL SPECIFICATIONS
The Supplemental Specifications correspond to the "800" series Standard Specifications and are included with the Standard Specifications
C-6 FOREST SERVICE SPECIFICATIONS FOR ROAD MAINTENANCE
SPECIFICATION LIST
*SUPPLEMENTAL SPECIFICATIONS
Spec. No. Description Latest Rev. Date
801-1 ILLUSTRATION OF ROAD STRUCTURE TERMS – Drawing 07/97 *
807 EQUIPMENT RENTAL 09/04
808 WORK AREA MANAGEMENT 02/02
811 SURFACE MAINTENANCE 09/04
832 LOAD, HAUL AND PLACE MATERIAL 09/04
833 WATER BAR AND CROSS DITCH INSTALLATION 09/04
833-3 WATERBAR – Drawing 01/06
833-6 DRIVABLE CROSS DITCH – Drawing 01/06
834 CLEAN DITCHES AND DRAINAGE STRUCTURES 09/04
834-1 CLEANING DITCH RELIEF AND CATCH BASIN – Drawing 09/04 *
842 CUTTING ROAD SIDE VEGETATION 09/04
851 HAZARD AND OBSTRUCTION REMOVAL 09/04
851-1 HAZARD AND OBSTRUCTION REMOVAL-Drawing #1 09/04 *
851-2 HAZARD AND OBSTRUCTION REMOVAL -Drawing #2 09/04
861 RECONDITION / CLEAN TRAFFIC GATE 09/04
881 MOBILIZATION / EQUIPMENT MOVING 09/04
807 EQUIPMENT RENTAL
807.01
Service Required
Furnishing and operating equipment and providing laborers as needed.
807.02
Performance Standard
Make equipment available for inspection and approval before use. Furnish the equipment specified in the table below:
Description
Equivalent Min. Size
(caterpillar brand) Attachments Remarks
Excavator 320
Backhoe 416
Grader 120
Crawler
Tractor 5N
Dump Truck 10 Cubic Yard
Loader 950
Laborer 18 years of age
* Make equipment available for inspection and approval before use
807.03
Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
807.04
Acceptable Quality Levels
A. Service Provider shall meet the requirements in FSSS specification 171-Weed and Disease
Prevention included in this contract.
B. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.
C. Equipment shall be operated by a fully trained, qualified, and competent operator at all times.
D. Laborer shall wear hardhat and lace up boots with a minimum boot height of 8‖ and wear other appropriate safety equipment, gloves, ear and eye protection, as needed, when working.
807.05
Measurement
A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider‘s regular work shift, unless otherwise directed in writing by the Contracting Officer.
D. Moving of equipment will be paid at the established hourly rate.
E. Laborer will be paid only for the time work is being performed and will not be paid for travel time to and from the work site.
807.06
Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
Section.
PAY ITEM PAY UNIT
807(1) Excavator Hour
807(2) Backhoe Hour
807(3) Grader Hour
807(4) Crawler Tractor Hour
807(5) Dump Truck Hour
807(6) Front end loader Hour
807(7) Laborer Hour
808 - WORK AREA MANAGEMENT (2/02)
808.01
This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.
808.02
Requirements
A. Traffic Conditions - Unless otherwise provided in the SUPPLEMENTAL SPECIFICATIONS, roads other than those listed for work under Section 835 are open to traffic with not more than fifteen (15) minutes maximum delay time.
B. A plan for satisfactory handling of traffic, approved by the Government, is required prior to initiating or performing work that interferes with use of traveled roadways.
C. Traffic Control Devices
1. Provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD). Provide traffic control for occupied work areas that is in accordance with these specifications. All signs and devices remain the property of the Contractor.
2. Keep traffic devices current with maintenance operation and remove upon completion.
3. Use warning signs to control traffic approaching the work area from either direction and also from side accesses having standard Government rectangular or trapezoidal-shaped route markers with horizontal numbering.
4. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
5. Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
6. Advisory speed plates may be used to control traffic through the work area.
D. Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
E. Contractor's Equipment
1. Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 metric tons
(5½ tons) gross weight.
2. Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.
808.03
Measurement and Payment
No separate measurement or payment will be made for meeting requirements of this Section. All work and materials are incidental to paid work in this contract.
811 SURFACE MAINTENANCE
811.01
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips.
811.02
Performance Standards
Maintenance Level 4 and 5 Roads
A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surface is smooth, compact, crowned or sloped to drain, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently. Unpaved shoulders are shaped to provide a smooth transition from the paved surface and drain efficiently.
Maintenance Level 3 Roads
A road surface is maintained to standard when the surface is compact, crowned, or sloped to drain, without segregation of the surfacing materials. The road surface has no ruts or rills, suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently.
Maintenance Level 2 Roads
A road surface is maintained to standard when the surface is shaped to drain, and where ditches and road surface drainage structures function efficiently. The road surface has no continuous ruts or rills, and no large concentrations of unsuitable materials remain.
811.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the
Contracting Officer.
811.04
Measurement under this Section will be made by the total number of units for each item listed in the
SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway.
Measurement will be to the nearest one-tenth (0.1) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
811.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
Section.
Pay Item Pay Unit
811(1) Surface Maintenance Level 4 & 5 roads Single Lane Mile
811(2) Surface Maintenance Level 4 & 5 roads Double Lane Mile
811(3) Surface Maintenance Level 3 roads Single Lane Mile
811(4) Surface Maintenance Level 3 roads Double Lane Mile
811(5) Surface Maintenance Level 2 roads Single Lane Mile
811(6) Surface Maintenance Level 2 roads Double Lane Mile
811(7) Shoulder Maintenance Road Mile
811.06
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Surface Irregularities (Level 4&5)
Potholes greater than 2" deep and wider than 1 foot
Potholes 2" or less deep and
1 foot or less wide 0 per unit 0 per unit
Rework if greater than 0 major defects *
Rework if greater than 0 minor defects
Washboards greater than 1" deep
Washboards 1” or less deep and not exceeding 20 feet long
0 per unit 0 per unit Rework if greater than 0 major defects *
Rework if greater than 0 0 minor defects
Surface Irregularities (Level 3)
Potholes greater than 2" deep and wider than 1 foot
Potholes 2” or less deep and 1 foot or less wide
0 per unit 0 per unit Rework if greater than 0 major defects *
Rework if greater than 0 minor defects
Washboards greater than 1" deep
Washboards less than 1" deep and not exceeding 20 feet long
0 per unit 0 per unit Rework if greater than 0 major defects *
Rework if greater than 0 minor defects
Road Cross Section (Level 4&5)
Crown or Cross Slope is not U uniform and does not drain as specified on more than 250' of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile
0 0 per unit Rework Rework if greater than 0 minor defects *
Road Cross Section (Level 3)
Crown or Cross Slope is not uniform and does not drain as specified on more than 250' of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile
0 0 per unit Rework Rework if greater than 0 minor defects *
Road Cross Section (Level 2)
Road surface does not drain properly and causes erosion, or obstructs high clearance vehicles
Road surface does not drain properly, but does not cause erosion
0 50’ per 1000’ Rework if greater than 0 major defects *
Rework if greater than 1 minor defect
Oversized Material (Level 3,4&5 aggregate surfaced
Material greater than 3" diameter remaining on the road surface
Material less than 3" diameter remaining on the road surface and traffic safety is not compromised
0 5 per 1000’
Re Rework if greater than 0 major defects *
Rework if greater than 1 minor defect roads)
Oversized Material
(Level 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
0 0 per unit Rework Rework if greater than 0 minor defects *
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by less than 10 %
0 50’ per 1000’ Rework Rework if greater than 1 minor defect *
A loss of more than 10 CY/mile
A loss of less than 10 CY/mile 0 1 per mile
Replace or recover lost material
Accept the loss of material
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised surfacing is segregated over less than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised
0 N/A Rework Accept the loss of surface quality*
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 50’ per 1000’ Repair and Stabilize Revegetate if greater than 1 minor defect *
Compaction Visible displacement occurs under hauling or spreading equipment
N/A
0 N/A Rework N/A
Ditches and Road Drainage Structures
Impeded flow or water diverted out of drainage structures
< 20% impeded, but water will stay in the channel
0 50’ per 1000’ Rework
Rework if greater than 1
Minor defect *
Unpaved Shoulders (Level 3, 4, & 5)
Elevation difference between pavement and shoulder is greater than 1"
Elevation difference between pavement and shoulder is less than 1"
0 50’ per 1000’ Rework than 1
Minor defect *
Material greater than 1/4" diameter remaining on the road surface
Material 1/4" diameter or less remaining on the road surface and traffic safety is not compromised
0 50’ per 1000’ Rework if greater than X major defects *
Rework if greater than 1
Minor defect *
Does not drain away from pavement
Does not drain away from pavement 0 0 Rework Rework
Units have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.
832 – LOAD, HAUL, AND PLACE MATERIALS (09/10/04) 21
832 FURNISH, LOAD, HAUL, AND PLACE CRUSHED AGGREGATE
AS SURFACE ROCK REPLACEMENT
832.01
Prepare road to a smooth, uniform surface. Furnish, load, haul, and place material at designated sites.
832.02
Spread and shape the mixture on the prepared surface in a uniform layer. Do not place the mixture in a layer exceeding 6 inches in compacted thickness. Compact each layer full width.
Roll from the sides to the center, parallel to the centerline of the road. Compact each layer to at least 95 percent of maximum density. Determine the inplace density and moisture content according to AASHTO T 310 or other approved test procedures.
832.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
832.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.
B. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
832.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the
Section 832 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
832(1) Load, Haul, and Place Material Cubic Yard
832(2) Load, Haul, and Place Material Mile
832(3) Load, Haul, and Place Material Lump Sum
832 – LOAD, HAUL, AND PLACE MATERIALS (09/10/04) 22
832.06 Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Slopes
Unstable material left on slopes
Material left on slopes that can be stabilized and won't block drainages
0 10’ per 1000’ Remove
Remove or stabilize in place
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 10’ per 1000’ Repair and Stabilize
Revegetate if greater than 1 minor defect *
Ditches, inlet/outlet channels, streams and catch basins water will be diverted out of the drainage structure or soil enters system
< 20% impeded, but water will stay in the channel. 0 1 per 1000’ Rework
Rework if greater than 1 minor defect
Debris on Road (ML 4-5)
Any debris in traveled way
Debris in traveled way that may slow or impede traffic.
0 0 per 1000’ Rework
Rework
Debris on Road (ML 3) Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic. 0 10’ per 1000’ Rework
Rework if greater than 1 minor defect
Debris on Road (ML 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles 0 10’ per 1000’ Rework
Rework if greater than 1 minor defect
Placed Material (Disposal Sites)
Unstable material on designated sites.
N/A 0 N/A Stabilize
Revegetation No revegetation work done
Revegetation work incomplete 0 50’ per 1000’ than 1 minor defect
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
* Forests have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.
833 DRAINAGE STRUCTURE INSTALLATION OR REPLACEMENT
833.01
Install or remove drainage structures including culverts, water-bars, and cross ditches.
833.02
Drainage structure installation or replacement is complete when designated culverts, water-bars, or cross ditches have been installed to the lines and grades specified, and removed culverts have been properly disposed.
833.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, included in the SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
833.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
B. Linear Foot: Work activities by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot. Culvert bands are incidental to the installation.
833.05
A. Payment will be made under:
Pay Item Description Pay Unit
833(1) Inch corrugated metal pipe, Inch thickness for steel or
Inch thickness for aluminum Linear Foot
833(2) Culvert Removal Each
833(3) Water-bar Installation Each
833(4) Water-bar Installation Mile
833(5) Water-bar Removal Each
833(6) Cross Ditch Installation Each
833(7) Cross Ditch Installation Mile
833(8) Cross Ditch Removal Each
833.06
Description Major Minor
Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Culvert size
Culvert is smaller than the designated diameter shown on the drawings.
Culvert is larger than the designated diameter shown on the drawings.
0 N/A
Remove culvert and replace with designated size
Accept if culvert fits the geometry of the road but pay at designated size otherwise replace
Culvert is shorter than the designated length shown on the drawings.
Culvert is longer than the designated length shown on the drawings. 0 0
Replace or add section to fit geometry of road.
Remove excess culvert and treat cut end, or harden fill slope to prevent erosion and pay for ordered length
Grade and alignment of culvert
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
1 per mile
Remove and replace culvert
Repair if greater than 1 minor defects *
Sag or depression in road after placement of culvert and backfill material
Greater than 2 inch depression in traveled way
2 inch or less depression in traveled way 0
1 per mile
Furnish, place and compact designated material to repair depression.
Repair if greater than 1 minor defects *
Major Minor
Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Removed culvert or pieces left on National Forest System Lands
Culverts or pieces of culvert left on National Forest System Lands
N/A 0 N/A
Remove from National Forest System Lands
N/A
Water-bars and cross ditches
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
2 per 1000’
Rework Rework if greater than 2 minor defects *
Sedimentation
Operations cause or allow sediment to leave site.
N/A 0 N/A
Cease operations until sediment is controlled
N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01
Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.
834.02
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
834.03
A. As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the
Contracting Officer and;
1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area SHOWN ON THE PLANS or in the SUPPLEMENTAL SPECIFICATIONS.
2. Culverts - a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
3. Ditches adjacent to the roadbed.
4. This work does not include bridges, cattle guards, drain dips, or water bars.
834.04
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
834.05
The accepted quantities will be paid at the contract price per unit of measurement for the Section 834 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section.
834(1) Clean and Recondition Culverts 24 inch Diameter and under Each
834(2) Clean and Recondition Culverts Over 24 inch through 48 inch Each
Diameter
834(3) Clean and Recondition Culverts Over 48 inch Diameter Each
834(4) Clean Ditches Mile
834(5) Clean Ditches and Drainage Structures Mile
834(6) Clean Drainage Structures Mile
Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Blocked Culverts Greater than 20 % of end area blocked
20% or less of end area blocked
1 per 1000’
Rework Rework if greater than 1 minor defect *
Damaged Culvert Inlet/outlets
Greater than 20 % of end area blocked
20% or less of end area blocked 0
1 per 1000’
Rework Rework if greater than 1 minor defect *
Impeded flow for ditches, inlet/outlet channels, and catch basins water will be diverted out of the drainage structure or system
< 20% impeded, but water will stay in the channel. 0
1 per 1000’
Rework Rework if greater than 1 minor defect *
Debris on Road (ML 4-5) produced by Service Provider operations.
Any debris in traveled way N/A
0 N/A Rework N/A
Debris on Road (ML 3) produced by Service Provider operations.
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic. 0
10’ per 1000’
Rework Rework if greater than 1 minor defect *
Debris on Road (ML 2) produced by Service Provider operations.
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
10’ per 1000’
Rework Rework if greater than 1 minor defect *
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by 10 % or less
50’ per 1000’
Rework Rework if greater than 1 minor defect *
Backslopes
Undercut back slope will result in destabilization of slope
Undercut back slope will not result in destabilization of slope
10’ per 1000’
Repair and Stabilize
Re vegetate if greater than 1 minor defect *
Vegetation woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow low growing vegetation within 5 feet or more of inlet end of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Leave in place
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work until in compliance
* Forests have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.
842 ROADWAY VEGETATION MAINTENANCE
842.01
Remove vegetation, including trees, on roadway surfaces and roadsides.
842.02
Roadway vegetation maintenance is complete when the vegetation has been removed from the designated treatment area which interferes with traffic, obscures signs, impedes the flow of water or diverts water from drainage structures.
842.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the
Contracting Officer.
Maintenance Level 4 and 5 roads
The treatment area will be SHOWN ON THE PLANS. If plans or supplemental specifications are not included, the treated area includes the roadbed measured from center line to bottom of ditch / or defined road edge, plus an additional 12 feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 24 feet from both sides of centerline of the road. Provide a vertical clearance of
12 feet measured from the road surface elevation. Vegetation shall be removed to a maximum height of
6 inches above ground surfaces. Trees larger than 8 inches diameter breast height are designated to remain.
Maintenance Level 3 roads included, the treated area includes the roadbed measured from center line to bottom of ditch, or defined road edge, plus an additional 8 feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 20 feet from both sides of center line of the road. Provide a vertical clearance of
12 feet measured from the road surface elevation. Vegetation shall be removed to a maximum height of
6 inches above ground surfaces. Trees larger than 8 inches dbh are designated to remain.
Maintenance Level 2 roads included, the treated area includes the roadbed measured from center line to bottom of ditch, or defined road edge, plus an additional 8 feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 12 feet from both sides of center line of the road. Provide a vertical clearance of
12 feet measured from the road surface elevation. Vegetation shall be removed to a maximum height of
6 inches above ground surfaces. Trees larger than 8 inches dbh are designated to remain.
842.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
842.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 842 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
842(1) Vegetation Maintenance Level 4 & 5 roads Mile
842(2) Vegetation Maintenance Level 3 roads Mile
842(3) Vegetation Maintenance Level 2 roads Mile
842.06
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Tree damage
Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole 3 per unit 1 per unit Remove or Treat Treat
Horizontal Clearance
More than 2% not cleared to limits
2% or less not cleared to limits
20’ per 1000’
Rework Rework if greater than 1 minor defect *
Vertical Clearance
More than 2% not cleared to limits
2% or less not cleared to limits
20’ per 1000’
Rework Rework if greater than 1 minor defect *
Height Above ground surface
More than 2% not cleared to limits
2% or less not cleared to limits
20’ per 1000’
Rework Rework if greater than 1 minor defect *
Drainage
Impeded flow or water diverted out of drainage structures.
2% or less impeded, but water will stay in the channel. 0
20’ per 1000’
Rework Rework if greater than 1 minor defect *
Oversized Material (Level 4&5)
Material greater than 3" diameter remaining on the road surface
Material 1” – 3” in diameter remaining on the road surface
0 0 Rework Rework
Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages.
Material 1” - 3" in diameter and 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages.
10 per 1000’
Rework Rework if greater than 1 minor defect *
Oversized Material (Level 3)
Material greater than 3" diameter and 12" in length remaining on the road surface
Material 1” - 3" in diameter and 36" in length remaining on the road surface 0 0 Rework Rework
Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages.
Material 1” - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages.
10 per 1000’
Rework Rework if greater than 1 minor defect *
Oversized Material (Level 2)
Concentrations of material greater than 6" diameter and 3 feet in length remaining on the road surface
Material less than 6" diameter and 3 feet in length remaining on the road surface
5 per 1000’
Rework Rework if greater than 1 minor defect *
Unstable concentrations of material less than 6" diameter and 3 feet in length remaining on the roadway slopes.
N/A 0 0 per unit Rework N/A
Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages.
Material 1” - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages. .
10 per 1000’
Rework Rework if greater than 1 minor defect *
Concentrations (Level 3-5)
Any concentrations that affect sight distance
N/A 0 0 Rework N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures 0 0
Suspend work until in compliance
Suspend work until in compliance
Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
851 HAZARD AND OBSTRUCTION REMOVAL
851.01
Remove and/or stabilize hazards and obstructions.
851.02
Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03
851.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
851.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section
807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
851(1) Logging Out (ML 3-5) Mile
851(2) Logging Out (ML 2) Mile
851(3) Danger Tree Removal Mile
851(4) Danger Tree Removal Each
851(5) Hazard or Obstruction Removal Mile
851(6) Hazard or Obstruction Removal Each
851.04
Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major
Minor
Utilization of Timber
Log lengths do not meet utilization standards
(see SPS or Task Order) N/A 0 N/A
Charge for loss of stumpage
N/A
Stump Heights
Exceed Specified Height by more than 4 inches
Exceed Specified Height by up to
2 inches 0 per mile 2 per mile
Rework if greater than
2 minor defects *
Rework if greater than 2
0 minor defects *
Tree damage caused by Service Provider's operations
Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole 0 per mile 2 per mile Remove or Treat Treat
Impeded flow for ditches, inlet/outlet channels, and catch basins caused by
Service Provider's Operations
Water will be diverted out of the drainage structure or system
20% or less impeded, but water will stay in the channel.
0 50’ per mile Rework
Rework if greater than 1
0 minor defect *
Marked Danger Trees and Snags
Any remaining snags or danger trees that were marked
Any remaining snags O or danger trees that were not marked 0 2 per mile Rework
Assess and Rework
Hazards that interfere with the use of the road
(rocks, logs, etc) (ML 3-5)
Unstable hazards that remain in the Clearing Limits
N/A 0 N/A Rework N/A
Hazards that interfere with the use of the road
(rocks, logs, etc) (ML 2)
Unstable hazards that remain within X distance of the
Traveled way
0 N/A Rework N/A
Log Out
Horizontal clearance - more than 20% not cleared to specified distance
Horizontal clearance 20% or less not cleared to specified distance
0 50’ per mile Rework Rework if greater than 1 minor defect *
Vertical clearance -more than 20% not cleared to specified distance
Vertical clearance 20% or less not cleared to specified distance
0 50’ per mile Rework Rework if greater than 1 minor defect *
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 0 Suspend work until in compliance N/A
1. Units have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.
861 MAINTENANCE of CATTLEGUARDS, TRAFFIC GATES and BARRIERS, GUARDRAILS, and RETAINING WALLS (8/07)
861.01
Maintain cattleguards, traffic gates and barriers, guardrails, retaining walls and appurtenances. Remove traffic gates and barriers.
861.02
A. Cattleguard maintenance is complete when: it is free of structural defects, the deck provides a smooth, stable, compact transition to the adjacent road surface, and presents no traffic or livestock hazards; the wings are functional and secured to the deck and post; debris and other materials have been removed from the vault area to the full depth of the foundation over the entire width; and designated signs are in compliance with
MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
B. Traffic gate maintenance is complete when it is free of structural defects, the gate and all associated posts are stable and the locking mechanism is in working order, the surfaces are free of oxidation and painted, and all designated signs are in compliance with
C. Guardrail maintenance is complete when it is free of structural defects, and all posts and rails are stable, secure, aligned, and in compliance with State Standards and
―AASHTO Roadside Design Guide‖.
D. Guardrail barrier maintenance is complete when it is free of structural defects, all posts and rails are stable, secure and aligned, and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
E. Jersey barrier maintenance is complete when it is stable, aligned and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest
Service Signs and Posters.
F. Rock and earth barrier maintenance is complete when it is stable, aligned and at the dimensions SHOWN ON THE PLANS, and all designated signs are in compliance with
G. Retaining wall maintenance is complete when the wall is stable, aligned and repaired to the original lines and grades, and the materials used are equal to or exceed the original wall material.
H. Removal of gates and barriers is complete when they have been removed and disposed of as designated and the road is passable by the intended traffic.
861.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
861.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
Linear Foot: Work activities by the linear foot measured by using standard survey methods rounded to the nearest one (1) foot.
861.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 861 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
861(1) Maintain one-lane cattleguard Each
861(2) Maintain two-lane cattleguard Each
861(3) Maintain cattleguards Lump Sum
861(4) Maintain traffic gate Each
861(5) Maintain traffic gate Lump Sum
861(6) Maintain guardrail Linear Foot
861(7) Maintain guardrail Lump Sum
861(8) Steel structure component and fastener replacement Lump Sum
861(9) Maintain guardrail barrier Each
861(10) Maintain jersey barrier Each
861(11) Maintain rock/earth barrier Each
861(12) Maintain retaining wall Lump sum
861(13) Remove gate Each
861(14) Remove guardrail barrier Each
861(15) Remove jersey barrier Each
861(16) Remove rock/earth barrier Each
861.06
Description Major Minor
Allowable Defects
Required Action
Defect Defect Major Minor Major Minor
Metal Surfaces
Exposed metal, rust , or oxidation, greater than 25% of surface
Exposed metal, rust, or oxidation, 25% or less of surface
X% per unit Paint or Coat
Repair if greater than X minor defects *
Penetrated rust or oxidation that compromises structural integrity
Penetrated rust or oxidation that does not compromise structural integrity
0 0 Replace component Paint or Coat and notify
Structural Integrity
Major cracks, broken, decomposed, or missing components and fasteners.
Minor cracks, loose components and fasteners.
0 0 Replace component and/or fasteners
Repair component and/or fasteners
Alignment
Greater than 10% deviation from original lines and grades, or non-functional.
10% or less deviation from original lines and grades.
X per unit
Repair or replace Repair if greater than X minor defects *
Allowable Defects
Required Action
Defect Defect Major Minor Major Minor
Vaults/ drainage
Greater than 50% of the vault is full or drainage is impeded.
50% or less of the vault is full and drainage is not impeded.
X per unit
Clean Repair if greater than X minor defects *
Signs/Markers
Missing, non-functional or non-readable
Bent or damaged, but still functional and readable
X per unit
Repair or replace
Repair or replace if greater than X minor defects *
Debris produced by Service Provider operations.
Debris left on road or placed in drainage structures.
N/A 0 N/A Remove from road or drainage N/A
Removed materials or pieces left on National Forest
Unserviceable posts, rails, or other materials left on National Forest
N/A 0 N/A Remove from National Forest N/A
Allowable Defects
Required Action
Defect Defect Major Minor Major Minor
Materials and Methods
Does not conform to
AASHTO,
ASTM, AWPA,
and MUTCD standards and does not meet or exceed the original materials used
0 N/A Reject and replace N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance N/A
881 MOBILIZATION/EQUIPMENT MOVING
881.01
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02
Performance Standards
A. Mobilization is complete when 100% of the personnel, equipment, and materials necessary to complete the work have been moved to the project site.
B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
881.03
Location of Work:
881.04
Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one
(1) mile, from the starting location of the move, to the ordered work site.
881.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the
Section 881 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
881(1) Mobilization Lump Sum
881(2) Mobilization Each
881(3) Equipment Moving Miles
881.06
A. Mobilization is acceptable when all equipment, personnel, and materials are moved to the project site and work has been started.
B. Ordered moves shall be completed within designated hours, unless agreed otherwise.
C. Service Provider shall meet the requirements in FSSS specification 171-Weed and Disease
Prevention included in this contract.
PERFORMANCE STANDARDS
REQUIRED SERVICE STANDARD
MAXIMUM ALLOWABLE
DEGREE OF DEVIATION
FROM REQUIREMENT (AQL)
METHOD OF
SURVEILLANCE
RESULTS OF
EXCEEDING AQL
842(2) Cutting Side Vegetation, Maintenance Levels 4 & 5
Specification 842
& 842 MSF
0%
Visual 25%
Random Sample
842(2) Cutting Side Vegetation, Maintenance Level 3
Specification 842
& 842 MSF
5%
Visual 25%
842(2) Cutting Side Vegetation, Maintenance Level 2
Specification 842
& 842 MSF
20%
Visual 25%
854(1) Removal of Danger
Trees
Specifications 854 0% Visual 25%
881(01) Mobilization Specification 881 N/A N/A N/A
882(01) Equipment Moving Specification 882 0%
Visual 25%
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .