abstract_template-beaver-lake.pdf
PDF 21 KB Posted
- Attached to
- RECOVERY SRD Beaver Lake Trail Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0056
About this file
Bid Abstract
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0056_srd-beaver-lake-trail_amend1.pdf | ||
| AG-0489-S-10-0056_srd-beaver-lake-trail.pdf | ||
| AG-0489-S-10-0056_srd-beaver-lake-trail_sectionjdrawings.pdf | ||
| AG-0489-S-10-0056_srd-beaver-lake-trail_sectionjSite Photos.pdf | ||
| AG-0489-S-10-0056_srd-beaver-lake-trail_sectionjtrail-log.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ABSTRACT Solicitation No. AG-0489-S-10-0056 Bid Opening Date: 12/28/2009
Issuing Office: Project Name: SRD Beaver Lake Trail
EROC NORTHWEST
16400 Champion Way Sandy, OR 97055
Funds Available: $700,000.00
Number of Amendments: 1
Unit Total Unit Total Unit Total Item No. Description Qty Unit Price Price Price 931(01) Single Log Bridges 64 LF $520.00 $33,280.00 $550.00 $35,200.00 $718.75 $46,000.00 931(02) Double Log Bridge 84 LF $260.00 $21,840.00 $350.00 $29,400.00 $715.00 $60,060.00 937(01) Signpost 1 EA $292.50 $292.50 $200.00 $200.00 $200.00 $200.00 941(01) Aggregate Surfacing 995 LF $47.44 $47,202.80 $50.00 $49,750.00 $35.00 $34,825.00 941(02) Aggregate Surfacing w/ Heavy Clearing 1155 LF $105.62 $121,991.10 $80.00 $92,400.00 $40.00 $46,200.00 941(03) Aggregate Surfacing w/ Ditch 769 LF $60.77 $46,732.13 $60.00 $46,140.00 $30.00 $23,070.00 941(04) Aggregate Surfacing w/ Base Course 527 LF $96.90 $51,066.30 $120.00 $63,240.00 $40.00 $21,080.00 941(05) Stone Riser Steps 82 EA $227.50 $18,655.00 $300.00 $24,600.00 $250.00 $20,500.00 941(06) Stone Open Drain 33 EA $260.00 $8,580.00 $300.00 $9,900.00 $400.00 $13,200.00 941(07) Stone Pitching 122 LF $97.50 $11,895.00 $70.00 $8,540.00 $80.00 $9,760.00 941(08) Rest Area 2 EA $3,250.00 $6,500.00 $4,000.00 $8,000.00 $5,000.00 $10,000.00 951(01) Mobilization 1 EA $30,000.00 $30,000.00 $30,000.00 $30,000.00 $70,000.00 $70,000.00 956(01) Laborer Work 10 EA $104.00 $1,040.00 $80.00 $800.00 $50.00 $500.00 956(02) Trail Rehabiliation 1 EA $5,710.00 $5,710.00 $7,000.00 $7,000.00 $10,000.00 $10,000.00
SUBTOTAL - BASE ITEMS $404,784.83 $405,170.00 $365,395.00
937(01) Steel Bridge 1 LS $291,850.00 $291,850.00 $245,000.00 $245,000.00 $165,000.00 $165,000.00
SUBTOTAL - OPTION 1 $291,850.00 $245,000.00 $165,000.00
941(10) Aggregate Surfacing Material 30 CY $585.00 $17,550.00 $800.00 $24,000.00 $600.00 $18,000.00
SUBTOTAL - OPTION 2 $17,550.00 $24,000.00 $18,000.00
TOTAL ALL ITEMS $714,184.83 $674,170.00 $548,395.00
Government Estimate
Oregon Woods PO Box 11680 Eugene, OR
Clarence McReynolds Box 161
White Bird, ID
Sheet1
File details come from the government source that posted it. Updated .