Section J Attachments (Appendix C - Project Plans)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOSIER CR

E FK HOOD R

EMIL CR

N FK MILL

CR

INDIAN CR

NE AL

CR

EV

AN

S C R

RING CR

BEAVER CR

SNAKEHEAD CR

BALDW IN CR

KELLAR CR

W FK NEAL CR

YELLOWJACKET CR

GRISWELL CR

EV

AN

S C R

BA

L DWIN

CR

NEAL CR

EMIL CREEK RESERVOIR

3 125 4

9 987

29 27

20 21

15 14

10 11 12

M.P. 0.00 Begin Project~Road 17 M.P. 0.75

End Project~Road 17

T.

1 S

T.

1 N

R. 10 E.

MT. HOOD STIMULUS PAVING

Road 17 Vicinty Map²

Legend Roads Lakes Streams

SHEET SHEETS

TOTAL

02 12

UV17

UV17

UV35

10 Miles To Hood River

UV35

0 21 Miles

!@ Hood River Ranger Station

R. 11 E.

2 13

5 4

19222120192423

26 2527 30 29 28

20UV46

UV70

UV63

UV63

6322120

CCll aa cc kkaammaass RR iivveerr

UV63

HH oo tt SS pp rr ii nn gg ss FF oo rr kk CC oo ll ll oo ww aa ss hh RR ii vv ee rr

CCoollllo owwaasshh RRi iv ve er r

6320120

6320160

Junction 63 & 70

Little Fan Creek Campground

Raab Campground

Riverford Campground Two Rivers Picnicground

Kingfisher Campground

Red Rock Quarry-Pit Run Junction 7010 & Red Rock Quarry, Travelway Surface Changes From A/C Pavement To Aggregate~M.P. 1.80

T6 S

T7 S

Junction 46 & 63

31 Miles To Estacada

SHEET TOTALSHEETS

03 12

63507015

!9

!9

!9 !9

CCoolllloo wwaasshh R Ri iv ve er r

66332200117700

1 2

UV70

R5E R6E

M.P. 3.30 Junction 70 & 7010

End Project~Road 70

Water Source

Disposal Site Road 7010114

Water Source

MT. HOOD STIMULUS PAVINGRoad 63 & 70 Vicinty Map

B

L e g e n dL e g e n d

ROADS

STREAMS

LAKES

B

QUARRY

0 10.5 Miles

M.P. 3.70 End Project~Road 63

!9

12 Miles To Devil's Ridge Pit

* Designates Contract Quantities ESTIMATE OF QUANTITIES Sheet 4 Of 12

ROAD NUMBER 17 63 70

MILE POST (MILES) 0.75 3.70 3.30

ITEM NO.

DESCRIPTION UNIT

REVISION

DATE QUANTITIES REMARKS

15101 Mobilization Lump Sum 2003 ALL ALL ALL Includes equipment washing and fire protection requirments.

15210 Miscellaneous survey and staking method II, tolerance E Lump Sum 2003 ALL ALL ALL Layout and/or location of sites. Precision class E.

15713 Soil erosion & pollution control Lump Sum 2003 - - ALL

20304 Removal of culvert, disposal method (a) Lump Sum 2003 - - ALL

20415 Unsuitable excavation * Cubic Yard 2003 - 250 1,300 Includes hauling clearing debris to disposal site. Includes stump removal.

20701 Earthwork geotextile type 1-A Square Yard 2003 - 450.0 550.0 Fabric to be used for road prism & underdrain.

25104 Keyed riprap, class 5 * Cubic Yard 2003 - 15 24 Includes 15 cys. Of 6"-18" minus rock haul from Devil's Ridge Stockpile.

26201 Geogrid category 5 Square Yard 2003 - 220.0 1,574.0

30358 Asphalt pavement pulverization Square Yard 2003 570.0 330.0 1,300.0 12-inch depth.

32211 Aggregate surface course, grading D, compaction method B * Cubic Yard 10/07 200 800 500 Commercial Source. Includes processing aggregate with millings.

32222 Pit run maximum size 3-inch, compaction method B * Cubic Yard 10/07 - 150 800 Grading Q, from stockpile at Red Rock Pit.

40401 Minor hot asphalt concrete Ton 2003 1,200.00 5,200.00 1,400.00 ODOT Level 2 1/2 "Dense HMAC", PG. 64-22 asphalt binder.

41551 Paving reinforcement grid, category 1 Square Yard 03/07 - 1,274.0 1,092.0

60202 21-inch span, 15-inch rise Foot 2003 - - 110 Compaction method B.

60506 8-inch collector pipe Foot 2003 - - 300 Includes elbow

60507 8-inch outlet pipe Foot 2003 - - 120

60508 Granular backfill * Cubic Yard 2003 - - 135 Commerical source.

62527 Seeding, fertilizing and mulching, hydraulic or dry method * Acre 2003 - - 1.00 Includes all disturbed areas on Road 63, 70 & disposal site.

63404 Pavement markings type C double yellow center line Mile 2003 1.50 7.40 4.30

63501 Temporary traffic control Lump Sum 2003 ALL ALL ALL

65102

Pit and quarry development Lump Sum 2003 - - ALL

Produce & Stockpile Pit Run. Includes cat work at disposal site for drainage.

Includes Road 63.

* Designates Contract Quantities ESTIMATE OF QUANTITIES Sheet 4 Of 12

ROAD NUMBER 17 63 70

MILE POST (MILES) 0.75 3.70 3.30

ITEM NO.

DESCRIPTION UNIT

REVISION

DATE QUANTITIES REMARKS

* Designates Contract Quantities ESTIMATE OF QUANTITIES Sheet 7 Of 17

Base Roads and Items ROAD NUMBER 4620 4671 5410 5411 6310

MILE POST (MILES) 5.00 3.20 5.80 1.20 5.70

ITEM NO.

DESCRIPTION UNIT

REVISION

DATE QUANTITIES REMARKS

15101

Mobilization Lump Sum 2003 ALL ALL ALL ALL ALL

Includes equipment washing and fire protection requirements.

15210 Miscellaneous survey and staking method II, tolerance E Lump Sum 2003 ALL ALL ALL ALL ALL Layout and/or location of sites. Precision class E.

15713 Soil erosion & pollution control Lump Sum 2003 - - ALL - - Straw shall be certified weed free.

20304 Removal of culvert, disposal method (a) Lump Sum 2003 - - ALL - -

20415 Unsuitable excavation * Cubic Yard 2003 - - 500 800 - Haul clearing to disposal site. Includes stump removal.

25104 Keyed riprap, class 5 * Cubic Yard 2003 - - 30 - -

26201 Geogrid category 5 Square Yard 2003 - - 598.0 1,196.0 -

30304 Road reconditioning, ditch Mile 2003 - - 5.80 1.20 - Includes culvert cleaning.

30311 Road reconditioning, surfacing, compaction method B Mile 2003 5.00 3.20 3.70 1.20 5.70

30358 Asphalt pavement pulverization Square Yard 2003 59,000.0 40,000.0 44,000.0 15,000.0 71,500.0 12-inch depth.

32211 Aggregate surface course, grading D, compaction method B * Cubic Yard 10/07 1,000 1,000 2,000 500 1,500 Commercial Source.

32222

Pit run maximum size 3-inch, compaction method B * Cubic Yard 12/05 - - 550 600 -

Grading Q, from stockpile at Whalehead Pit. Includes rebuilding culvert fill slope.

60202 21-inch span, 15-inch rise Foot 2003 - - 38 - - Compaction method B.

62527 Seeding, fertilizing and mulching, hydraulic or dry method * Acre 2003 - - 0.10 0.40 -

63501 Temporary traffic control Lump Sum 2003 ALL ALL ALL ALL ALL

65102 Pit and quarry development Lump Sum 2003 - - - ALL - Produce & Stockpile Pit Run and Riprap at Whalehead Pit.

MILE POST (MILES) 5.00 3.20 5.80 1.20 5.70

ITEM NO.

DESCRIPTION UNIT

MILE POST (MILES) 5.00 3.20 5.80 1.20 5.70

ITEM NO.

DESCRIPTION UNIT